A customer is installing an HMC-managed Power 720 with two partitions, one for Production the other for Testing. They plan to use the Testing partition only occasionally and want to minimize hardware. Which of the following meets these requirements?()
第1题:
A storage specialist is discussing the customer’s high availability plan and discovers that they areonly 80 kilometers (50 miles) from the intended site. They require 7 x 24 x 365 data availability in aUNIX environment with an RPO of two minutes. They have two DS5300 systems located at bothsites. Which of the following IBM storage functions best meets the customer’s businesscontinuance requirements?()
第2题:
A small IT department is deploying Power 720 servers exploiting virtualization technologies. Each Power 720 will have two partitions, one with 6 cores and one with 2 cores, and both partitions having 32GB of memory each. Live Partition Mobility is being considered at some point in the future. What is the minimum AIX Edition required to support the customer?()
第3题:
A database administrator wants to design a multi-partition database that can take advantage of both intra-partition parallelism and inter-partition parallelism. Which configuration will allow the use of these types of parallelism while using the least number of hardware components (servers, processors)? ()
第4题:
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()
第5题:
Which of the following explains the relationship between a physical and logical partition?()
第6题:
A customer has a new Power 720 with PowerVM Standard Edition. They plan to migrate their single-partition POWER5 550 to the new Power 720. How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()
第7题:
A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in thefollowing configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host1 hosted IBM i partition; 2 hosted Linux partitions. Which configuration will provide boot disk capability to all partitions?()
第8题:
Company.com is having trouble installing a fresh AIX image onto a newly defined partition on a p5-520. The assignment of the adapters to the each of the partitions is as follows: Fibre Channel Card 01 - partition one - required Fibre Channel Card 02 - partition one - required SCSI adapter 01 - partition one - desired IDE adapter 01 - partition one - required Ethernet adapter 01 - partition one - required Ethernet adapter 01 - partition two - required SCSI adapter 02 - partition two - required IDE adapter 01 - partition two - desired Which of the following actions will enable the installation of the AIX image?()
第9题:
Two dual-port PCIe adapters
A four-port PCIe Ethernet adapter
Four separate PCIe Ethernet adapters
Two embedded Integrated Virtual Ethernet adapters (IVE)
第10题:
The Blades must use the same CIOv and CFFh expansion adapter types.
Two physical BladeCenter H chassis will be required. One for the POWER Blades, the other for the x86 Blades.
The x86 Blades and POWER Blades may use different expansion adapters provided the POWER Blades are in bays 1-7 and the x86 Blades are in slots 8-14.
The x86 Blades and POWER Blades may use different expansion adapters, provided the corresponding I/O modules to Blade midplane connections are configured in the Advanced Management Module (AMM).
第11题:
It installs, configures, and verifies monitoring tools and processes in accordance with the operations implementation.
It verifies that the Cisco Unified Communications solutions is ready for production.
It verifies that the Cisco Unified Communications solution meets their business and technical requirements.
It executes and verifies the migration plan by migrating network services from an existing state to a future state.
It provides automated tools for measuring system performance under load.
第12题:
Create a system profile for each partition. Assign all needed resources as 'required'.
Define all system resources as 'desired' on the Testing partition. Activate only as needed.
Create two shared processor pools. Assign the minimal I/O resources required for each partition to the shared pools.
Create both partitions with minimal 'required' resources, and optional resources as 'desired'. Activate each partition as necessary.
第13题:
A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?()
第14题:
A customer has two Power 770 systems with 4 enclosures each. Thirty two cores and 1TB of memory are activated on each system. Each system has 3 database partitions and each partition has 10 cores and 300GB of memory. Which solution will provide automated recovery of unplanned outages at least cost?()
第15题:
Companycom is planning to do server consolidation on POWER5. The customer has a test environment, a QA environment and a production environment for two applications. Both the test and QA environments are very small and are only utilized when new releases are being developed and tested. They require less than 1 CPU each. Both production applications require 2 CPUs for day-to-day operation and can require up to an additional 2 CPUs each during abrupt peak requirements. What is the best design for the LPARs?()
第16题:
A system is being planned with three production partitions, one each for an IBM i, AIX standard edition, and Power Linux applications. One fibre-channel attached TS3100 tape library will be shared between the partitions for backup. Which solution provides tape library sharing with minimum operator intervention?()
第17题:
Company.com has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the total workload between the partitions does NOT exceed the capacity of the server. However, the partitions are not able to utilize the full capacity of the system during peak times, because the necessary CPU and memory resources are not always allocated to the busiest partition. Which of the following options would best balance these resources?()
第18题:
A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention. Which of the following meets the customer requirement?()
第19题:
A company plans to deploy a two-enclosure, 23-core Power 780 system with AIX, IBM i and Linux in the following configuration: 3 AIX partitions with dedicated network and disk adapters; 1 native IBM i partition acting as a host; 1 hosted IBM i partition; 2 hosted Linux partitions. Which configuration will provide boot disk capability to all partitions?()
第20题:
You are planning to deploy Windows 7 Enterprise to all of your company’s client computers. You have the following requirements: Create two custom partitions on each client computer’s hard disk, one for the operating system and the other for data. Automatically create the partitions during Windows Setup. You need to design an image that meets the requirements. What should you do?()
第21题:
one server having at least two processors
two servers having one processor and one logical database partition
one server having four processors and two logical database partitions
two servers each having four processors and two logical database partitions
第22题:
Use Windows PE to create the partitions. Install Windows 7 on the first partition.
Use Windows System Image Manager (Windows SIM) to specify the partition configuration.
Use Disk Management to create the two partitions on the hard disk.
Use SysPrep to create the two partitions during Windows Setup.
第23题:
Perform Live Partition Mobility between the two systems.
Move the boot disks from the old system to the new system.
Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.
Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.