( )can be considered as part of risk mitigation.
第1题:
Giving a part of project work to a contractor is an example of:
A risk mitigation
B risk assignment
C risk delegation
D risk deflection
E risk assumption
第2题:
It is useful to conduct project risk assessment according to the project's
A charter
B statement of work
C Work Breakdown structure
D network
E budget
第3题:
184 Which of the following activities can be considered as part of risk mitigation
A. risk identification
B. purchasing insurance
C. assessment of outcomes
D. assessment of probabilities
E. C and D only
第4题:
178 "Fast-tracked" projects awarded and begun before all planning and risk assessment information is complete and available may _____ .
A. be completed in reduced overall time than other projects.
B. be in a higher risk category than other projects.
C. not be compatible with project risk and assessment
D. A and B
E. All of the above
第5题:
The most crucial time for project risk assessment is (75) .
A.when a problem surfaces
B.during the planning phase
C.during the close-out phase
D.after the project schedule has been published
第6题:
The most crucial time for project risk assessment is ( ).
A.when a problem surfaces
B.during the planning phase
C.during the close-out phase
D.after the project schedule has been published
第7题:
The(75)process analyzes the effect of risk events and assigns a numerical rating to those risks.
A.Risk Identification
B.Quantitative Risk Analysis
C.Qualitative Risk Analysis
D.Risk Monitoring and Control
第8题:
第9题:
The most crucial time for project risk assessment is ( ).
第10题:
健康危险度评价(health risk assessment)
第11题:
第12题:
风险识别
风险分析
人群脆弱性分析
风险评价
风险沟通
第13题:
Which of the following activities can be considered as part of risk mitigation
A risk identification
B purchasing insurance
C assessment of outcomes
D assessment of probabilities
E C and D only
第14题:
111 It is useful to conduct project risk assessment according to the project's
A. charter
B. statement of work
C. Work Breakdown structure
D. network
E. budget
第15题:
15 Total project risk can be defined as:
A. the sum of the probabilities of project risks events times the sum of consequences of those risks
B. the sum of the products of each project risk event times its consequences
C. the sum of the consequences of all project risk events
D. the sum of the probabilities of all project risk events
E. 1 - the sum of the probabilities of all project risk events
第16题:
听力原文:Although it is a normal part of banking, excessive interest rate risk can pose a significant threat to a bank's earnings and capital base.
(4)
A.Interest rate risk is a normal part of banking operations.
B.Interest rate risk is a terrible threat to banking operations.
C.A bank's earnings and capital base is a normal part of banking.
D.A bank's earnings and capital base can pose a significant threat to banking.
第17题:
Workarounds are determined during which risk management process? (75).
A. Risk identification
B. Quantitative risk analysis
C. Plan risk responses
D. Risk monitoring and control
第18题:
The______process ascertains which risks have the potential Of affecting the proect and documenting the risks' characteristics.
A.Risk Identification
B.Quantitative Risk Analysis
C.Qualitative Risk Analysis
D.Risk Monitoring and Control
第19题:
第20题:
第21题:
The()process analyzes the effect of risk events and assigns a numerical rating to those risks.
第22题:
风险评估(Risk assessment)包括哪几个过程?()
第23题: