A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased 

题目

A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()

  • A、The room temperature has reached 23C (73.4F). 
  • B、A Blade within the chassis has been shut down. 
  • C、The ambient temperature in the data center has increased 
  • D、One of the additional System X servers in the BladeCenter rack has failed.

相似考题
更多“A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased ”相关问题
  • 第1题:

    A customer has an IBM System Storage Enterprise Storage Server and several EMC CX3 systems installed in a data center, attached to IBM System p servers. As a step toward data consolidation, they intend to put all data on a new DS8700.  What would be the most important data migration factors to consider()

    • A、sector size and the amount of production data
    • B、existing RAID levels and the disk drive speed
    • C、sector size and existing RAID levels
    • D、amount of production data and the disk drive speed

    正确答案:D

  • 第2题:

    An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()

    • A、Rack cooling equipment failure
    • B、Dust collection in the server
    • C、Server processor failure
    • D、Server power supply failure

    正确答案:B

  • 第3题:

    A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()

    • A、BladeCenter E
    • B、BladeCenter H
    • C、BladeCenter T
    • D、BladeCenter HT

    正确答案:A

  • 第4题:

    A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers.  This is the first p650 in the enterprise.  What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()

    • A、Have the PDU requirements been met?
    • B、Are there sufficient KVM connections?
    • C、Is there sufficient service clearance?
    • D、Is there sufficient space in the existing rack?

    正确答案:A

  • 第5题:

    A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()

    • A、Copper Pass-thru Modules only support 1000Mb line speeds. 
    • B、Spanning Tree has been enabled on the Copper Pass-thru Module. 
    • C、The customer does not have the latest firmware loaded on the Copper Pass-thru Module. 
    • D、The customer is using LS21 Blades 

    正确答案:A

  • 第6题:

    A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers.  Which of the following should the Sales Specialist emphasize to address the pricing difference?()

    • A、Higher rack density that reduces data center footprints
    • B、Internal upgrades that only IBM can offer
    • C、Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches 
    • D、The Rear Door Heat eXchanger that only IBM can offer

    正确答案:C

  • 第7题:

    A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()

    • A、Redundant power supplies on the servers
    • B、Redundant PDUs in the rack
    • C、edundant power supplies in the servers and redundant PDUs in the rack
    • D、Redundant power supplies in the servers, redundant PDUs in the rack, and Active Energy Manager (AEM)

    正确答案:C

  • 第8题:

    A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()

    • A、Disk Magic
    • B、TPC for Data
    • C、CLARiiON Procedure Generator
    • D、System Storage Interoperability Center

    正确答案:D

  • 第9题:

    A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()

    • A、Have optional Fibre Channel and Ethernet switches been installed in the server?
    • B、What is the available kVA value of the UPS?
    • C、Are there sufficient empty socket outlets in the UPS?
    • D、What is the impact on the power consumption of the data center cooling system?

    正确答案:B

  • 第10题:

    单选题
    A customer purchased a new IBM xSeries x445.  They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server.  The rack houses an existing UPS unit for the entire rack.  Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()
    A

    Have optional Fibre Channel and Ethernet switches been installed in the server?

    B

    What is the available kVA value of the UPS?

    C

    Are there sufficient empty socket outlets in the UPS?

    D

    What is the impact on the power consumption of the data center cooling system?


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()
    A

    BladeCenter E

    B

    BladeCenter H

    C

    BladeCenter T

    D

    BladeCenter HT


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()
    A

    Rack cooling equipment failure

    B

    Dust collection in the server

    C

    Server processor failure

    D

    Server power supply failure


    正确答案: C
    解析: 暂无解析

  • 第13题:

    After a server has been installed into a rack, an administrator must ensure which of the following?()

    • A、Warm air flow is permitted through the front bezel
    • B、The system is labeled so that it can be identified
    • C、Verify the change control process can be implemented
    • D、Determine the correct power requirements

    正确答案:B

  • 第14题:

    A patch has been applied to the operating system.  After rebooting, the system is hung.  Which of the following commands should have been performed to prevent the system from hanging?()

    • A、 lppchk, bosboot 
    • B、 lslpp -l, oslevel 
    • C、 installp -C, lppchk 
    • D、 bosboot, synclvodm 

    正确答案:A

  • 第15题:

    An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()

    • A、the XIV system can be scaled by the addition of modules
    • B、XIV offers thin provisioning for all available host operating systems
    • C、reduced operating costs will pay for another XIV system in less than two years
    • D、the management GUI allows the administrator tovirtualize the entire storage system quickly

    正确答案:A

  • 第16题:

    Which is the packaging strategy of iDataPlex of the following?()

    • A、Fourteen servers per rack likeBladeCenter
    • B、Two servers per rack for optimal cooling cost
    • C、One server per rack for optimal cooling and energy efficiency
    • D、Four servers per rack (twoexach half high) for optimal cooling

    正确答案:B

  • 第17题:

    You have a request to put together IBM System x and blade servers attached to IBM DS4000 Storage: all in a rack. Your customer is also requesting services.  What IBM resource will help you put these different products together?()

    • A、IBM System x and BladeCenter Business Partner Guidebook
    • B、IBM Sizing Guides
    • C、IBM Configuration & Options Guide (COG)
    • D、IBM Standalone Solutions Configuration Tool (SSCT)

    正确答案:D

  • 第18题:

    While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()

    • A、IBM DS5000 Cabling Tool
    • B、IBM e-Configurator Tool
    • C、IBM Pre-Installation TDA Checklist
    • D、IBM Standalone Solutions Configuration Tool

    正确答案:C

  • 第19题:

    An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix of the following?()

    • A、Add Rear Door HeateXchanger
    • B、Add fans to the top of the racks
    • C、Increase circulation from Data Center raised floor
    • D、Change to perforated doors

    正确答案:D

  • 第20题:

    An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix? ()

    • A、Add Rear Door Heat eXchanger 
    • B、Add fans to the top of the racks 
    • C、Increase circulation from Data Center raised floor 
    • D、Change to perforated doors

    正确答案:D

  • 第21题:

    单选题
    A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()
    A

    Disk Magic

    B

    TPC for Data

    C

    CLARiiON Procedure Generator

    D

    System Storage Interoperability Center


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    After a server has been installed into a rack, an administrator must ensure which of the following?()
    A

    Warm air flow is permitted through the front bezel

    B

    The system is labeled so that it can be identified

    C

    Verify the change control process can be implemented

    D

    Determine the correct power requirements


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()
    A

    Copper Pass-thru Modules only support 1000Mb line speeds. 

    B

    Spanning Tree has been enabled on the Copper Pass-thru Module. 

    C

    The customer does not have the latest firmware loaded on the Copper Pass-thru Module. 

    D

    The customer is using LS21 Blades 


    正确答案: A