单选题You are peer reviewing a fellow DBAs backup plan for his NOARCHIVELOG mode database, as shown here:   Put the tablespaces in backup mode.  Back up the datafiles for all tablespaces. Take the tablespaces out of backup mode. Back up all archived redo log

题目
单选题
You are peer reviewing a fellow DBAs backup plan for his NOARCHIVELOG mode database, as shown here:   Put the tablespaces in backup mode.  Back up the datafiles for all tablespaces. Take the tablespaces out of backup mode. Back up all archived redo logs.   Your colleague asks for you to comment on his plan.  Which response would be correct?()
A

 The plan will work as is.

B

 The plan needs to be modified to allow for an archive-log switch after step 3.

C

 The plan needs to be modified so that a backup of the archived redo logs occurs before step 1.

D

 The plan needs to be adjusted to shut down the database after step 1 and to restart the database after step 2.

E

 The plan cannot work as presented.


相似考题

3.Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work. Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house. When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate. The phrase "draw a plan" in this passage means _______A.making a picture of a building or a room B.making a plan C.working out a plan D.pulling a picture out of a room

4.Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings(环境)near shops and bus stops, not too far from your friends and the place where you work.Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets.The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate(预算)must be corrected and revised(修订). His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high!) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builders estimate depends on the plan, but the final plan depends on the builders estimate.21. The best title of this passage is().A. Building a House Costs Much MoneyB. Estimate Is ImportantC. Planning a House22. The first thing for a person to build a house is().A. to get as much money as possibleB. to find a suitable piece of landC. to work out a plan23. The phrase”draw a plan”in this passage means().A. making a picture of a building or a roomB. making a planC. working out a plan24. When the builder starts to build a house, his estimate will have to be corrected and revised because().A. it is wrongly worked out by a workmanB. the future owner of the house thinks the estimate is so high that he cannot afford the buildingC. the prices of building materials and the expenses(费用)of labor may be different from the original prices and expenses25. What is the relationship(关系)between the estimate and the plan?A. The plan depends on the estimate.B. The plan has nothing to do with the estimate.C. The estimate and the plan depend on each other.

更多“You are peer reviewing a fellow DBAs backup plan for his NOA”相关问题
  • 第1题:

    根据下列内容,回答191-195题。
    Building a house costs quite a lot of money. Suppose you plan to build a house. Your first stepwill be to find a right piece of land. Your choice will depend on many different things. You willprobably try to find a sunny place, with pleasant surroundings near shops and bus stops, not toofar from your friends and the place where you work.
    Next you will find a good builder, and together with the builder you will work out a plan. Thebuilder will draw the plan. It will show the number of rooms, their position and size, and otherparts, which must be noticed, such as windows, doors, and electric outlets. The builder will workout how much money is needed to build your house. He will work out the cost of the wood, bricks,the glass, and everything else that must be used in building the house. Later on, when he starts tobuild, this estimate must be corrected and revised. His estimate is based on existing prices, butprices of such things may change, and many other things may happen between the time when hemakes the estimate and the time when he builds the house.
    When the builder gives his estimate, you may wish to change your plan.(You may also wish tochange your builder, if his estimate is too high! ) You may find that the house you wanted at firstcosts too much, or that you can spend a little more and add something to your plan. The builder'sestimate depends on the plan, but the final plan depends on the builder's estimate.
    The best title of this passage is

    A.Building a House Costs Much Money
    B.Estimate Is Important
    C.Planning a House
    D.Depend on the Builder

    答案:C
    解析:
    本题考查对整篇短文中心思想的理解能力。A项讲的是“盖一幢房子要花很多钱”,这是本文的第一句话,但它只讲了上述三段的盖房子要花很多钱这一项内容,所以其概括不准确。B项是说“预算是重要的”.同样犯了以偏概全的毛病。D项讲的是“依靠建筑工”,这与短文内容是相矛盾的,故此三者皆否定之。

  • 第2题:

    Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work.
    Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.
    When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.
    The best title of this passage is ________

    A.Building a House Costs Much Money
    B.Estimate Is Important
    C.Planning a House
    D.Depend on the Builder

    答案:C
    解析:
    本题考查对整篇短文中心思想的理解。A项讲的是“盖一幢房子要花很多钱”,这是本文的第一句话,但它只讲了上述三段的盖房子要花很多钱这一项内容,所以其概括不准确。B项是说“预算是重要的”.同样犯了以偏概全的毛病。D项讲的是“依靠建筑工”,这与短文内容是相矛盾的.故此三者皆否定之。

  • 第3题:

    You work as a database administrator for Supportcenter.cn. You are using Recovery Manager (RMAN) for backup and recovery of your database. You executed the delete command in RMAN to delete a backup of a tablespace. Which statement is true in this scenario?()

    • A、The backup status will be marked expired in RMAN recovery catalog.
    • B、The backup status will be marked deleted in RMAN recovery catalog after you execute the crosscheck command.
    • C、The backup will be deleted physically from the OS (Operating system)and the backup information is removed from the recovery catalogl
    • D、The backup status will be marked deleted and you must delete the backup file manually from the OS (Operating system).
    • E、The backup status will be marked deleted and you must delete the backup file manually from the OS (Operating system), if you are not using Oracle Managed Files (OMF).

    正确答案:C

  • 第4题:

    You are a network administrator for The network contains a Windows Server 2003 computer named Testking1. You need to install an application on Testking1. The installation will cause several changes to the registry. You plan to use the Backup utility to create a backup that will enable you to restore the registry. TestKing requirements for network management state that all backups must be performed during an eight-hour period at night. Because of this time constraint, you need to ensure that the backup can be recovered as quickly as possible. You need to create a backup that meets the requirements. What should you do?()

    • A、Create a backup of the system partition.
    • B、Create a backup of the boot partition.
    • C、Create a backup of the System State.
    • D、Create an Automated System Recovery (ASR) backup.
    • E、Create a backup of the Systemroot/System32/Config folder.

    正确答案:C

  • 第5题:

    You have a portable computer that runs Windows 7. Windows Backup is configured to run every day at15:00. You need to prevent backups from automatically running when the computer is running on thebattery.  What should you do?()

    • A、From Backup and Restore, click Change settings.
    • B、From Task Scheduler, modify the AutomaticBackup task.
    • C、From Power Options, modify the settings of the current power plan.
    • D、From the local computer policy, modify the power management settings.

    正确答案:B

  • 第6题:

    You have an Exchange Server 2010 organization that contains two Hub Transport servers.  You need to design a recovery plan for the Hub Transport servers that meets the following requirements:.Restores all Windows settings .Restores all Exchange configurations.Minimizes administrative effort What should you include in the plan?()

    • A、.Retention of Exchange server computer accounts in Active Directory .Backup and recovery of Windows system stateA recovery installation of Exchange Server 2010
    • B、.Retention of Exchange server computer accounts in Active Directory .Backup and recovery of transport queues.A custom installation of Exchange Server 2010
    • C、Recovery of Windows system state.Backup and recovery of transport queues.A typicalinstallation of Exchange Server 2010
    • D、Backup and recovery of Windows system state.A repair installation of Windows Server 2008.A typical installation of Exchange Server 2010

    正确答案:A

  • 第7题:

    You work in a company which is named Wiikigo Corp. The company uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. You configure the SQL Server instance to use the -T1222 and -T1204 trace flags during startup. You must make sure that your failure recovery plan performs backup of the use of the trace flags. So what action should you perform to achieve this goal? () 

    • A、You should backup the master database
    • B、You should backup the default.trc file
    • C、You should backup the SQL Server registry hive.
    • D、You should backup the resource database 

    正确答案:C

  • 第8题:

    You are designing a performance monitoring plan for the database that supports APP1. You need to monitor only necessary indicators. Which indicator or indicators should you include in the baseline?()

    • A、response times for frequently used queries
    • B、database backup and restore completion times
    • C、disk I/O
    • D、CPU utilization
    • E、network packet size
    • F、SOAP requests failed

    正确答案:A,C,D

  • 第9题:

    单选题
    Wang’s zeal was contagious; soon all his fellow students were busily making posters, inspired by his ardent enthusiasm for the cause.
    A

    eager    

    B

    enthusiasm      

    C

    zealot      

    D

    fanatic


    正确答案: B
    解析: 句意:王的热情是有感染性的。受到他狂热行为的鼓舞,他所有的同学很快就忙着制作海报了。zeal热心,热情。enthusiasm与之同义。eager热心于,渴望着。zealot狂热者。fanatic狂热者。狂热的。

  • 第10题:

    单选题
    Your company has 250 branch offices.   Your network contains an Active Directory domain. The domain controllers run Windows Server 2008 R2.   You plan to deploy Read-only Domain Controllers (RODCs) in the branch offices. You need to plan the deployment of the RODCs to meet the following requirements: èBuild each RODC at the designated branch office.   èEnsure that the RODC installation source files do not contain cached secrets.   èMinimize the bandwidth used during the initial synchronization of Active Directory Domain Services (AD?DS).   What should you include in your plan?()
    A

    Use Windows Server Backup to perform a full backup of an existing domain controller. Use thebackup to build the new RODCs.

    B

    Use Windows Server Backup to perform a custom backup of the critical volumes of an existing domain controller. Use the backup to build the new RODCs.

    C

    Create a DFS namespace that contains the Active Directory database from one of the existing domain controllers. Build the RODCs by using an answer file.

    D

    Create an RODC installation media. Build the RODCs from the RODC installation media.


    正确答案: A
    解析: 暂无解析

  • 第11题:

    多选题
    You are designing a performance monitoring plan for the database that supports APP1. You need to monitor only necessary indicators. Which indicator or indicators should you include in the baseline?()
    A

    response times for frequently used queries

    B

    database backup and restore completion times

    C

    disk I/O

    D

    CPU utilization

    E

    network packet size

    F

    SOAP requests failed


    正确答案: A,C,D
    解析: 暂无解析

  • 第12题:

    单选题
    You are the network administrator for Test King. All network servers run Windows Server 2003. You perform a full backup of the network every Monday. You perform incremental backups on Tuesday, Wednesday, Thursday, and Friday. Backups are always performed at 1:00 A.M. On Friday afternoon, a user accidentally deletes a file. You need to restore the file. What should you do?()
    A

    Open each backup log, beginning with Monday and moving forward through the week. In each log, search for a backup of the file. Restore the first backup that you find.

    B

    Open each backup log, beginning with Friday and moving backward through the week. In each log, search for a backup of the file. Restore the first backup that you find.

    C

    Open each backup log, beginning with Tuesday and moving forward through the week. In each log, search for a backup of the file. Restore the first backup that you find.

    D

    Open the backup log for Monday. Search for a backup of the file. If you find a backup, restore the file. If you do not find a backup, open the backup log for Friday and search there. If you find a backup, restore the file. If you do not find a backup, continue opening backup logs, moving backward through the week from Friday Restore the first backup that you find.


    正确答案: B
    解析: 暂无解析

  • 第13题:

    Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work.
    Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.
    When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.
    When the builder starts to build a house, his estimate will have to be corrected and revised because _______.

    A.it is wrongly worked out by a workman
    B.the future owner of the house thinks the estimate is so high that he cannot afford the building
    C.the prices of building materials and the expenses of labor may be different from the original prices and expenses
    D.estimates are usually mistaken in the beginning

    答案:C
    解析:
    本题属细节考查题。考查的是在盖房的施工中,最初的预算必须更正与修改的原因。短文第二段的倒数一、二句就有相对应的部分;随后,当他开始施工时,此预算必须更改与修正。他的预算的根据是当时的价格,而建筑材料与其他东西的价格在制定预算和开始施工这一阶段很可能会有变化。A项说的是“预算经常被施工者算错”,在短文中找不到依据;B项的“未来的房主认为预算太高他支付不起”在短文中也没有体现,D项的“在开始时预算往往是错的”与A项的错误一致.

  • 第14题:

    Building a house costs quite a lot of money. Suppose you plan to build a house. Your first step will be to find a right piece of land. Your choice will depend on many different things. You will probably try to find a sunny place, with pleasant surroundings near shops and bus stops, not too far from your friends and the place where you work.
    Next you will find a good builder, and together with the builder you will work out a plan. The builder will draw the plan. It will show the number of rooms, their position and size, and other parts, which must be noticed, such as windows, doors, and electric outlets. The builder will work out how much money is needed to build your house. He will work out the cost of the wood, bricks, the glass, and everything else that must be used in building the house. Later on, when he starts to build, this estimate must be corrected and revised. His estimate is based on existing prices, but prices of such things may change, and many other things may happen between the time when he makes the estimate and the time when he builds the house.
    When the builder gives his estimate, you may wish to change your plan. (You may also wish to change your builder, if his estimate is too high! ) You may find that the house you wanted at first costs too much, or that you can spend a little more and add something to your plan. The builder's estimate depends on the plan, but the final plan depends on the builder's estimate.
    What is the relationship between the estimate and the plan?

    A.The plan depends on the estimate
    B.The estimate depends on the plan
    C.The plan has nothing to do with the estimate
    D.The estimate and the plan depend on each other

    答案:D
    解析:
    本题考查的仍是对短文个别段落和中心意思的理解。短文第三段集中讲的就是和建房方案之间的关系。A项只说出了建房方案对预算的依赖关系;B项只说出预算对建房方案的依赖关系,而忽略它们相互作用的一面,因此都是片面的。而c项说的是建房方案与预算毫不相干,这与短文交代的事实背道而驰.故予以排除。

  • 第15题:

    You are peer reviewing a fellow DBAs backup plan for his NOARCHIVELOG mode database, as shown here:   Put the tablespaces in backup mode.  Back up the datafiles for all tablespaces. Take the tablespaces out of backup mode. Back up all archived redo logs.   Your colleague asks for you to comment on his plan.  Which response would be correct?()

    • A、 The plan will work as is.
    • B、 The plan needs to be modified to allow for an archive-log switch after step 3.
    • C、 The plan needs to be modified so that a backup of the archived redo logs occurs before step 1.
    • D、 The plan needs to be adjusted to shut down the database after step 1 and to restart the database after step 2.
    • E、 The plan cannot work as presented.

    正确答案:B

  • 第16题:

    You have an Exchange Server 2010 organization that contains two Hub Transport servers.  You need to design a recovery plan for the Hub Transport servers that meets the following requirements: .Restores all Windows settings .Restores all Exchange configurations.Minimizes administrative effort What should you include in the plan?()

    • A、.Retention of Exchange server computer accounts in Active Directory .Backup and recovery of Windows system stateA recovery installation of Exchange Server 2010
    • B、.Retention of Exchange server computer accounts in Active Directory .Backup and recovery of transport queues.A custom installation of Exchange Server 2010
    • C、Recovery of Windows system state.Backup and recovery of transport queues.A typical installation of Exchange Server 2010
    • D、Backup and recovery of Windows system state.A repair installation of Windows Server 2008.A typical installation of Exchange Server 2010

    正确答案:A

  • 第17题:

    You use Hyper-V Server 2008 R2 and failover clustering to host several virtual machines (VMs). You plan to perform a Volume Shadow Copy (VSS) backup of a Cluster Shared Volume (CSV). You need to ensure that resources can continue to use the CSV during the VSS backup. What should you do?()

    • A、Turn on redirected access for the CSV.
    • B、Turn on maintenance mode for the CSV.
    • C、Use Failover Cluster Manager to remove dependencies from your disk resources.
    • D、Configure your VSS-aware backup utility as a generic application in failover clustering.

    正确答案:A

  • 第18题:

    You work as an application developer at Certkiller .com. You are currently in theprocess of reviewing an application that was created by a fellow developer.The application that you are reviewing includes a declaration for a collection named EmployeeList, which stores Employee objects. The declaration is shown below: public class EmployeeList : Enumerator, IEnumerable { // Class implementation } You require the ability to iterate through the EmployeeList with minimum development effort.What should you do?()

    • A、 Utilize the switch statement
    • B、 Utilize the dowhile statement
    • C、 Utilize the foreach statement
    • D、 Utilize the if statement

    正确答案:C

  • 第19题:

    You work in a company which uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. You have to perform the backup of the default trace according to the requirement of your failure recovery plan. The default trace is contained in the subdirectory.You have to backup the subdirectory.  Which SQL Server database engine subdirectory should be backed up?()

    • A、DATA
    • B、INSTALL 
    • C、LOG 
    • D、BINN

    正确答案:C

  • 第20题:

    单选题
    You have an Exchange Server 2010 organization that contains two Hub Transport servers.  You need to design a recovery plan for the Hub Transport servers that meets the following requirements: .Restores all Windows settings .Restores all Exchange configurations.Minimizes administrative effort What should you include in the plan?()
    A

    .Retention of Exchange server computer accounts in Active Directory .Backup and recovery of Windows system stateA recovery installation of Exchange Server 2010

    B

    .Retention of Exchange server computer accounts in Active Directory .Backup and recovery of transport queues.Acustom installation of Exchange Server 2010

    C

    Recovery of Windows system state.Backup and recovery of transport queues.A typical installation of Exchange Server 2010

    D

    Backup and recovery of Windows system state.A repair installation of Windows Server 2008.A typical installation of Exchange Server 2010


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    You are peer reviewing a fellow DBAs backup plan for his NOARCHIVELOG mode database, as shown here:   Put the tablespaces in backup mode.  Back up the datafiles for all tablespaces. Take the tablespaces out of backup mode. Back up all archived redo logs.   Your colleague asks for you to comment on his plan.  Which response would be correct?()
    A

     The plan will work as is.

    B

     The plan needs to be modified to allow for an archive-log switch after step 3.

    C

     The plan needs to be modified so that a backup of the archived redo logs occurs before step 1.

    D

     The plan needs to be adjusted to shut down the database after step 1 and to restart the database after step 2.

    E

     The plan cannot work as presented.


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    You are a network administrator for The network contains a Windows Server 2003 computer named Testking1. You need to install an application on Testking1. The installation will cause several changes to the registry. You plan to use the Backup utility to create a backup that will enable you to restore the registry. TestKing requirements for network management state that all backups must be performed during an eight-hour period at night. Because of this time constraint, you need to ensure that the backup can be recovered as quickly as possible. You need to create a backup that meets the requirements. What should you do?()
    A

    Create a backup of the system partition.

    B

    Create a backup of the boot partition.

    C

    Create a backup of the System State.

    D

    Create an Automated System Recovery (ASR) backup.

    E

    Create a backup of the Systemroot/System32/Config folder.


    正确答案: E
    解析: 暂无解析

  • 第23题:

    多选题
    You plan to take a closed database backup using operating system commands. Which three SHUTDOWN options are appropriate for this type of backup?()
    A

    ABORT

    B

    NORMAL

    C

    IMMEDIATE

    D

    TRANSACTIONAL


    正确答案: A,B
    解析: 暂无解析

  • 第24题:

    单选题
    You work in a company which is named Wiikigo Corp. The company uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. You configure the SQL Server instance to use the -T1222 and -T1204 trace flags during startup. You must make sure that your failure recovery plan performs backup of the use of the trace flags. So what action should you perform to achieve this goal? ()
    A

    You should backup the master database

    B

    You should backup the default.trc file

    C

    You should backup the SQL Server registry hive.

    D

    You should backup the resource database 


    正确答案: A
    解析: 暂无解析