以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4)No.3 hold tweendeck, fumigation of ship's holds, leave ventilation duct 30 centimeters and lay wood block on it; 5)lay

题目

以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4)No.3 hold tweendeck, fumigation of ship's holds, leave ventilation duct 30 centimeters and lay wood block on it; 5)lay two tiers wood block and one tier mat on China wood oil 、 bauxite 、 sausage skin 、 flint clay

  • A、1)严格按配载计划要求执行;2)申请理货;
  • B、3)吊杆安全负荷量3t;4)No.3舱二层舱烤烟留通风道30厘米,上铺木板;
  • C、5)桐油、铝矾土、肠衣、焦宝石上铺二层木板,一层席子。
  • D、以上都对

相似考题
参考答案和解析
正确答案:D
更多“以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4)No.3 hold tweendeck, fumigation of ship's holds, leave ventilation duct 30 centimeters and lay wood block on it; 5)lay ”相关问题
  • 第1题:

    On a vessel proceeding from a very cold to a warm climate with a cargo of a nonhygroscopic nature in the holds,which is TRUE ________.

    A.Danger of heavy ship sweat exists;constant and vigorous ventilation is required

    B.There is danger of heavy cargo sweat if outside air is introduced by ventilation

    C.There is little danger of ship's sweat,slight possibility of cargo sweat;moderate ventilation is needed

    D.The possibility of any sweat problem,either cargo or ship,is remote


    正确答案:B

  • 第2题:

    In relation to cargo gear, what does SWL mean ?______.

    A.Safe working load

    B.Ship’s working lift

    C.Starboard wing lift

    D.Stress, weight, load


    正确答案:A
    关于货物设备,SWL是什么意思?安全工作负荷

  • 第3题:

    The safe working load of the derrick is 5 tons.()

    • A、吊杆的安全工作负荷量是5吨
    • B、龙门吊的安全工作负荷量是5吨
    • C、起货机的安全工作负荷量是5吨
    • D、重吊杆的安全工作负荷量是5吨

    正确答案:A

  • 第4题:

    以下为可加批注的有()。

    • A、Deck cargo at shipper’s risk.
    • B、Not tallied by ship’s crew.
    • C、1000 packages tallied by ship’s crew.990 packages tallied by tallyman.
    • D、Tally said to be.

    正确答案:A,B

  • 第5题:

    英文备注“Implement the requirement of Stowage plan strictly”的中文意思是:()

    • A、 严格按配载计划要求执行
    • B、 请进行相应的积载工作
    • C、 请根据要求制作积载计
    • D、 积载计划的要求已经确定

    正确答案:A

  • 第6题:

    英文备注“the derrick safe working load 3t”的中文意思是:()

    • A、吊杆的重量为3t
    • B、吊杆吊起的重量是3t
    • C、吊杆工作时不能吊起3t的货物
    • D、吊杆安全负荷量3t

    正确答案:D

  • 第7题:

    VPN按照业务用途分可以分为哪几类?()

    • A、AccessVPN
    • B、IntranetVPN
    • C、ExtranetVPN
    • D、Lay2和Lay3隧道VPN

    正确答案:A,B,C

  • 第8题:

    “SWL” means ().

    • A、safe working load
    • B、safe work load
    • C、safe worked load
    • D、safely working load

    正确答案:A

  • 第9题:

    A customer has a requirement for a storage solution that meets the following criteria:       (1)Heterogeneous hosts attached       (2)Support for block I/O       (3)High Speed       (4)Scalable  Which solution would satisfy the customer’s requirement?()

    • A、SAN
    • B、NAS
    • C、SCSI
    • D、iSCSI

    正确答案:A

  • 第10题:

    单选题
    The well preparation of stowage plan will().
    A

    increase the ship's officers' knowledge

    B

    extend the ship's officers' knowledge

    C

    improve the ship's cargo-handling equipment

    D

    raise the working efficiency


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    An advantage of nylon rope over manila is that nylon rope().
    A

    can be used in conjunction with wire or spring-lay rope

    B

    can be stored on decks exposed to sunlight

    C

    can hold a load even when a considerable amount of the yarns have been abraded

    D

    gives audible warning of overstress whereas manila does not


    正确答案: A
    解析: 暂无解析

  • 第12题:

    判断题
    STOWAGE PLAN.积载计划图 ;FIRE CONTROL PLAN防火控制图。
    A

    B


    正确答案:
    解析: 暂无解析

  • 第13题:

    ______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.

    A.Alternate hold loading condition

    B.Block hold loading condition

    C.Part hold loading condition

    D.Homogeneous hold loading condition


    正确答案:B

  • 第14题:

    以下为某散矿船配载图的英文备注,对其识读正确的是() 1)Implement the requirement of Stowage plan strictly; 2)Two round Loading; 3)First round 1000t each hold, separation loading; 4) second round 8000t each hold, separation loading; 5)load evenly as far as possible in the vicinity of hatchway; 6) During loading , care about list and heeling angle do not exceed 3; 7) After loading 800t (flexible weight), please pay attention to satisfy the requirement of draft difference in trim 0.5~ 1.0m .

    • A、1)严格按配载计划要求执行;2)分两轮隔舱装;
    • B、3)第一轮每舱1000t,隔舱装载;4)第二轮每舱8000t,隔舱装载;5)在舱口范围内尽量装平;
    • C、6)装货过程中注意左右均横,横倾角不超过3°;7)装载最后800t(机动重量)时,请注意满足尾倾0.5~1.0m的吃水差要求。
    • D、以上都对

    正确答案:D

  • 第15题:

    一套完整的集装箱积载图由三个部分组成,即()。

    • A、BAY PLAN、DAILY REPORT、GENERAL STOWAGE PLAN
    • B、BAY PLAN、SUMMARY LIST、GENERAL STOWAGE PLAN
    • C、BLANK PLAN、SUMMARY LIST、GENERAL STOWAGE PLAN

    正确答案:B

  • 第16题:

    以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4) No.1 hold bilge, lay wood block; 5) No.1 hold bilge ,lay wood block on tungsten iron and pave canvas on wood block; 6)No.4 hold tweendeck,using rope net separate commodity from stationary.

    • A、1)严格按配载计划要求执行;2)申请理货;
    • B、3)吊杆安全负荷量3t;4)No.1舱底舱铺木板;
    • C、5)No.2舱底舱钨铁上铺木板,上面再铺帆布;6)No.4舱二层舱日用品和文具间用绳网隔票。
    • D、以上都对

    正确答案:D

  • 第17题:

    以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4)No.3 hold tweendeck, fumigation of ship's holds, leave ventilation duct 30 centimeters and lay wood block on it; 5)lay two tiers wood block and one tier mat on China wood oil 、 bauxite 、 sausage skin 、 flint clay

    • A、1)严格按配载计划要求执行;2)申请理货;
    • B、3)吊杆安全负荷量3t;4)No.3舱二层舱烤烟留通风道30厘米,上铺木板;
    • C、5)桐油、铝矾土、肠衣、焦宝石上铺二层木板,一层席子。
    • D、以上都对

    正确答案:D

  • 第18题:

    At which lay er of the OSI model does the Spanning Tree Protocol (STP) operate at()

    • A、Lay er 5
    • B、Lay er 4
    • C、Lay er 3
    • D、Lay er 2
    • E、Lay er 1

    正确答案:D

  • 第19题:

    The safe working load of the derrick is ().

    • A、5 tons
    • B、5 metres
    • C、5 feet
    • D、5 years

    正确答案:A

  • 第20题:

    STOWAGE PLAN.积载计划图 ;FIRE CONTROL PLAN防火控制图。


    正确答案:正确

  • 第21题:

    单选题
    The safe working load of the derrick is ().
    A

    5 tons

    B

    5 metres

    C

    5 feet

    D

    5 mile


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    On a vessel proceeding from a very cold to a warm climate with a cargo of a nonhygroscopic nature in the holds,which is TRUE?().
    A

    Danger of heavy ship sweat exists; constant and vigorous ventilation is required

    B

    There is danger of heavy cargo sweat if outside air is introduced by ventilation

    C

    There is little danger of ship's sweat,slight possibility of cargo sweat; moderate ventilation is needed

    D

    The possibility of any sweat problem,either cargo or ship,is remote


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    An advantage of nylon rope over manila rope is that nylon rope().
    A

    can hold a load even when a considerable number of the yarns have been abraded

    B

    can be stored on deck,exposed to sunlight

    C

    can be used in conjunction with wire or spring-lay rope

    D

    gives audible warning of overstress whereas manila does not


    正确答案: D
    解析: 暂无解析

  • 第24题:

    单选题
    It’s()to stow optional cargo in the lower hold.You’d better give it block stowage in the tweendecks,then it can be easily discharged either at Shanghai,or Dalian or Tianjin.
    A

    possible

    B

    impossible

    C

    proper

    D

    improper


    正确答案: B
    解析: 暂无解析