A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()
第1题:
A customer has an IBM System Storage Enterprise Storage Server and several EMC CX3 systems installed in a data center, attached to IBM System p servers. As a step toward data consolidation, they intend to put all data on a new DS8700. What would be the most important data migration factors to consider()
第2题:
An SNMP alert has been generated by a server in the main data center.The alert stated that the internal temperature of the server has exceeded the threshold.No other servers in the rack have experienced problems,and no other alerts have come from that server about any other events.Which of the following is the cause of this issue?()
第3题:
A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()
第4题:
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()
第5题:
A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()
第6题:
A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers. Which of the following should the Sales Specialist emphasize to address the pricing difference?()
第7题:
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()
第8题:
A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()
第9题:
A customer purchased a new IBM xSeries x445. They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server. The rack houses an existing UPS unit for the entire rack. Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()
第10题:
Have optional Fibre Channel and Ethernet switches been installed in the server?
What is the available kVA value of the UPS?
Are there sufficient empty socket outlets in the UPS?
What is the impact on the power consumption of the data center cooling system?
第11题:
BladeCenter E
BladeCenter H
BladeCenter T
BladeCenter HT
第12题:
Rack cooling equipment failure
Dust collection in the server
Server processor failure
Server power supply failure
第13题:
After a server has been installed into a rack, an administrator must ensure which of the following?()
第14题:
A patch has been applied to the operating system. After rebooting, the system is hung. Which of the following commands should have been performed to prevent the system from hanging?()
第15题:
An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()
第16题:
Which is the packaging strategy of iDataPlex of the following?()
第17题:
You have a request to put together IBM System x and blade servers attached to IBM DS4000 Storage: all in a rack. Your customer is also requesting services. What IBM resource will help you put these different products together?()
第18题:
While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()
第19题:
An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix of the following?()
第20题:
An insurance customer installs two BladeCenter chassis in a rack with glass doors. After a short time, the blowers in both BladeCenters increase to full speed, and then one fails. Apart from replacing the broken blower, which additional action is required for a long term fix? ()
第21题:
Disk Magic
TPC for Data
CLARiiON Procedure Generator
System Storage Interoperability Center
第22题:
Warm air flow is permitted through the front bezel
The system is labeled so that it can be identified
Verify the change control process can be implemented
Determine the correct power requirements
第23题:
Copper Pass-thru Modules only support 1000Mb line speeds.
Spanning Tree has been enabled on the Copper Pass-thru Module.
The customer does not have the latest firmware loaded on the Copper Pass-thru Module.
The customer is using LS21 Blades