When planning for secure communications between a partner and the Point of Contact, at what level is the SSL connection defined?()A、each individual partner within a single federationB、all federations configured for an instance of IBM Tivoli Federated Iden

题目

When planning for secure communications between a partner and the Point of Contact, at what level is the SSL connection defined?()

  • A、each individual partner within a single federation
  • B、all federations configured for an instance of IBM Tivoli Federated Identity Manager (ITFIM)
  • C、each individual federation within an instance of ITFIM
  • D、all federation functionality fronted by a single instance of IBM Tivoli Access Manager for e-business WebSEAL

相似考题
更多“When planning for”相关问题
  • 第1题:

    — () — I’m planning to go to Canada for further study.

    A.Why are you going to resign your current job?

    B.When do you intend to resign your current job?

    C.What is your intention after resigning your current job?


    参考答案:C

  • 第2题:

    ideally, lesson planning should be done at two levels: _______________.

    A. before-class planning and after-class planning

    B. before-class preparation and after-class feedback

    C. before-class planning and after-class reflection

    D. macro planning and micro planning


    正确答案是:D

  • 第3题:

    The most crucial time for project risk assessment is (75) .A.when a problem surfacesSXB

    The most crucial time for project risk assessment is (75) .

    A.when a problem surfaces

    B.during the planning phase

    C.during the close-out phase

    D.after the project schedule has been published


    正确答案:A
    项目风险评估最重要的时间是:当问题呈现时在规划阶段在收尾阶段在项目进度发布后

  • 第4题:

    When planning for VoWLAN capacity during a site survey, how many simultaneous calls can beestimated per 5 GHz channel?()

    • A、7
    • B、14
    • C、20
    • D、30

    正确答案:C

  • 第5题:

    When planning high availability, which two components are important to minimize the effect of outages?()

    • A、work staff attributes, such as skills and communication
    • B、redundancy, to prevent single points of failure
    • C、processes, such as documentation, change control, and labs
    • D、appropriate technology, such as hardware and software
    • E、tools, such as those for monitoring and reporting

    正确答案:B,D

  • 第6题:

    Which of the following is the MOST important consideration when looking at distance requirements when planning a hot site?()

    • A、Avoiding more expensive bandwidth costs for data lines between regions
    • B、Avoiding a regional disaster that affects both the main site and the hot site
    • C、Avoiding a second location that has high latency between sites
    • D、Avoiding a location that is too expensive

    正确答案:B

  • 第7题:

    Which of the following people does IBM recommend be involved with a Pre-Sales Solutions Assurance Review?()

    • A、The customer executive who is funding the project
    • B、IBM Global Financing when they are financing the purchase
    • C、Subject matter experts representing each component of the solution
    • D、Hardware installation planning representative responsible for the installation

    正确答案:C

  • 第8题:

    单选题
    Which of the following people does IBM recommend be involved with a Pre-Sales Solutions Assurance Review?()
    A

    The customer executive who is funding the project

    B

    IBM Global Financing when they are financing the purchase

    C

    Subject matter experts representing each component of the solution

    D

    Hardware installation planning representative responsible for the installation


    正确答案: C
    解析: 暂无解析

  • 第9题:

    单选题
    When planning for a logically partitioned system,which of the following should be used as part of a review to ensure that each partition has the required resources? ()
    A

    Use the Workload Estimator capacity planning tool.

    B

    Use prtconf output from legacy systems.

    C

    Use the LPAR Validation Tool.

    D

    Use Performance Management Services.


    正确答案: B
    解析: 暂无解析

  • 第10题:

    多选题
    When planning for redundant power sources in a server deployment, which of the following should be purchased?()
    A

    RAID controllers

    B

    Multiple UPSs

    C

    Redundant cooling

    D

    Dual NICs

    E

    Redundant power supplies


    正确答案: C,E
    解析: 暂无解析

  • 第11题:

    单选题
    As for a lesson plan,a teacher says,"When do lesson planning,I always prepare some extra and alternative tasks and activities so that I have the options to cope with the unexpected situations." According to the teacher's words, we can know that the teacher follows the principle of______ in lesson planning.
    A

    linkage

    B

    variety

    C

    flexibility

    D

    learnability


    正确答案: D
    解析:

  • 第12题:

    多选题
    When planning high availability, which two components are important to minimize the effect of outages?()
    A

    work staff attributes, such as skills and communication

    B

    redundancy, to prevent single points of failure

    C

    processes, such as documentation, change control, and labs

    D

    appropriate technology, such as hardware and software

    E

    tools, such as those for monitoring and reporting


    正确答案: D,C
    解析: 暂无解析

  • 第13题:

    (b) Explain the matters that should be considered when planning the nature and scope of the examination of

    Cusiter Co’s forecast balance sheet and income statement as prepared for the bank. (7 marks)


    正确答案:
    (b) Matters to be considered
    Tutorial note: Candidates at this level must appreciate that the matters to be considered when planning the nature and
    scope of the examination are not the same matters to be considered when deciding whether or not to accept an
    engagement. The scenario clearly indicates that the assignment is being undertaken by the current auditor rendering any
    ‘pre-engagement’/‘professional etiquette’ considerations irrelevant to answering this question.
    This PFI has been prepared to show an external user, the bank, the financial consequences of Cusiter’s plans to help the bank
    in making an investment decision. If Cusiter is successful in its loan application the PFI provides a management tool against
    which the results of investing in the plant and equipment can be measured.
    The PFI is unpublished rather than published. That is, it is prepared at the specific request of a third party, the bank. It will
    not be published to users of financial information in general.
    The auditor’s report on the PFI will provide only negative assurance as to whether the assumptions provide a reasonable basis
    for the PFI and an opinion whether the PFI is:
    ■ properly prepared on the basis of the assumptions; and
    ■ presented in accordance with the relevant financial reporting framework.
    The nature of the engagement is an examination to obtain evidence concerning:
    ■ the reasonableness and consistency of assumptions made;
    ■ proper preparation (on the basis of stated assumptions); and
    ■ consistent presentation (with historical financial statements, using appropriate accounting principles).
    Such an examination is likely to take the form. of inquiry, analytical procedures and corroboration.
    The period of time covered by the prospective financial information is two years. The assumptions for 2008 are likely to be
    more speculative than for 2007, particularly in relation to the impact on earnings, etc of the investment in new plant and
    equipment.
    The forecast for the year to 31 December 2007 includes an element of historical financial information (because only part of
    this period is in the future) hence actual evidence should be available to verify the first three months of the forecast (possibly
    more since another three-month period will expire at the end of the month).
    Cusiter management’s previous experience in preparing PFI will be relevant. For example, in making accounting estimates
    (e.g. for provisions, impairment losses, etc) or preparing cash flow forecasts (e.g. in support of the going concern assertion).
    The basis of preparation of the forecast. For example, the extent to which it comprises:
    ■ proforma financial information (i.e. historical financial information adjusted for the effects of the planned loan and capital
    expenditure transaction);
    ■ new information and assumptions about future performance (e.g. the operating capacity of the new equipment, sales
    generated, etc).
    The nature and scope of any standards/guidelines under which the PFI has been prepared is likely to assist the auditor in
    discharging their responsibilities to report on it. Also, ISAE 3400 The Examination of Prospective Financial Information,
    establishes standards and provides guidance on engagements to examine and report on PFI including examination
    procedures.
    The planned nature and scope of the examination is likely to take into account the time and fee budgets for the assignments
    as adjusted for any ‘overlap’ with audit work. For example, the examination of the PFI is likely to draw on the auditor’s
    knowledge of the business obtained in auditing the financial statements to 31 December 2006. Analytical procedures carried
    out in respect of the PFI may provide evidence relevant to the 31 December 2007 audit.

  • 第14题:

    We should keep in mind()the feedback is very helpful for planning future meetings and events.

    A. what

    B. that

    C. when


    参考答案:B

  • 第15题:

    The most crucial time for project risk assessment is ( ) .

    A.when a problem surfaces
    B.during the planning phase
    C.during the close-out phase
    D.after the project schedule has been published

    答案:B
    解析:
    进行项目风险评估最关键的时候是规划阶段。A.问题出现时 B.规划阶段 C.结束阶段 D.项目进度公布后

  • 第16题:

    When planning for voice deployments with the Cisco Unified Wireless IP Phone 7921G handset in amultifloor building with a WLAN that operates at an 11 MB/s data rate, how many decibelsreferenced to 1 milliwatt of same-channel separation are recommended between floors?()

    • A、13 dBm
    • B、19 dBm
    • C、25 dBm
    • D、31 dBm

    正确答案:B

  • 第17题:

    ()is the management system to control the material consumed, reduce inventory in the manufacture company.

    • A、DRP (Distribution Resource Planning) 
    • B、LRP (Logistics Resource Planning)
    • C、MRP (Material Requirements Planning)
    • D、ERP (Enterprise Resource Planning)

    正确答案:C

  • 第18题:

    When planning for redundant power sources in a server deployment, which of the following should be purchased?()

    • A、RAID controllers
    • B、Multiple UPSs
    • C、Redundant cooling
    • D、Dual NICs
    • E、Redundant power supplies

    正确答案:B,E

  • 第19题:

    When does the Online Planning Worksheet tool run a validation?()

    • A、When loading and activating a definition file into an inactive cluster
    • B、When exporting a definition to a cluster node or saving a definition file
    • C、When importing a definition from an active cluster or saving a definition file
    • D、When loading a definition into an active cluster or synchronizing a definition file

    正确答案:C

  • 第20题:

    单选题
    When does the Online Planning Worksheet tool run a validation?()
    A

    When loading and activating a definition file into an inactive cluster

    B

    When exporting a definition to a cluster node or saving a definition file

    C

    When importing a definition from an active cluster or saving a definition file

    D

    When loading a definition into an active cluster or synchronizing a definition file


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    What is NOT a problem area when loading barges on a LASH type vessel? ()
    A

    Frequent stability calculations required

    B

    Thorough pre-planning required

    C

    Limiting depths alongside berths restrict barge drafts

    D

    Minimum trim and 0°list are required for optimum operations


    正确答案: A
    解析: 暂无解析

  • 第22题:

    单选题
    When planning for VoWLAN capacity during a site survey, how many simultaneous calls can beestimated per 5 GHz channel?()
    A

    7

    B

    14

    C

    20

    D

    30


    正确答案: B
    解析: 暂无解析

  • 第23题:

    问答题
    Practice 6  Task Sheet:  A: WHAT IS IMPORTANT WHEN...?  Planning a presentation  ● Audience  ● Equipment needed  ●…  B: WHAT IS IMPORTANT WHEN...?  Selecting an interpreter for a meeting with foreign clients  ● Experience  ● Reliability ·  ●…  C: WHAT IS IMPORTANT WHEN...?  Introducing a new product range onto the market  ● Timing  ● Advance publicity  ●…

    正确答案: 【参考范例】
    If you choose A:
    When planning a presentation, you need to have an idea of the target audience, including how much the audience know about the topic of your presentation, what their interests are, the reason why they will come to your presentation. By doing so, your presentation will be interesting and meaningful for the target audience and you can better appeal to your audience as a result.
    Moreover, you need to figure out the equipment needed for the presentation, like over-head projector, computer, microphone, acoustics for the venue in which the presentation will take place, etc. Make sure that the equipment will be available and in good condition on the presentation day:
    In addition, good preparation is also very important to ensure the quality of the presentation an make you less nervous on the big day.
    If you choose B:
    When selecting an interpreter for a meeting with foreign clients, make sure the interpreter is experienced in interpreting for such meetings, which means he or she should have a wide range of knowledge about business management and the background of the target country. He or she also need to be familiar with the special terms and jargons for commercial negotiations, finance, law and so on.  .
    What’s more, the interpreter should be reliable. That is to say, he or she must be punctual for the meetings, keep information learned at the meetings confidential and interpret what is being discussed as accurately as possible.
    If you choose C:
    When introducing a new product range onto the market, timing is very important. The introduction should be made at an appropriate time, for instance when the market is matured for having this new product range, by which means there will be prospective customers for the products. In case that similar products are to be introduced onto the market by competitors, make sure that the introduction is made ahead in order to grab the utmost possible market share.
    Furthermore, advance publicity is necessary for its significant role in paving the way for the introduction. Advance publicity can be implemented in a variety of ways. For example, hold a news conference to declare the introduction, do some advertising on TV/radio, in newspapers/magazines, or send samples of the new product to potential customers’ houses, etc.
    解析: 暂无解析

  • 第24题:

    单选题
    As for a lesson  plan ,a teacher says,“When do lesson planning, I always prepare some extra and alternative tasks and activities so that I have the options to cope with the unexpected situations.” According to the teacher’s words, we can know that the teacher follows the principle of ______in lesson planning.
    A

    linkage

    B

    variety

    C

    flexibility

    D

    learnability


    正确答案: A
    解析: