Copper Pass-thru Modules only support 1000Mb line speeds.
Spanning Tree has been enabled on the Copper Pass-thru Module.
The customer does not have the latest firmware loaded on the Copper Pass-thru Module.
The customer is using LS21 Blades
第1题:
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()
第2题:
A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()
第3题:
When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why?()
第4题:
A customer is looking for a scalable KVM solution that supports at least 512 servers and is manageable locally and through the IP network. Which IBM KVM solution should a specialist propose to this customer?()
第5题:
A customer is concerned about the high energy cost associated with their data center. Specifically, their concern focuses on the cooling cost of many hundreds of servers. You have a meeting with the CIO and CFO to propose a solution. How would you prepare yourself for the meeting? ()
第6题:
xSeries specialist,as the customer may have some Intel-based systems.
Hardware customer engineer,as they will be installing the entire solution.
Services specialist,as they can provide education recommendations for the entire solution.
Storage specialist,as the customer may need disk to store the data and tape to backup the data.
第7题:
Since their capacities and usage models vary, ask the customer to turn off some of the servers during off-peak and low demand time.
Investigate their expansion plans and suggest to the customer the removal of some of their servers to another location and retirement of the older servers.
Contact the CFO to find out the targeted energy savings of the company and propose to the customer the purchase of a more efficient cooling system.
Contact the CIO for a list of servers and type/model numbers. Complete a proposal outlining the savings on energy cost by deploying an IBM BladeCenter solution and total cost of ownership and return on investment.
第8题:
48 Ethernet 10/100 ports
Fast Ethernet and Gigabit Ethernet connectivity
dual-purpose copper or fiber uplinks
standalone fixed-configuration Layer 2 switching
第9题:
Send the customer information on VMware
Send the customer information on IBM BladeCenter
Call the customer to ask why they are consolidating
Send the customer information on IBM System P
第10题:
Utilizes existing infrastructure
Provides direct host attached solution
NAS storage will use the reliable iSCSI protocol
Long distances after upgrading all host connections to fibre
第11题:
The customer is looking for a fibre SAN solution to increase reliability and performance.
The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.
The customer is cost-conscious and is looking for a centralized storage solution.
The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
第12题:
You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.
Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.
The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.
The blade servers do not work with the Optical Pass-Thru Module.
第13题:
A customer is interested in obtaining an AIX solution from IBM. They have two primary global requirements: ? Availability (although HACMP is not required) ? Low cost Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()
第14题:
A customer is running an application with large block files that contain images and video files. They have a requirement for a low cost storage solution. The consultant recommended considering the NAS solution. Which of the following benefits will the NAS solution provide?()
第15题:
A Sales Specialist receives an email from a customer, requesting information on IBM’s best Server Consolidation solution. How should the Sales Specialist proceed? ()
第16题:
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM). What TRUE statement should be mentioned to the customer regarding the OPM?()
第17题:
Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()
第18题:
Two dual-port PCIe adapters
A four-port PCIe Ethernet adapter
Four separate PCIe Ethernet adapters
Two embedded Integrated Virtual Ethernet adapters (IVE)
第19题:
4GB Modular Flash Drive for each Blade Server and Dual 15.8GB 2.5 Solid State Drive for each Blade Server
Cisco Intelligent Gb Ethernet Switch Module and IBM BladeCenter Copper Pass-thru Module
Fibre Channel Expansion Card for each Blade Server and Fibre Channel SAN Switch Module
Cisco Intelligent Gb Ethernet Switch Module and Dual 15.8GB 2.5 Solid State Drive for each Blade Server
第20题:
Higher rack density that reduces data center footprints
Internal upgrades that only IBM can offer
Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches
The Rear Door Heat eXchanger that only IBM can offer
第21题:
Design the least-cost solution to prevent the competition from winning the business.
Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.
Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.
Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.
第22题:
Copper Pass-thru Modules only support 1000Mb line speeds.
Spanning Tree has been enabled on the Copper Pass-thru Module.
The customer does not have the latest firmware loaded on the Copper Pass-thru Module.
The customer is using LS21 Blades
第23题:
N7900
N6040
DS3300
DS3500
第24题:
Install the exhaust fan on top of the IBM NetBAY 42 Enterprise rack for extra cooling
Ensure a 260V power source for the x445 and BladeCenter is available for fully redundant power
Ensure a 220v power source for the x445 is available for fully redundant power
Install the new 10GBit Ethernet network to take advantage of the new network switch in the x445.
Have their Network Operation Staff review and assist connecting the new server to their existing network.