business is developing
business is bad
strolling is slow
people are slow in learning
第1题:
---Dead slow ahead! ----Dead slow ahead! _______________
A.Engine dead slow ahead!
B.Engine dead ahead slow!
C.Engine slow dead ahead!
D.I do it right now
第2题:
---Slow ahead both engines! ---Slow ahead both engines! ___________________!
A.Both engines slow ahead
B.Engine slow ahead port
C.Engine slow ahead starboard
D.Engine both ahead
第3题:
---How many revolutions? ---________________.
A.Slow ahead
B.Eighty
C.Thirty minutes
D.Slow
第4题:
微速后退。
A.Dead slow astern.
B.Slow astern.
C.Half astern.
D.Slow ahead
第5题:
---How many revolutions? ---().
第6题:
---Dead slow ahead! ---Reply: (). ---Report: Engine dead slow ahead.
第7题:
A hypervisor has 4GB of RAM, 1TB of RAID 5 SATA storage,two Xeon 2.4GHz Quad CoreProcessors,and four gigabit NIC cards.The hypervisor is running twelve guest operating systems and users are reporting slow response times.Which of the following is MOST likely the cause?()
第8题:
You are designing a strategy to install the new scheduling application. Which two actions should you perform?()
第9题:
“Slow ahead”
“Dead slow ahead”
“Astern”
“Dead slow astern”
第10题:
Dead slow astern
Engine slow astern
Engine half astern
Ready
第11题:
Double the number of processors.
Double the number of memory DIMMs.
Double the number of network adapters.
Double the number of SCSI buses and disks.
第12题:
第13题:
---Slow ahead! ---Slow ahead! _______________!
A.Engine ahead slow!
B.Engine slow ahead!
C.Ahead engine slow!
D.Yes, sir
第14题:
---_______________! ---Engine dead slow astern!
A.Dead slow astern
B.Engine slow astern
C.Engine half astern
D.Ready
第15题:
The pilot needs the ship to go forward very slowly. The order should be _____.
A.“Slow ahead”
B.“Dead slow ahead”
C.“Astern”
D.“Dead slow astern”
第16题:
---Dead slow ahead! ----Dead slow ahead! ()
第17题:
The pilot needs the ship to go forward very slowly. The order should be ().
第18题:
Which of the following is MOST likely to occur if the temperature in the server room is cooled too quickly after a power outage?()
第19题:
Your company has offices in Toronto and Chicago. Both offices belong to an Active Directory directory service site named Site1. There is only one domain controller in Site1. Users in the Chicago office are experiencing slow logon times. You create a new Active Directory site for the Chicago office named Site2. You promote a new domain controller and create a site link between Site1 and Site2. You need to improve logon times for the Chicago users and enable Active Directory replication between the Site1 and Site2 domain controllers. Which two actions should you perform?()
第20题:
No problem
OK
Dead slow ahead
Yes
第21题:
Engine ahead slow!
Engine slow ahead!
Ahead engine slow!
Yes, sir
第22题:
Both engines slow ahead
Engine slow ahead port
Engine slow ahead starboard
Engine both ahead
第23题:
forward spring line and going slow ahead on the inboard engine
after spring line and going slow astern on the outboard engine
forward spring line and going slow ahead on both engines
forward spring line and going slow ahead on the outboard engine