expect
expects
expecting
to expect
第1题:
A. expect
B. expected
C. was expecting
D. will expect
第2题:
In accordance with Sinotime,the Charterers will not be responsible for __________.
A.the expenses of all dock,harbour and tonnage dues at the ports of delivery and re-delivery unless incurred before delivery or after re-delivery
B.expenses of agencies and commissions
C.charges including any foreign general municipality or state taxes
D.expenses for all ropes,falls,slings and blocks actually used for loading and discharging
第3题:
In determining a safe speed, the Rules list all of the following as factors which must be taken into account EXPECT the ______.
A.limitations of radar equipment
B.presence of background lights at night
C.maximum horsepower of your vessel
D.maneuverability of your vessel
第4题:
We came finally()the conclusion that she has been telling lies all the time.
第5题:
为了避免震动,用低速控制钮减低移动舱盖的速度。()
第6题:
To avoid shock, reduce the speed of moving hatch cover by inching control.
To avoid shock, reduce the speed of moving hatch cover by control levers.
To avoid shock, reduce the position of moving hatch cover by inching control.
To avoid shock, reduce the course of moving hatch cover by control levers.
第7题:
第8题:
of
for
to
at
第9题:
the information
the formation
the scatter
the friction
第10题:
more;more
more;less
less;more
less;less
第11题:
lubricated
fabricated
embedded
dictated
第12题:
expect
expects
expecting
to expect
第13题:
A) would expect
B) expects
C) expect
D) expected
第14题:
A hurricane moving northeast out of the Gulf passes west of your position. You could expect all of the following EXPECT ______.
A.higher than normal swells
B.high winds
C.winds veering from south, through west, to northwest
D.light showers
第15题:
第16题:
翻译:Neither the consignee nor the holder of the bill of lading shall be liable for the demurragedead freight and all other expenses in respect of loading occurred at the loading port unless the bill of lading clearly states that the aforesaid demurragedead freight and all other expenses shall be borne by the consignee and the holder of the bill of lading。
第17题:
A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()
第18题:
Verification of the expected performance of the new solution.
A document used by IBM manufacturing to build and ship the system solution.
An IBM Quality Assurance Certificate which is supplied to the customer with the system.
A list of actions that are recommended to reduce risk and create a successful implementation.
第19题:
moving is much more troublesome than remodeling
remodeling is much more economical than moving
whether remodeling is better than moving depends on different situations
the issue of whether remodeling is better than moving is determined by financial factors
第20题:
the date of declaration
date of Notice of Readiness
the canceling date
the date of delivery
第21题:
higher than normal swells
high winds
winds veering from south,through west,to northwest
light showers
第22题:
the carrier
the consignee
the merchant
the owner
第23题:
To be accounted for the Charterers
To be paid for the Charterers
To be handled for the Charterers
To be paid by the Charterers
第24题: