On AIX systems, where DNS resolution takes precedence over NIS, a particular process needs to resolve names using /etc/hosts first.  Which of the following processes is the best way to accomplish this without affecting the rest of the system’s name resolu

题目

On AIX systems, where DNS resolution takes precedence over NIS, a particular process needs to resolve names using /etc/hosts first.  Which of the following processes is the best way to accomplish this without affecting the rest of the system’s name resolution?()

  • A、Set the NSORDER environmental variable of the environment which invokes the process to:NSORDER="local,nis,bind"
  • B、Set the NSORDER environmental variable of the environment which invokes the process to:  NSORDER="hosts=auth,nis,bind"
  • C、Edit /etc/netsvc.conf to add a line similar to the following: process /full/path/of/process {hosts=local,nis,dns}
  • D、Unset NSORDER environment variable of the environment which invokes the process

相似考题
更多“On AIX systems,̳”相关问题
  • 第1题:

    Where will an administrator find documents in PDFformat that include detailed architecture and step-by-step installation instructions for Power servers?()

    • A、AIX Fix Central
    • B、IBM Developer Works
    • C、IBM Systems Software Information Center
    • D、IBM Systems Hardware Information Center

    正确答案:D

  • 第2题:

    In addition to AIX, which of the following operating systems is supported in a pSeries LPAR environment?()

    • A、z/OS
    • B、Linux
    • C、Sun Solaris 9
    • D、Microsoft Windows 2003

    正确答案:B

  • 第3题:

    Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()

    • A、AIX
    • B、IBM i
    • C、Linux
    • D、VIO Server

    正确答案:B

  • 第4题:

    Where will an administrator find documents in PDF format that include detailed architecture and step-by-step installation instructions for Power servers?() 

    • A、AIX Fix Central
    • B、IBM Developer Works
    • C、IBM Systems Software Information Center
    • D、IBM Systems Hardware Information Center

    正确答案:D

  • 第5题:

    New AIX systems arrive without a CDROM drive. All systems do not have the system hardware configuration. Which of the following options is the most appropriate way to install AIX on the systems?()

    • A、Install CDROM drives or tape drives on the systems because that is the only way to install AIX.
    • B、Install one system. Take a mksysb from the first system and resotre the mksysb to the remaining systems.
    • C、Install one system. Mirror rootvg onto a disk from each of the remaining systems.
    • D、Setup and NIM master and resources.

    正确答案:D

  • 第6题:

    Which is a supported method to upgrade firmware on an IBM Power Systems 570?()

    • A、Use the /usr/sbin/invscout AIX command
    • B、Use the 'Updates' panel on the managing HMC
    • C、Boot the 570 using an IBM-provided microcode CD
    • D、Use the /usr/lpp/diagnostics/bin/update_flash AIX command

    正确答案:B

  • 第7题:

    POWER Systems产品支持哪种操作系统?()

    • A、Windows和AIX
    • B、只有AIX
    • C、AIX、LINUX和i5/OS
    • D、AIX和LINUX

    正确答案:C

  • 第8题:

    A large customer is consolidating their pSeries systems onto a p5 590. They will have a requirement for a single device (disk, lun) to have multiple paths through different  adapters in a single LPAR. The primary applications were written for AIX 5.2. Which of the following would be the recommended solution to satisfy this requirement?()

    • A、Assign the adapters to a Virtual IO partition
    • B、Use the MPIO function included in AIX 5.2
    • C、Migrate the application to AIX 5.3 and use the MPIO function
    • D、Set up two Virtual IO partitions and attach both partitions to the device

    正确答案:B

  • 第9题:

    Which of the following is a correct statement about rPerf?()

    • A、It can only be used on systems running without partitions.
    • B、It is relevant for IBM systems running the AIX operating system.
    • C、It is the main benchmark for sizing systems that will run HPC applications.
    • D、It has a direct relationship with other benchmarks like TPC-C and SpecjAppServer2004.

    正确答案:B

  • 第10题:

    单选题
    Users complain an AIX server is running slow.  Which of the following commands can be run to determine what is consuming systems resources?()
    A

     tprof

    B

     lpstat

    C

     ps aux

    D

     entstat


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    Which of the following is a correct statement about rPerf?()
    A

    It can only be used on systems running without partitions.

    B

    It is relevant for IBM systems running the AIX operating system.

    C

    It is the main benchmark for sizing systems that will run HPC applications.

    D

    It has a direct relationship with other benchmarks like TPC-C and SpecjAppServer2004.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A customer has implemented several IBM AIX systems over the past several years and feels comfortable with their AIX skills.  They are planning to implement their first HACMP cluster of two p5-570s.  Which of the following should be included in the IBM proposal?()
    A

    HACMP Hardware Services

    B

    p5-570 differences update

    C

    HACMP SmoothStart Services

    D

    AIX installation education


    正确答案: C
    解析: 暂无解析

  • 第13题:

    Companycom is migrating from p670 systems running AIX 5.2 to p5 595 systems running AIX 5.3. They will be changing out only the system units. They will re-use the existing 61D drawers and adapters with the new p5 595 systems. What compatibility issue must be considered?() 

    • A、APV features are not supported for some legacy POWER4 adapters
    • B、APV will require the most current maintenance level for AIX 5.2
    • C、APV features will require that legacy POWER4 adapters be updated with new microcode
    • D、The Virtual IO Server must run AIX 5.3 and the LPARs can run either AIX 5.2 or AIX 5.3

    正确答案:A

  • 第14题:

    Which is a supported method to upgrade firmware on an IBM Power Systems 570?()  

    • A、Use the /usr/sbin/invscout AIX command.
    • B、Use the ’Updates’ panel on the managing HMc
    • C、Boot the 570 using an IBM-provided microcode Cd
    • D、Use the /usr/lpp/diagnostics/bin/update_flash AIX command.

    正确答案:B

  • 第15题:

    A hospital customer with an experienced AIX and Microsoft Windows staff wants to consolidate all of their file/print services onto fewer systems.  They currently use multiple Microsoft Windows-based Intelsystems that are experiencing reliability problems.  They also have POWER4+ systems that are running multiple AIX LPARs that have experienced no reliability issues. They need at least 99.99% uptime. Which solution will meet their uptime needs at the lowest cost?()

    • A、Combine the file/print servers onto a larger Intel-based machine (x445).
    • B、Bring up a Linux LPAR on the pSeries and run Samba to provide file/print services.
    • C、Bring up another AIX LPAR on the pSeries and run Samba to provide file/print services.
    • D、Bring up another AIX LPAR on the pSeries and run Connect Direct to provide file/print services.

    正确答案:C

  • 第16题:

    A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()

    • A、Linux will be restricted to the p650 system, as it is not supported on the p630.
    • B、The customer can run Linux on all the existing systems with or without the presence of AIX.
    • C、Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.
    • D、Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.

    正确答案:B

  • 第17题:

    Which operating system can directly host managed storage for IBM i, AIX, Linux, VMware and Windows on a Power Systems server?()

    • A、AIX
    • B、IBMi
    • C、Linux
    • D、VIO Server

    正确答案:B

  • 第18题:

    A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()

    • A、PowerVM Standard Edition
    • B、VMControl Standard Edition
    • C、Hardware Management Console
    • D、IBM Systems Director Standard Edition

    正确答案:D

  • 第19题:

    A customer has systems with AIX 6.1 and 5.3 distributed across two data centers located 8km apart. They want to implement high availability with automated application restart and synchronous data replication between the IBM Systems Storage DS8700 systems which are installed in each datacenter. Which solution addresses the customer requirements?()

    • A、Use the Geographic Logical Volume Manager (GLVM) for MetroMirror, and Live Partition Mobility to automate partition migration upon failure
    • B、Use MetroMirror for the AIX volumes and High Availability Disaster Recovery (HADR) to automate partition migration and restart upon failure.
    • C、Use the Geographic Logical Volume Manager (GLVM) for MetroMirror to replicate the data between the two sites and automate application recovery.
    • D、Use MetroMirror for the AIX volumes, and PowerHA SystemMirror Enterprise Edition to automate failover of MetroMirror pairs and automate application recovery.

    正确答案:D

  • 第20题:

    Companycom tells the technical sales specialist that recent announcements state that virtual lan in the datacenter is the best option. The customer wants to use interpartition communication to save on adapters and increase performance. The systems are going to have shared and dedicated processor partitions. Some of the partitions will be running AIX 5.2 and some will be running AIX 5.3. The second p5 590 will be running a mixture of AIX 5.3 and Linux partitions with 2.6 kernel. What limitations of vlan/interpartition  communication should be discussed with this customer?()

    • A、Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet is supported on AIX 5L and Linux 2.5 and above. 
    • B、Virtual Ethernet can be used within groups of shared OR groups of dedicated processor partitions, but not both simultaneously. Virtual Ethernet comes with AIX 5L, and is supported in AIX 5.2 or AIX 5.3 partitions, but not Linux. 
    • C、Virtual Ethernet can be used in both shared and dedicated processor partitions. Virtual Ethernet can run in an AIX 5.3 or Linux 2.6 Kernel, but not AIX 5.2 partitions. Virtual Ethernet can only connect partitions within a single system. 
    • D、Virtual Ethernet uses the system processors for all communication functions instead of offloading that load to processors on network adapter cards. Virtual Ethernet can connect partitions between systems if the HMC is shared between systems.

    正确答案:C

  • 第21题:

    A manufacturing business is presently supporting multiple UNIX platforms and considering the advantages of consolidating environments, adding new applications and standardizing on HP-UX with IA-64. Which advantage should be communicated as the most compelling reason to consider pSeries as the platform of choice?()

    • A、The pSeries family of servers offers many choices from small entry servers to data-center class systems
    • B、pSeries systems support both AIX and Linux operating systems providing a single platform for both environments
    • C、AIX contains the tools and utilities necessary to convert all their UNIX software onto a single pSeries server
    • D、Thousands of AIX operating system-based applications, middleware, and tools are available today and already optimized

    正确答案:D

  • 第22题:

    单选题
    Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()
    A

    APV, AIX5.2ML4

    B

    AIX5.3 or i5/OS

    C

    APV, i5/OS, AIX5.3

    D

    APV, AIX5.3 or SuSE9


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A customer with p615, p630 and p650 pSeries servers installed and running AIX is considering Linux as an additional environment. Which Linux capabilities can the pSeries Sales Specialist present as choices that are available to enhance the existing systems?()
    A

    Linux will be restricted to the p650 system, as it is not supported on the p630.

    B

    The customer can run Linux on all the existing systems with or without the presence of AIX.

    C

    Linux can run in LPARs on the existing systems but Linux will require the presence of AIX in at least one LPAR.

    D

    Linux can be installed on all existing systems but will require the AIX Linux Affinity libraries to boot the systems and run Linux.


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    A financial company is auditing to ensure their systems are safe from external attack.They have just purchased new Power 750 servers. Which features of AIX 6.1 will help in the auditing process?()
    A

    IPSec and Kerberos Authentication

    B

    Secure By Default and AIX Security Expert

    C

    Trusted Execution and Role Based Access Control

    D

    First Failure Data Capture and Storage Protection Keys


    正确答案: D
    解析: 暂无解析