A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()A、Two switch ports will be needed o

题目

A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()

  • A、Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
  • B、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
  • C、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.
  • D、One switch port will be needed on one switch, a splitter will be needed to split the connection, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.

相似考题
更多“A project requires a new server”相关问题
  • 第1题:

    37 The difference between a project and a program is that:

    A. A program is made up of multiple projects

    B. A program requires at least three times longer to plan than a project

    C. A project is a one-shot deal while a program is on-going

    D. A and C

    E. B and C


    正确答案:D

  • 第2题:

    ● The difference between a project and a program is that:

    A A program is made up of multiple projects

    B A program requires at least three times longer to plan than a project

    C A project is a one-shot deal while a program is on-going

    D A and C

    E B and C


    正确答案:D

  • 第3题:

    You are the administrator of a 12 SQL Server 2000 computers. These servers are located in company offices throughout the world.

    You configure a multiserver job on the server in your company's New York City office. You configure this server as a master server, and designate the remaining 11 servers as target servers.

    After the job completes successfully, you decide to set up a new SQL Server 2000 computer as the master server. The new server will be named JobMaster and the other 12 servers will be target servers.

    You need to make the New York City server a target server instead of a master server. What should you do?

    A.On the New York City server, defect all 11 target servers. On the JobMaster server, enlist the 12 servers as target servers.

    B.On the JobMaster server, enlist all other servers as target servers.

    C.On the New York City server enlist the JobMaster server as a target server. Transfer the multiserver jobs from the New York City server to the JobMaster server.

    D.On the JobMaster server, enlist the New York City server as a target server. On the JobMaster server, enlist the other 11 servers as target servers. On the JobMaster server, defect the New York City server.


    正确答案:A
    解析:Explanation:Whensettingupanewmasterserver,theoldmasterservermustdefectallitstargetservers.Whenanewlydesignatedmasterserverreplacesanexistingmasterserver,thetargetserversmustbedefectedfromtheexistingmasterserver.Thetargetserverscanthenbeenlistedonthenewmasterserver.Thiscanincludetheexistingtargetserver.Note:InSQLServer2000EnterpriseEdition,multiserveradministrationisusedtoautomatetheadministrationofmultipleinstancesofSQLServer2000.Itcanbeusedtomanagetwoormoreserversandtoscheduleinformationflowsbetweenenterpriseserversfordatawarehousing.Withmultiserveradministration,theremustbeatleastonemasterserverandatleastonetargetserver.Amasterserverdistributesjobstoandreceiveseventsfromtargetservers.Amasterserverstoresthecentralcopyofjobdefinitionsforjobsrunontargetservers.Targetserversconnectperiodicallytotheirmasterservertoupdatetheirlistofjobstoperform.Ifanewjobexists,thetargetserverdownloadsthejobanddisconnectsfromthemasterserver.Afterthetargetservercompletesthejob,itreconnectstothemasterserverandreportsthestatusofthejob.WithSQLServer2000EnterpriseEdition,masterserverscanenlisttargetserversandcandefecttargetservers.IncorrectAnswers:B:ThissolutiondoesnotaddresstheneedtodemotetheNewYorkCityserver.Itisthusstillamasterserver.C:InthissolutiontheJobMasterserverisenlistedasatargetserveroftheNewYorkCityserver.ThissolutionalsodoesnotaddresstheneedtodemotetheNewYorkCityserver.Itisthusstillamasterserver.D:InthissolutiontheNewYorkCityserverisnotatargetserveroftheJobMasterserverasithasbeendefectedfromtheJobMasterserver.

  • 第4题:

    Your company has a branch office that is configured as a separate Active Directory site and has an Actrve Directory domain controller. The Active Directory site requires a local Global Catalog server to support a new application. You need to configure the domain controller as a Global Catalog server. Which tool should you use()

    • A、The Dcpromo.exe utility
    • B、The Server Manager console
    • C、The Computer Management console
    • D、The Active Directory Sites and Services console
    • E、The Actrve Directory Domains and Trusts console

    正确答案:D

  • 第5题:

    在KeilμVision3里,若要打开项目,应进行()操作

    • A、运行File/New命令
    • B、运行File/Project命令
    • C、运行Project/New命令
    • D、运行Project/NewProject命令

    正确答案:D

  • 第6题:

    While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()

    • A、NPIV and vSCSI both require multipathing in VIO Server only. 
    • B、NPIV requires multipathing software on client LPARs, vSCSI requires multipathing software on VIO Server. 
    • C、NPIV requires multipathing software on VIO Server, vSCSI requires multipathing software on client LPARs. 
    • D、NPIV requires multipathing and MPIO software on VIO Server LPARs, vSCSI requires multipathing software on VIO Server and MPIO on client LPARs.

    正确答案:B

  • 第7题:

    A customer needs a new database server.  Their third-party application requires Microsoft SQL Server.  They have 100 users who will login to the network and store their data files on the network server.  They will also require the server to be an email server and to deploy a central antivirus solution.  Which of the following network operating systems would satisfy these requirements?()

    • A、SuSE Linux Enterprise 9
    • B、Red Hat Linux Advanced Server 3
    • C、Microsoft Windows 2003 Server Web Edition
    • D、Microsoft Windows 2003 Server Standard Edition

    正确答案:D

  • 第8题:

    A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()

    • A、Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
    • B、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
    • C、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.
    • D、One switch port will be needed on one switch, a splitter will be needed to split the connection, two ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.

    正确答案:B

  • 第9题:

    A system administrator is deploying a new POWER5 server. The application requires AIX 5L V5.2.  Which of the following virtualization technologies can be used?()

    • A、DLPAR
    • B、Micro-Partitioning
    • C、Virtual Storage
    • D、Virtual Ethernet

    正确答案:A

  • 第10题:

    Your company has a server that runs Windows Server 2008 R2.You have a new application that locates remote resources by name. The new application requires IPv6.You need to ensure that the application can locate remote resources by using IPv6. What should you do?()

    • A、CreateanewPointer(PTR)DNSrecord.
    • B、CreateanewQuad-A(AAAA)DNSrecord.
    • C、CreateanewSignature(SIG)DNSrecord.
    • D、CreateanewRouteThrough(RT)DNSrecord.

    正确答案:B

  • 第11题:

    单选题
    Your company has a server that runs Windows Server 2008 R2.You have a new application that locates remote resources by name. The new application requires IPv6.You need to ensure that the application can locate remote resources by using IPv6.What should you do?()
    A

    Create a new Pointer (PTR) DNS record.

    B

    Create a new Quad-A (AAAA) DNS record.

    C

    Create a new Signature (SIG) DNS record.

    D

    Create a new Route Through (RT) DNS record.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    Your company has a branch office that is configured as a separate Active Directory site and has an  Active Directory domain controller.   The Active Directory site requires a local Global Catalog server to support a new application.  You need to configure the domain controller as a Global Catalog server.  Which tool should you use()
    A

    The Dcpromo.exe utility

    B

    The Server Manager console

    C

    The Computer Management console

    D

    The Active Directory Sites and Services console

    E

    The Active Directory Domains and Trusts console


    正确答案: A
    解析: 暂无解析

  • 第13题:

    80 Project leadership requires that the project manager pay attention simultaneously to the:

    A. Tasks to be performed and needs of the team

    B. Quantity and quality of the work to be performed

    C. Efficiency and effectiveness of the team

    D. Time, cost and performance deliverables

    E. All of the above


    正确答案:E

  • 第14题:

    It seems that the new project in Nanjing will be even() than your current project.

    A、good

    B、best

    C、better


    参考答案:C

  • 第15题:

    The project requires more labor than ________.

    [A] has been put in

    [B] have been put in

    [C] being put in

    [D] to be put in


    正确答案:A

  • 第16题:

    建立菜单的命令是().

    • A、NEW MENU
    • B、CREATE MENU
    • C、NEW PROJECT
    • D、CREATE PROJECT

    正确答案:B

  • 第17题:

    Why is it important to have a final meeting on a project that has been cancelled?()

    • A、Document lessons learned
    • B、Assign responsibility
    • C、Close budget
    • D、Begin new project

    正确答案:A

  • 第18题:

    A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()

    • A、Suggest a cloud network
    • B、Direct the customer to redbooks and white papers on FC technologies
    • C、Work with business partner to include Lab Service engagement to setup FC environment and perform knowledge transfer
    • D、Switch project to iSCSI

    正确答案:C

  • 第19题:

    While using virtualization to share SAN adapters on a server, how does Node Port ID Virtualization (NPIV) differ from Virtual SCSI (vSCSI) related to the use of multipathing software?()

    • A、NPIV andvSCSI both require multipathing in VIO Server only.
    • B、NPIV requiresmultipathing software on client LPARs, vSCSI requires multipathing software on VIO Server.
    • C、NPIV requiresmultipathing software on VIO Server, vSCSI requires multipathing software on client LPARs.
    • D、NPIV requiresmultipathing and MPIO software on VIO Server LPARs, vSCSI requires multipathing   software on VIO Server and MPIO on client LPARs.

    正确答案:B

  • 第20题:

    What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()

    • A、The new system requires 1 installed processor card for the GX++ bus adapter
    • B、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter
    • C、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter
    • D、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter

    正确答案:B

  • 第21题:

    You have two servers that run Windows Server 2008 named Server1 and Server2. You install Windows SharePoint Services (WSS) 3.0 on Server1. You install the SMTP feature on Server2. You configure the outgoing e-mail settings on Server1 to use the SMTP service on Server2. You need to ensure that e-mail messages from Server1 are forwarded to users. What should you do?()

    • A、On Server2, create a new application pool, and then associate the application pool with a new Web site.
    • B、On Server2, configure the SMTP service to accept anonymous connections and to relay e-mail messages.
    • C、On Server1, create a new application pool. On an internal DNS server, create a new MX record for Server1.
    • D、On Server1, create a new application pool. On an internal DNS server, create a new MX record for Server2.

    正确答案:B

  • 第22题:

    单选题
    What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()
    A

    The new system requires 1 installed processor card for the GX++ bus adapter

    B

    The new system requires a minimum of 2 installed processor cards for the GX++ bus adapter

    C

    The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapter

    D

    The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand  cluster adapter


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()
    A

    Two switch ports will be needed on a switch,two Ethernet cables will be needed for theserver each connecting to two different Ethernet cards,and one IP address will be needed

    B

    Two switch ports will be needed on two different switches two Ethernet cables will beneeded for the server each connecting to two different Ethernet cards,and one IP address will be needed

    C

    Two switch ports will be needed on two different switches,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,two different IP addresses will be needed

    D

    One switch port will be needed on one switch,a splitter will be needed to split the connection,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,and two different IP addresses will be needed


    正确答案: C
    解析: 暂无解析

  • 第24题:

    单选题
    You are a systems administrator responsible for securing a Windows Server 2008 Web server. You havecreated a new Web site called Contoso Intranet that will contain seven Web applications. One of theapplication developers has told you that her Web application requires a new request handler that isprocessed using a .NET library her team created. How can you meet these requirements while also maximizing security for the server?()
    A

    Add a new managed handler to the Contoso Intranet Web site.

    B

    Add a new managed handler for the specific Web application that requires it.

    C

    Add a new module mapping to the Contoso Intranet Web site.

    D

    Add a new module mapping for the specific Web application that requires it.


    正确答案: A
    解析: 暂无解析