参考答案和解析
正确答案:正确
更多“SYS-026 system normal power up在历史报警列表中显示的是蓝色。”相关问题
  • 第1题:

    Under normal operating conditions,the rudder is hydraulically locked unless ______.

    A.The manual trick wheel is engaged for steering

    B.The variable stroke pump is off stroke

    C.A rudder order is given by the control system

    D.An electric power system failure occurs at the steering gear


    正确答案:C

  • 第2题:

    WARN报警在历史报警列表中现实的是白色。


    正确答案:正确

  • 第3题:

    ()历史报警列表中的任意报警,可以显示出该报警的重复产生/消失明细情况。

    • A、双击
    • B、单击
    • C、左键
    • D、右键

    正确答案:A

  • 第4题:

    一号线ATS历史报警记录以时间顺序逆向动态显示当日及前一周的所有报警,产生新的报警时,显示在列表的最上方。


    正确答案:正确

  • 第5题:

    Which of the following access levels allows a user to perform normal day to day work with their own files but does not allow them to change system files or computer performance?()

    • A、Administrator
    • B、User
    • C、Guest
    • D、Power user

    正确答案:B

  • 第6题:

    A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()

    • A、Perform Live Partition Mobility between the two systems.
    • B、Move the boot disks from the old system to the new system.
    • C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.
    • D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

    正确答案:D

  • 第7题:

    Which system provides redundant system clocks?()

    • A、Power 595
    • B、Power 560
    • C、Power 570
    • D、Power 550

    正确答案:A

  • 第8题:

    可以引起飞机某些部件活动的是什么测试?()

    • A、POWER-UP TEST
    • B、CYCLIC TEST
    • C、SYSTEM TEST
    • D、SPECIFIC TEST

    正确答案:D

  • 第9题:

    如果FMC上电(POWER UP TEST)测试失效,CDU如何显示().

    • A、显示“FMCFAIL”
    • B、显示空白
    • C、显示ACARS和ACMS提示符
    • D、显示“FMC”

    正确答案:C

  • 第10题:

    单选题
    ()conveys a signal of desired rudder angle from the bridge and activates the power unit and transmission system unit the desired angle is reached.
    A

    The control equipment

    B

    The power unit

    C

    The transmission system

    D

    The follow-up mechanism


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    K-Chief 500系统的操作界面出现“ALARM SUMMARY”时,其表示的意思是()。
    A

    历史报警

    B

    分组报警

    C

    显示当前报警的汇总列表

    D

    显示以前发生的警报


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    ()历史报警列表中的任意报警,可以显示出该报警的重复产生/消失明细情况。
    A

    双击

    B

    单击

    C

    左键

    D

    右键


    正确答案: C
    解析: 暂无解析

  • 第13题:

    RESET在历史报警列表中显示的是蓝色。


    正确答案:正确

  • 第14题:

    An AIX server will not boot in normal mode and the server must be booted into maintenance  mode to rebuild the boot logical volume. A NIM master is not defined in this environment.  How is the system booted into maintenance mode to perform this task ()

    • A、Apply power and when the SMS menus appear press 5 repeatedly to enter a maintenance boot automatically. The system will present a maintenance shell eventually.
    • B、Boot media such as CDROM or Tape is required to boot into maintenance mode. When inserted into the proper device the system automatically boots into maintenance mode when it can not boot into normal mode.
    • C、Apply power and the server automatically boots into maintenance mode where you can select your disk to rebuild the boot logical volume.
    • D、Boot media such as CDROM or Tape is required and an administrator must select the proper SMS menus to get into maintenance mode.

    正确答案:D

  • 第15题:

    在CRT/MDI面板的功能键中,用于报警显示的键是()。

    • A、ALARM
    • B、DGNOS
    • C、PARAM
    • D、SYSTEM

    正确答案:A

  • 第16题:

    在Internet Explorer中,“历史”按钮指的是显示最近访问过的站点列表。


    正确答案:正确

  • 第17题:

    Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()

    • A、Physically press the appropriate button on the system.
    • B、Physically disconnect and reconnect the power cable on the system.
    • C、Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.
    • D、Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

    正确答案:A

  • 第18题:

    A system was running properly until a reboot. Following the reboot, the system LED displayed cycles between 0223 and 0229. Which of the following procedures should be performed next?()

    • A、Power down then power up the system
    • B、Boot into diagnostic mode and run fsck
    • C、Boot from installation media and run bosboot
    • D、Boot into maintenance mode and check the bootlist

    正确答案:D

  • 第19题:

    A/T的Power和Normal键功能是()。

    • A、Power指增加发动机动力
    • B、Normar指增加发动机动力
    • C、Power更省油
    • D、Normal更省油

    正确答案:D

  • 第20题:

    测试功能分为哪几类()

    • A、POWER UP TEST,CYCLIC TEST两类
    • B、POWER UP TEST,CYCLIC TEST,SPECIFIC TEST三类
    • C、POWER UP TEST,CYCLIC TEST,SYSTEM TEST,SPECIFIC TEST四类

    正确答案:C

  • 第21题:

    飞控系统在什么状态下进行POWER-UP BIT?()

    • A、任何时候都可以
    • B、只有当飞机接通AC时,系统才开始POWER-UP BIT
    • C、系统不必进行POWER-UP BIT
    • D、接通地面勤务电源时

    正确答案:B

  • 第22题:

    判断题
    一号线ATS历史报警记录以时间顺序逆向动态显示当日及前一周的所有报警,产生新的报警时,显示在列表的最上方。
    A

    B


    正确答案:
    解析: 暂无解析

  • 第23题:

    单选题
    Adjustments to the compensating needle valve in a hydraulic governor should be made with the engine at ()
    A

    maximum power at a normal load

    B

    maximum power and load under normal conditions

    C

    half speed and normal temperature

    D

    normal operating temperature without a load


    正确答案: C
    解析: 暂无解析