An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMCB、A

题目

An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

  • A、An additional switch for the new HMC
  • B、Asynchronous adapters on the new HMC
  • C、The two 570 servers are directly connected to the new HMC
  • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

相似考题
更多“An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMCB、As”相关问题
  • 第1题:

    An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()

    • A、An additional switch for the new HMc  
    • B、Asynchronous adapters on the new HMc
    • C、The two 570 servers are directly connected to the new HMc  
    • D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

    正确答案:A

  • 第2题:

    Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()

    • A、An 8-port adapter to the HMC
    • B、A hub for the private network
    • C、An additional Ethernet card to the HMC
    • D、An additional Ethernet card for each partition

    正确答案:B

  • 第3题:

    Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()

    • A、Free up one HMC and update the software for use with the p5 570
    • B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC
    • C、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570
    • D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

    正确答案:A

  • 第4题:

    A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()

    • A、The routes on the HMC
    • B、The firewall setting of the LAN adapter
    • C、The name resolution protocol on the p5 590 server
    • D、The subnet mask settings on the Ethernet adapters

    正确答案:B

  • 第5题:

    The IP address of POWER6 595 is showing up in the HMC instead of the server name. Next to the IP address is the status, which shows ailedThe IP address of POWER6 595 is showing up in the HMC instead of the server name. Next to the IP address is the status, which shows ailed Authentication The system administrator needs to enter a password. Which password is needed to restore connection for the POWER6 595 to the HMC?()  

    • A、The hscroot user password.
    • B、The CE password.
    • C、The HMC password.
    • D、The ASM admin password.

    正确答案:C

  • 第6题:

    An administrator is applying a corrective service to their HMC. The corrective service has been shipped on 3 DVDs. Which action will ensure the corrective service is correctly installed?()

    • A、Select the option to automatically reboot the HMC
    • B、Select the option to automatically reboot the HMC after each disk
    • C、Shutdown all managed LPARs prior to beginning the install process
    • D、Copy all disks into the "SERVICE" directory and select concurrent install

    正确答案:A

  • 第7题:

    A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()

    • A、A VIO server requires a dedicated LHEA port.
    • B、There is a limit of 32 LPARs per virtual LAN.
    • C、Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.
    • D、Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.

    正确答案:A

  • 第8题:

    单选题
    Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()
    A

    Order a POWER5 HMC

    B

    Connect to the existing HMC

    C

    Install an 8-port asynchronous card in the managed server to connect to the existing HMC

    D

    Install an additional network card to the existing HMC and connect to the POWER5 service processor


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()
    A

    An 8-port adapter to the HMC

    B

    A hub for the private network

    C

    An additional Ethernet card to the HMC

    D

    An additional Ethernet card for each partition


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()
    A

    Free up one HMC and update the software for use with the p5 570

    B

    Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC

    C

    Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570

    D

    Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()
    A

    An 8-port adapter to the HMC

    B

    A hub for the private network

    C

    An additional Ethernet card to the HMC

    D

    An additional Ethernet card for each partition


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
    A

    An additional switch for the new HMc  

    B

    Asynchronous adapters on the new HMc

    C

    The two 570 servers are directly connected to the new HMc  

    D

    One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc


    正确答案: C
    解析: 暂无解析

  • 第13题:

    A network administrator needs to add an additional connection to a room. The administrator adds a new Ethernet switch and must connect it to an existing switch. Which cable type should be used to connect the two switches?()

    • A、CAT3 cable
    • B、Serial cable
    • C、Crossover cable
    • D、Rollover cable

    正确答案:C

  • 第14题:

    The IP address of POWER6 595 is showing up in the HMC instead of the server name.Next to the IP address is the status,which shows Failed Authentication.The system administrator needs to enter a password.  Which password is needed to restore connection for the POWER6 595 to the HMC?()

    • A、The hscroot user password.
    • B、The CE password.
    • C、The HMC password.
    • D、The ASM admin password.

    正确答案:C

  • 第15题:

    A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()

    • A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
    • B、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
    • C、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based  systems connected to the existing one
    • D、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

    正确答案:A

  • 第16题:

    A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()

    • A、Purchase a second HMC and use this to manage the new servers.
    • B、Connect all of the new servers to the existing private HMC network.
    • C、Configure a second private network on their existing HMC for the new servers.
    • D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

    正确答案:B

  • 第17题:

    A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()

    • A、Implement a proxy server to provide multiple sources to one destination 
    • B、Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two 
    • C、Purchase a network hub or switch so both p5 570s can connect to the single HMC 
    • D、Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used

    正确答案:C

  • 第18题:

    A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()

    • A、Order a new HMC to support the p5 system.
    • B、Attach the new p5 system to the existing HMC.
    • C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
    • D、Do nothing.  This system does not require an HMC.

    正确答案:A

  • 第19题:

    A system administrator wants to control the HMC from their workstation. Microsoft Windows 2000 is running and the HMC graphical user interface is being used remotely. Which of the following actions will accomplish this task?()

    • A、Use any Windows 2000 to graphically access the HMC
    • B、Load, install, and configure WebSM on the workstation
    • C、Telnet to the HMC using Exceed or a GUI emulator product from the workstation
    • D、Load, install, and configure OpenSSH or SSH on the workstation and access the HMC through the GUI interface

    正确答案:B

  • 第20题:

    单选题
    An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
    A

    An additional switch for the new HMC

    B

    Asynchronous adapters on the new HMC

    C

    The two 570 servers are directly connected to the new HMC

    D

    One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    The IP address of POWER6 595 is showing up in the HMC instead of the server name.Next to the IP address is the status,which shows Failed Authentication.The system administrator needs to enter a password.  Which password is needed to restore connection for the POWER6 595 to the HMC?()
    A

    The hscroot user password.

    B

    The CE password.

    C

    The HMC password.

    D

    The ASM admin password.


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    An administrator is applying a corrective service to their HMC. The corrective service has been shipped on 3 DVDs. Which action will ensure the corrective service is correctly installed?()
    A

    Select the option to automatically reboot the HMC

    B

    Select the option to automatically reboot the HMC after each disk

    C

    Shutdown all managed LPARs prior to beginning the install process

    D

    Copy all disks into the SERVICE directory and select concurrent install


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    The IP address of POWER6 595 is showing up in the HMC instead of the server name. Next to the IP address is the status, which shows ailedThe IP address of POWER6 595 is showing up in the HMC instead of the server name. Next to the IP address is the status, which shows ?ailed Authentication? The system administrator needs to enter a password. Which password is needed to restore connection for the POWER6 595 to the HMC?()
    A

    The hscroot user password.

    B

    The CE password.

    C

    The HMC password.

    D

    The ASM admin password.


    正确答案: B
    解析: 暂无解析