Which two steps are executed in the deployment of Cisco AutoQoS for Enterprise?()A、The customer uses SNMP statistics to create the policy.B、QoS policy templates are generated and installed on the interface.C、RTP is used to generate the policy.D、LLQ,cRTP,a

题目

Which two steps are executed in the deployment of Cisco AutoQoS for Enterprise?()

  • A、The customer uses SNMP statistics to create the policy.
  • B、QoS policy templates are generated and installed on the interface.
  • C、RTP is used to generate the policy.
  • D、LLQ,cRTP,and LFI are used to automatically discover the policy.
  • E、The auto-generated policy is manually optimized before implementation.
  • F、Auto-discovery is used to determine what traffic is on the interface.

相似考题
更多“Which two steps̳”相关问题
  • 第1题:

    Which two steps are the result of associating a blade server?()

    • A、The compute node reboots and is then connected to the CMC
    • B、A compute node is assigned to a service profile
    • C、if the association is successful the cisco UCS manager boots the cisco UUOS to configure the compute  node
    • D、The compute node reboots to reload and then loads NX OS and establishes connections to both the CMC  and the IOMs

    正确答案:B,C

  • 第2题:

    Lower the ladder two steps() ,please !

    • A、too
    • B、more
    • C、little
    • D、few

    正确答案:B

  • 第3题:

    Which two steps check out a database connection from the connection pool?()

    • A、DB Get  
    • B、DB Read  
    • C、DB Write  
    • D、DB Release

    正确答案:B,C

  • 第4题:

    Which two of the following steps are necessary to configure inter-VLAN routing between multilayer switches?()

    • A、Configure a dynamic routing protocol.
    • B、Configure SVI interfaces with IP addresses and subnet masks.
    • C、Configure switch ports with network addresses.
    • D、Configure switch ports with the autostate exclude command.
    • E、Document the MAC addresses of the switch ports.

    正确答案:A,B

  • 第5题:

    A technician installed a new application on a Windows XP desktop. After the application wasinstalled, the technician rebooted the desktop and received a bluescreen error. Which of thefollowing steps should the technician perform?() (Select TWO).

    • A、Boot into Safe Mode
    • B、Replace the motherboard
    • C、Uninstall the application
    • D、Replace the hard drive
    • E、Install more RAM

    正确答案:A,C

  • 第6题:

    多选题
    Which two steps are required for a Kompella Layer 2 VPN?()
    A

    Configure a site ID for each CE

    B

    Configure a VPN label for each VPN

    C

    Configure a MP-BGP session to each PE

    D

    Configure an Extended LDP Session to each PE


    正确答案: A,C
    解析: 暂无解析

  • 第7题:

    多选题
    Which are the two options to which a menu can be assigned?() (Choose two.)
    A

    menu

    B

    functions

    C

    data group

    D

    responsibility

    E

    functional group


    正确答案: B,E
    解析: 暂无解析

  • 第8题:

    多选题
    Which two statements are true about analog to digital conversion of voice signals for use in digital telephony networks?()
    A

    The three required steps in the analog to digital conversion are sampling,encoding,and compression.

    B

    The three required steps in the analog to digital conversion are sampling,quantization,and compression.

    C

    The three required steps in the analog to digital conversion are sampling,quantization,and encoding.

    D

    The output of the sampling process is a pulse code modulation (PCM) signal.

    E

    The output of the sampling process is a pulse amplitude modulation (PAM) signal.


    正确答案: B,E
    解析: 暂无解析

  • 第9题:

    多选题
    Which two steps are performed when configuring a zone?()
    A

    Define a default policy for the zone.

    B

    Assign logical interfaces to the zone.

    C

    Assign physical interfaces to the zone.

    D

    Define the zone as a security or functional zone


    正确答案: D,B
    解析: 暂无解析

  • 第10题:

    多选题
    Which two are correct steps in taking a binary backup of MyISAM tables?()
    A

    Always stop the server prior to the backup

    B

    Stop the server or lock the tables prior to the backup

    C

    Stop the server or lock the databases prior to the backup

    D

    Make a copy of the .frm, .myd, and the .myi files

    E

    Make a copy of the binary log and tablespace files


    正确答案: B,A
    解析: 暂无解析

  • 第11题:

    多选题
    Which two steps check out a database connection from the connection pool?()
    A

    DB Get

    B

    DB Read

    C

    DB Write

    D

    DB Release


    正确答案: B,D
    解析: 暂无解析

  • 第12题:

    多选题
    Which three steps are considered part of the initial configuration?()
    A

    SNMP

    B

    hostname

    C

    root password

    D

    user password

    E

    management access interface


    正确答案: B,A
    解析: 暂无解析

  • 第13题:

    Which two are correct steps in taking a binary backup of MyISAM tables?()

    • A、Always stop the server prior to the backup
    • B、Stop the server or lock the tables prior to the backup
    • C、Stop the server or lock the databases prior to the backup
    • D、Make a copy of the .frm, .myd, and the .myi files
    • E、Make a copy of the binary log and tablespace files

    正确答案:B,D

  • 第14题:

    Which of the following step libraries is included in the license for IPCC Express Standard? ()

    • A、ICM steps  
    • B、e-mail steps  
    • C、media steps 
    • D、database steps

    正确答案:C

  • 第15题:

    What are two steps needed to define a QoS policy for a traffic class?()

    • A、 Determine a minimum bandwidth guarantee.
    • B、 Determine interfaces to which to apply policy.
    • C、 Assign priorities to the class.
    • D、 Configure access control lists.

    正确答案:A,C

  • 第16题:

    Which statement is true about the digital to analog conversion process?()

    • A、the two steps of digital to analog conversion are decompression and reconstruction of the analog signal
    • B、the two steps of digital to analog conversion are decoding and filtering
    • C、the two steps of digital to analog conversion are decompression and filtering of the analog signal
    • D、the two steps of digital to analog conversion are quantization and decoding

    正确答案:B

  • 第17题:

    Which of the following steps should be done FIRST when deploying a Virtual I/O server on a p5-550, which will host three logical partitions: a NIM server and two application servers?()

    • A、Create and install the NIM server
    • B、Create and install the Virtual I/O Server
    • C、Create and install the application servers
    • D、Activate Advanced POWER Virtualization

    正确答案:D

  • 第18题:

    多选题
    Which two steps are the result of associating a blade server?()
    A

    The compute node reboots and is then connected to the CMC

    B

    A compute node is assigned to a service profile

    C

    if the association is successful the cisco UCS manager boots the cisco UUOS to configure the compute  node

    D

    The compute node reboots to reload and then loads NX OS and establishes connections to both the CMC  and the IOMs


    正确答案: C,A
    解析: 暂无解析

  • 第19题:

    单选题
    Which statement is true about the digital to analog conversion process?()
    A

    the two steps of digital to analog conversion are decompression and reconstruction of the analog signal

    B

    the two steps of digital to analog conversion are decoding and filtering

    C

    the two steps of digital to analog conversion are decompression and filtering of the analog signal

    D

    the two steps of digital to analog conversion are quantization and decoding


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    What are two steps that are taken when a router converts a voice signal from analog to digital form?()
    A

     sampling

    B

     packetization

    C

     quantization

    D

     serialization


    正确答案: A
    解析: 暂无解析

  • 第21题:

    多选题
    Which two of these steps are minimum requirements to configure OSPFv3 under IPv6?()
    A

    Configure a routing process using the command ipv6 router ospf [process-id].

    B

    Add the network statement for the interfaces on which OSPF will run.

    C

    Configure OSPF on the interface that it will run on.

    D

    Use the passive-interface command on the interfaces on which OSPF should not run.

    E

    Enable routing.


    正确答案: D,A
    解析: 暂无解析

  • 第22题:

    单选题
    Which of the following step libraries is included in the license for IPCC Express Standard? ()
    A

    ICM steps  

    B

    e-mail steps  

    C

    media steps 

    D

    database steps


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    Final exams were incredibly comprehensive, and went on for two weeks, which length made it seem as if they would never end.
    A

    comprehensive, and went on for two weeks, which length made

    B

    comprehensive and since they went on for two weeks, that made

    C

    comprehensive and, since they went on for two weeks, to make

    D

    comprehensive and went on for two weeks, which made

    E

    comprehensive and, by going on for two weeks, it made


    正确答案: B
    解析:
    原句中“which”的使用不正确。D项表意最清晰。E项中的“it”指代模糊。C项语法上不正确。

  • 第24题:

    单选题
    The ladder shall().
    A

    be secured in a position so that it rests firmly against the ship's side from which the discharge operations are carried out

    B

    have at least two replacement steps which are secured in position by a method different from that used in the original construction

    C

    have battens made of hardwood,or other material of equivalent properties,in one piece and not less than 1.80metres long provided at such intervals as will prevent the pilot ladder from twisting

    D

    have steps made of softwood,or other material of equivalent properties,made in one piece free of knots,having an efficient slip surface


    正确答案: A
    解析: 暂无解析