所有的货物钢丝绳必须调整好。
所有的货物钢丝绳必须修理好。
所有的货物钢丝绳必须上油。
所有的货物钢丝绳必须清洁好。
第1题:
The master of a ship must ______ all reasonable care of the cargo,both during the ordinary course of the voyage and where some accident has exposed the cargo to danger.
A.Make
B.Take
C.Give
D.Have
第2题:
Oceangoing dry bulk cargo vessels over 1000 GT must have approved combination-type fire nozzles at all ______.
A.Fire stations aboard the vessel,except for those in open deck areas weatherdeck and cargo hold fire stations
B.Interior fire stations
C.Engine room fire stations
D.All of the above
第3题:
Your tow includes a barge carrying chlorine.Which special requirements must be observed ________.
A.The wing voids shall not be opened when underway
B.You must post a deckhand to keep a special watch on this barge
C.A cargo information card for chlorine must be in the pilothouse
D.All of the above
第4题:
Which statement is TRUE concerning cargo hose on tank barges ________.
A.Cargo hose must be able to withstand the shut-off head plus the static head of the cargo pump
B.Cargo hose must be able to withstand the static head of the cargo pump but no less than 100 psi
C.Cargo hose must be able to withstand the shut-off head less the static head of the cargo pump but no less than 100 psi
D.Cargo hose must be able to withstand at least 150 psi
第5题:
All wire rope used in shipboard cargo gear must be identified and described in a certificate. The certificate shall certify all of the following EXCEPT the ______.
A.date of the test
B.load at which a test sample broke
C.name of the vessel
D.number of strands and of wires in each strand
第6题:
This cargo wires has more than ten percent () wires.
第7题:
All cargo wires need to be ().
第8题:
()has more than ten percent broken wires. Stop using it at once.
第9题:
fire stations aboard the vessel,except for those in open deck areas weatherdeck and cargo hold fire stations
interior fire stations
engine room fire stations
all of the above
第10题:
washed
greased
cleaned
scraped
第11题:
The cargo runner
The cargo block
The derrick sling
The lashing wire
第12题:
These lashing tools must be tightened again.
These lashing wires must be tightened again.
These lashing bars must be secured again.
These cargo wires must be loosened again.
第13题:
All deck cargo must be ______ in addition to being shored,blocked,and braced.
A.lashed
B.carefully prestowed
C.nested
D.properly supervised
第14题:
By regulation,cargo tank atmosphere must be inert before and during which operation ________.
A.Stripping
B.Loading
C.Cleaning
D.All of the above
第15题:
To allow for the rise or fall in tide and for change in draft of a tanker during cargo transfer,cargo hoses must be suspended with ______.
A.Slings or saddles placed at 25-foot(8 meter)intervals
B.Enough slack in their bight
C.Topping lifts and runners tied off to winches
D.All of the above
第16题:
Your tanker is carrying a cargo of styrene.Which of the following is NOT a requirement for carriage of this cargo ________.
A.P/V valves with galvanized parts must be replaced
B.Authorization to carry styrene must be endorsed on the Certificate of Inspection
C.You must have a Certificate of Inhibition provided by the shipper
D.The cargo tank heating coils must be blanked off
第17题:
All the cargo wires must be adjusted well.()
第18题:
这些绑扎工具必须要再次上紧。()
第19题:
湿货要远离干货。()
第20题:
All the cargo wires must be greased ().
第21题:
derrick, winches, cargo ropes and wires
derricks, windlass, capstan
hatch covers, derricks, windlass
cranes, hatches, lashing wires
第22题:
such/that
so/that
such/to
so/as to
第23题:
date of the test
load at which a test sample broke
name of the vessel
number of strands and of wires in each strand