has to be
must be
should be
ought to be
第1题:
A、should have been
B、ought to have been
C、must have been
D、can not have been
第2题:
A、must have worked
B、ought to have worked
C、would have worked
D、has worked
第3题:
It ______ last night, for the ground is wet.
A、must rain
B、must be going to rain
C、must have rained
D、ought to rain
第4题:
She advised that I _______ in bed for a few days.
A、rested
B、should rest
C、must rest
D、ought to rest
第5题:
Being a good leader,one ______ to think more of others. A. must B. may C. ought D. should
第6题:
第7题:
A company has just implemented a disaster recovery plan in which critical business must be restored in a four hour window. Which of the following methods should be used to backup theservers?()
第8题:
Specify that each server must have one instance for each customer.
Specify that each server must each have only one instance.
Specify that each server must have one instance for each database that is hosted on that server.
Specify that each server must have one instance for each customer who has one or more databases that are hosted on that server.
第9题:
read
had read
is reading
has been reading
第10题:
The cargo will spontaneously ignite if released to the atmosphere
You must operate this barge as a lead barge
The barge should be spotted as far away from the towboat as possible
The barge must be in a protected position within the tow
第11题:
Incremental backup
Data only backups
SAN replication
Full backup
第12题:
You should add recipient filter.
You should add create Send connectors.
You should run setup /ps.
You should add setup.com in the script.
第13题:
A.left
B.leave
C.should leave
D.ought to leave
第14题:
You look very tired. You ____ too hard these days.
A. could have worked
B. ought to have worked
C. should have worked
D. must have worked
第15题:
When you go abroad, do you ______ take your passport?
A、have to
B、ought to
C、need
D、must
第16题:
A requirements specification is( ).
A.a rough list of things that the proposed software ought to do
B.a precise list of things that the proposed software ought to do
C.a formal list of things that the proposed software must do
D.an estimate of the resources (time,money,personnel,etc)which will be required to construct the proposed software .
第17题:
In America, which of the following is NOT the requirement for the students wanting to get their driver's license?
A. They must be 16 years old.
B. They should go to have their driver's test.
C. They must reach the proper age to drive.
D. They ought to do well in their driver's course.
54.答案为A 从最后一段第一句可看出在美国,不是每个州都要求驾驶员年满16岁,B、C、 D选项是必需的条件。
第18题:
第19题:
An administrator only has one public IP address that must be shared among five employees. Which of the following network schemes should be used?()
第20题:
rmdev -Rdl fcs0
rmdev -cdl fcs0
rmdev -cdl fscsi0
rmdev -Rdl fscsi0
第21题:
Follow the emergency action plan.
Wait for an issue to be reported.
Establish a new baseline.
Determine if escalation is necessary.
第22题:
SNAT
SNAP
NAC
MPLS
第23题:
to the base of the foremast
to the forward-most bitts
to the forward part of the deckhouse
at the stern
第24题:
Educators who advocate a rounded-education should be supported.
It is natural for science students to learn less liberal arts.
Science students ought to have enough knowledge about society.
Technical training must be reinforced in science education.