Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()
第1题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第2题:
A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()
第3题:
Which of the following functions can be performed using the Integrated Virtualization Manager?()
第4题:
Which of the following can be used to re-deploy a system configuration in a disaster recovery scenario?()
第5题:
Which of the following interfaces is required to implement Workload Partition Mobility? ()
第6题:
Company.com would like to have the processor resources on their system efficiently shared between logical partitions, but does not require management of memory or I/O resources. Which of the following would accomplish this requirement?()
第7题:
A service fails to start. Which of the following places can a technician go to find the services console?()
第8题:
The Hardware Management Console (HMC) and Integrated Virtualization Manager (IVM).
The Hardware Management Console (HMC) and Advanced System Manager Interface (ASMI).
Integrated Virtualization Manager (IVM) and Advanced System Manager Interface (ASMI).
Integrated Virtualization Manager (IVM) and BladeCenter Advanced Management Module (AMM).
第9题:
The systems must use internal storage for boot purposes.
All virtualized ethernet adapters must be numbered below 10.
The mobile partition's network and disk access must be virtualized.
Each system must be controlled by a different Hardware Management Console (HMC).
第10题:
The systems must use internal storage for boot purposes.
All virtualized Ethernet adapters must be numbered below 10.
The mobile partition’s network and disk access must be virtualized.
Each system must be controlled by a different Hardware Management Console (HMC).
第11题:
lssysres -r cpu -m 9117-MMA*6512345 -r sys
lssyscfg -r proc -m 9117-MMA*6512345 -r sys
lshwres -r proc -m 9117-MMA*6512345 --level sys
lshwcfg -r proc -m 9117-MMA*6512345 --level sys
第12题:
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
第13题:
An administrator wants to query the CPU resources of the managed system 9117-MMA*6512345 from the Hardware Management Console (HMC) command line. Which of the following HMC commands could achieve this?()
第14题:
Prior to implementing an LPAR system, which of the following needs to be done?()
第15题:
Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems?()
第16题:
Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()
第17题:
Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()
第18题:
Which IBM System Director task will give you the ability to update firmware and device drivers on System x servers?()
第19题:
A graphics monitor must be attached to the server
Cluster System Management (CSM) software must be installed
The LPAR system must have an Hardware Management Console (HMC) connected
Each LPAR must be configured with a CDROM for operating system installation
第20题:
Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line.
The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed.
If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run.
The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot.
第21题:
Workload Partitions Manager for AIX
Hardware Management Console (HMC) GUI
Integrated Virtualization Manager (IVM)
Advanced System Management Interface (ASMI)
第22题:
It has a GUI interface for upgrading system firmware.
It creates and manages AIX/Linux and VIOS type LPARs.
It can be managed by the Hardware Management Console (HMC).
It supports Live Partition Mobility on POWER6 systems and above.
第23题:
IBM eConfig
IBM Performance Monitor
IBM Workload Estimator (WLE)
IBM System Planning Tool (SPT)