  • 第1题:

    67 In general, attempts to smooth out period to period resources will _____ the scheduled time and _____ project costs.

    A. Increase, decrease.

    B. Increase, increase

    C. Increase, increase or decrease.

    D. Decrease, decrease.

    E. Decrease, increase


    正确答案:B

  • 第2题:

    ______(increase),new technology is making it easier for us to find alternative methods of testing.


    正确答案:
    Increasingly[解析] 插入语。

  • 第3题:

    根据以下内容,回答235-239题。


    What is the last day to apply for the WHC position? (  )

    A.May 1
    B.May 10
    C.May 17
    D.May 27

    答案:B
    解析:

  • 第4题:

    88 Management reserves are normally defined as a % of the total budget. As a project progresses, the project manager wants the $ value of management reserve to _____, whereas the customer wants the management reserve to _____.

    A. Increase, increase.

    B. Increase, decrease.

    C. Decrease, decrease.

    D. Decrease, increase.

    E. Remain the same, return to customer


    正确答案:E

  • 第5题:

    Refer to Topic TestKing.com in iPAD document.What happens to the network when TestKingX is reconnected and a trunk exists between the two switches?()

    A. All VLANs except the default VLAN will be removed from all switches.

    B. All existing switches will have the students, admin, faculty, Servers, Management,Production, and no-where VLANs.

    C. The VLANs Servers, Management, Production, and no-where will replace the VLANs on SwX.

    D. The VLANs Servers, Management, Production, and no-where will be removed from existing switches.


    参考答案:D

  • 第6题:

    下面英文日期写法错误的是____?

    A.May 1, 2015

    B.1 May,2015

    C.1 May 2015

    D.May 1st, 2015


    10 Oct.,2015