A customer has recently purchased some IBM x445 servers running Red Hat Enterprise AS 3 and wants to connect them to their existing EMC Clarion SAN controller. Which of the following steps must be taken in order to validate the solution?()
第1题:
A customer has an existing SP system and needs to add cards to some of the nodes. Which of the following applications must be used to configure the upgrade?()
第2题:
A customer wants to integrate an x445 running SuSE with their existing EMC storage infrastructure. Which of the following tasks needs to be done to ensure that the solution will work properly?()
第3题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第4题:
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()
第5题:
A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path. From the following options, which is the preferred migration path?()
第6题:
A customer wants to implement a clustered database solution on their existing x445 servers. A minimum of four nodes must participate in the cluster, and the customer wishes to use open standards. Which of the following best satisfies their requirements?()
第7题:
A customer has purchased a new Junos Pulse Access Control Service and wants to install it in an existing cluster.After initial configuration, the customer finds that the firmware version running on the Junos Pulse Access Control Service is 4.1 r5, but the existing cluster is running firmware version 4.1 r3. Which two actions must be performed to allow the new Junos Pulse Access Control Service to load the older version of firmware?()
第8题:
Order a POWER5 HMC
Connect to the existing HMC
Install an 8-port asynchronous card in the managed server to connect to the existing HMC
Install an additional network card to the existing HMC and connect to the POWER5 service processor
第9题:
VNX
VPLEX
V-Series
USP-V
第10题:
N7900
N6040
DS3300
DS3500
第11题:
Novell NetWare Cluster Services
Red Hat Enterprise Linux Cluster Suite
Microsoft Windows 2003 Server with MSCS
Microsoft Windows 2003 Enterprise Edition
第12题:
Do the web servers require SMP capability?
Is the web content static or dynamic information?
What is the average CPU utilization of the existing web servers?
Will the servers need a SCSI or Fibre Channel storage solution?
What are the expected growth rates for the web servers?
第13题:
An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN that is now configured with an EMC Symmetrix subsystem disk. The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()
第14题:
An existing IBM customer has some iSeries servers in their environment. The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications. The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms. Which of the following will accomplish this?()
第15题:
A storage specialist is proposing a solution consisting of an IBM System Storage TS3200 TapeLibrary and a SAN Volume Controller, both of which are being added to a customer’s existing SANenvironment for the first time. Which of the following should be completed before the proposal ispresented to the customer?()
第16题:
A manufacturing customer has an existing SAN for their AIX servers and they want to add theirWindows servers with file level access to their existing storage pool. Which of the following is thelowest cost solution?()
第17题:
A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()
第18题:
A customer needs to deploy a SAN and connect nine servers running a mix of Windows and Linux. They currently need 12TB, but their growth requirements will be tripled in the near future. They will also consolidate 18 legacy Windows servers onto one system using virtualization software and connect that server to the storage solution. A DS4000 series backup solution needs to be included in the design. Which of the following solutions will satisfy these requirements?()
第19题:
A customer has determined they want to install an IBM x445 system in their company. They will be running a large database on the system. In order to determine how many CPUs will be needed to attain the optimum cost-effective solution, which TWO of the following questions should be asked?()
第20题:
IBM System Storage DS8000: Host Systems Attachment Guide
DS8000 Interoperability Matrix
IBM System Storage DS8000: Introduction and Planning Guide
IBM System Storage Solution Handbook
第21题:
Download the latest drivers from EMC for Red Hat Advanced Server.
Ensure that the EMC storage server is configured properly and has the latest firmware levels.
Verify the equipment is on the ServerProven list and complete a Solution Assurance Review (SAR).
Ensure that the systems are connected to the EMC SAN controller.
第22题:
The EMC storage specialist has not participated in the TDA meeting
The FC HBAs are 4 Gbps technology
The Technical and Delivery Assessment review actions were not executed
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
第23题:
The customer used their IBM Customer Number
The customer has activated their base warranty
The customer purchased Remote Technical Support Servicepac
The customer escalated the issue to the Duty Manager