A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increas

题目

A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()

  • A、increase the buffer credits on the HBAs
  • B、increase the number of device logins on the ESX servers
  • C、additional paths will be required between the servers and storage
  • D、multipath option on the ESX servers should be changed to round-robin

相似考题
更多“A customer is planning to upgra”相关问题
  • 第1题:

    A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()

    A.0

    B.1

    C.2

    D.4


    参考答案:A

  • 第2题:

    Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase.()

    • A、 providing a partner with information regarding customer acceptance of a new solution
    • B、 providing information regarding current network infrastructure readiness
    • C、 using stakeholder interviews to identify stakeholders and decision-makers high-level solutionrequirements timelines and the scope of an opportunity
    • D、 adjusting a solution to account for a customer’s physical site characteristics

    正确答案:C

  • 第3题:

    A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()

    • A、0
    • B、1
    • C、2
    • D、4

    正确答案:A

  • 第4题:

    What are the three partner benefits of service contracts?()

    • A、renews automatically for the lifetime of the product
    • B、eliminates network problems
    • C、generate recurring revenue
    • D、helps customers speed architectural planning and design
    • E、produces higher margins than product sales along
    • F、strengthens customer loyalty

    正确答案:C,E,F

  • 第5题:

    A customer is planning a combined solution of a 2 node SVC and DS8700 with 128x300 GB FC disks. During the TDA the reviewer compares the machine configuration with the customer’s expectations.  Which of the following customer requirements must be considered()

    • A、the number of SAN ports required by the solution
    • B、thin provisioning is mandatory
    • C、the solution needs to support RAID 0
    • D、the solution needs to be supported by the VMware Site Recovery Manager

    正确答案:A

  • 第6题:

    A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()

    • A、Two dual-port PCIe adapters
    • B、A four-port PCIe Ethernet adapter
    • C、Four separate PCIe Ethernet adapters
    • D、Two embedded Integrated Virtual Ethernet adapters (IVE)

    正确答案:C

  • 第7题:

    The customer is planning a new IBM System Storage DS5020 using iSCSI and direct attachedfibre channel connectivity in a redundant configuration. The customer is planning to set up adisaster recovery solution in the near future by using Enhanced Remote Mirroring. Which of thefollowing considerations are critical for this customer?()

    • A、customer must reconfigure aniSCSI port for mirroring
    • B、customer must set up a fabric and dedicate port 4 for disaster recovery
    • C、customer must set up a fabric and dedicate port 2 for disaster recovery
    • D、replication is not possible with the DS5020, they must consider the DS5300

    正确答案:C

  • 第8题:

    A customer is planning on establishing a Global Mirror between two Storwize V7000 storagearrays. The customer is planning to lease an IP WAN connection between sites for the tasks andis running a SAP (database) application on Oracle. Which of the following planning considerationsis most important?()

    • A、the distance between sites needs to be less than 100 kilometers
    • B、consistency groups should be created to maintain write order on the remote mirror
    • C、ensure sufficient bandwidth exists on the link based on average application workloads
    • D、ensuring a low round trip latency of less than 30ms on the WAN connection is required

    正确答案:B

  • 第9题:

    单选题
    The customer is planning a new IBM System Storage DS5020 using iSCSI and direct attachedfibre channel connectivity in a redundant configuration. The customer is planning to set up adisaster recovery solution in the near future by using Enhanced Remote Mirroring. Which of thefollowing considerations are critical for this customer?()
    A

    customer must reconfigure aniSCSI port for mirroring

    B

    customer must set up a fabric and dedicate port 4 for disaster recovery

    C

    customer must set up a fabric and dedicate port 2 for disaster recovery

    D

    replication is not possible with the DS5020, they must consider the DS5300


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    A customer has two separate storage islands and is planning to implement an SVC to provide forFlashCopy between the two islands. What is the minimum number of inter-switch links (ISLs) thatare required?()
    A

    0

    B

    1

    C

    2

    D

    4


    正确答案: B
    解析: 暂无解析

  • 第11题:

    多选题
    What are the three partner benefits of service contracts?()
    A

    produces higher margins than product sales along

    B

    generate recurring revenue

    C

    strengthens customer loyalty

    D

    renews automatically for the lifetime of the product

    E

    helps customers speed architectural planning and design

    F

    eliminates network problems


    正确答案: B,C
    解析: 暂无解析

  • 第12题:

    Where should known problem areas in the site survey be documented?()

    • A、nowhere (but should be discussed with the customer)
    • B、on the site survey map and within the site survey text
    • C、on the customers blueprints
    • D、in the Cisco WCS Planning Tool

    正确答案:B

  • 第13题:

    A customer has ordered a rack, a p650, two p630s, and two p615s.  During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit.  However, the specialist knows that the p650 will be racked, but the other systems will arrive separately.  In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()

    • A、Because additional systems would require more power receptacles
    • B、Because the customer may need to do additional facilities planning
    • C、Because the customer needs additional funding to cover the services
    • D、Because postponing the eventual discussion will likely lead to customer dissatisfaction

    正确答案:D

  • 第14题:

    A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()

    • A、operator training
    • B、cache size of the two clusters
    • C、fibre bandwidth capability between the sites
    • D、number of stacked tape drives attached to each cluster

    正确答案:C

  • 第15题:

    An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN   that is now configured with an EMC Symmetrix subsystem disk.  The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()

    • A、IBM System Storage DS8000: Host Systems Attachment Guide
    • B、DS8000 Interoperability Matrix
    • C、IBM System Storage DS8000: Introduction and Planning Guide
    • D、IBM System Storage Solution Handbook

    正确答案:B

  • 第16题:

    A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()

    • A、ITSO Redbooks
    • B、Facts and Features
    • C、System Planning Tool
    • D、Fix Level Recommendation Tool

    正确答案:D

  • 第17题:

    Which of the following people does IBM recommend be involved with a Pre-Sales Solutions Assurance Review?()

    • A、The customer executive who is funding the project
    • B、IBM Global Financing when they are financing the purchase
    • C、Subject matter experts representing each component of the solution
    • D、Hardware installation planning representative responsible for the installation

    正确答案:C

  • 第18题:

    A customer is getting ready to install a new pSeries system into their data center.  They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance.  What reference material should the pSeries technical specialist provide to the customer?()

    • A、Sales Manual
    • B、Announcement Letter
    • C、Site and Hardware Planning Information
    • D、Adapter, Devices, and Cable Information for Multiple Bus Systems

    正确答案:C

  • 第19题:

    A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system.  How might the pSeries technical specialist aid the customer in addressing their concern?()

    • A、Direct the customer to the Installation Guide for each system to identify the power requirements.
    • B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
    • C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
    • D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.

    正确答案:C

  • 第20题:

    单选题
    Which of the following people does IBM recommend be involved with a Pre-Sales Solutions Assurance Review?()
    A

    The customer executive who is funding the project

    B

    IBM Global Financing when they are financing the purchase

    C

    Subject matter experts representing each component of the solution

    D

    Hardware installation planning representative responsible for the installation


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase.()
    A

     providing a partner with information regarding customer acceptance of a new solution

    B

     providing information regarding current network infrastructure readiness

    C

     using stakeholder interviews to identify stakeholders and decision-makers high-level solutionrequirements timelines and the scope of an opportunity

    D

     adjusting a solution to account for a customer’s physical site characteristics


    正确答案: D
    解析: 暂无解析