单选题Which of the following procedures will allow an operator to access an LPAR console session?()A Open a vterm from the VIO graphical interface to get the partition console.B Open a vterm from the ASMI graphical interface to get the partition console.C St

题目
单选题
Which of the following procedures will allow an operator to access an LPAR console session?()
A

Open a vterm from the VIO graphical interface to get the partition console.

B

Open a vterm from the ASMI graphical interface to get the partition console.

C

Start an ssh session to the HMC. Use the vtmenu command to select the desired LPAR.

D

Start an ssh session to the VIO. Use the vtmenu command to select the desired LPAR.


相似考题
更多“单选题Which of the following procedures will allow an operator to access an LPAR console session?()A Open a vterm from the VIO graphical interface to get the partition console.B Open a vterm from the ASMI graphical interface to get the partition console.C St”相关问题
  • 第1题:

    Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()

    • A、 The Hardware Management Console (HMC) and Integrated Virtualization Manager (IVM).
    • B、 The Hardware Management Console (HMC) and Advanced System Manager Interface (ASMI).
    • C、 Integrated Virtualization Manager (IVM) and Advanced System Manager Interface (ASMI).
    • D、 Integrated Virtualization Manager (IVM) and BladeCenter Advanced Management Module (AMM).

    正确答案:A

  • 第2题:

    Which of the following can be used to re-deploy a system configuration in a disaster recovery scenario?()

    • A、System plan
    • B、System profile
    • C、Critical console data
    • D、VIO server partition profile

    正确答案:A

  • 第3题:

    After making changes to the profile for an LPAR, the administrator asks the operator to bring the LPAR back up into a running state with the new changes. Which of the following is the correct way to do this?()

    • A、Shutdown and activate the partition profile
    • B、Reboot the partition using the reboot command
    • C、Reboot the partition using the 'shutdown -r' command
    • D、Right click on the partition profile and select the 'apply changes' option

    正确答案:A

  • 第4题:

    A customer is configuring Live Partition Mobility on two POWER6-based servers,  Which of the following is required on both the source and the destination VIO servers for the mobile partition to participate in an active partition migration?()

    • A、 IBM Director connection
    • B、 Dynamic LPAR Resource Manager (DLRM)
    • C、 Barrier Synchronization Register Device (BSR)
    • D、 Virtual Asynchronous Services Interface (VASI)

    正确答案:D

  • 第5题:

    A system administrator wants to control the HMC from their workstation. Microsoft Windows 2000 is running and the HMC graphical user interface is being used remotely. Which of the following actions will accomplish this task?()

    • A、Use any Windows 2000 to graphically access the HMC
    • B、Load, install, and configure WebSM on the workstation
    • C、Telnet to the HMC using Exceed or a GUI emulator product from the workstation
    • D、Load, install, and configure OpenSSH or SSH on the workstation and access the HMC through the GUI interface

    正确答案:B

  • 第6题:

    You need to configure a new computer to dual-boot to the following operating systems:  Microsoft Windows XP Professional Microsoft Windows Vista  Which two procedures should you perform? ()

    • A、Create two partitions. Install Windows XP Professional on the first partition. Boot the computer from the Windows Vista DVD-ROM. Install Windows Vista on the second partition.
    • B、Create two partitions. Install Windows Vista on the first partition. Boot from the Windows XP Professional installation CD-ROM. Install Windows XP Professional on the second partition. 
    • C、Create one partition. Install Windows XP Professional on the partition. From Windows XP Professional launch the Windows Vista setup utility. Install Windows Vista in the same partition. 
    • D、Create two partitions. Install Windows XP Professional on the first partition. From Windows XP Professional launch the Windows Vista setup utility. Install Windows Vista on the second partition.

    正确答案:A,D

  • 第7题:

    单选题
    After rebooting one Virtual IO (VIO) server in a redundant environment, the following command output from the client partition shows that the path to the shared disk from the rebooted VIO server remains in a failed state.  Vio_client1# lspath Failed hdisk0 vscsi0 Enabled hdisk0 vscsi1 What must the administrator do to ensure that the path is automatically restored when a VIO server is brought back into service? ()
    A

     On both VIO servers, modify the inittab making chdev the last command, so that they will start during VIO server reboot.

    B

     On both VIO servers, change the following parameters and reboot each of them in turn    hcheck_interval =60   hcheck_mode=interactive

    C

     On client logical partition, modify the inittab making chdev the last command, so that they will start during client partition reboot.

    D

     On the client logical partition, change the following parameters and reboot the client    hcheck_interval =60   hcheck_mode=interactive


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    What does the "allow performance information collection" button do in the Hardware Management Console (HMC) GUI? ()
    A

     It allows you to get inter partition reports, or cross partition performance activity.

    B

     It will allow IBM remote technical support to get performance information from the machine.

    C

     It is effective only on POWER6 and when Live Partition Mobility operations are planned.

    D

     It will start standard performance monitoring tools when an LPAR boots up, the output will be saved to the /etc/perf directory by default.


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    In order to support Live Partition Mobility (LPM) for a given LPAR between two Power servers, which type of backing device should be chosen for the storage devices presented from the VIO server to the LPAR?()
    A

    LUN-backed devices

    B

    File-backed devices

    C

    Logical volume-backed devices

    D

    Network Filesystem-backed (NFS) devices


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A System p customer is planning to implement virtualization and is concerned about how to respond  to an increased workload and what limitations there are for very small workloads.  Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()
    A

    Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.

    B

    Smallest partition 10% of a processor, as small 1% of a processor may be transferred.

    C

    Smallest partition one processor, as small 1% of a processor may be transferred.

    D

    Smallest partition one core, as small 10% of a processor may be transferred.


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    A system administrator wants to control the HMC from their workstation. Microsoft Windows 2000 is running and the HMC graphical user interface is being used remotely. Which of the following actions will accomplish this task?()
    A

    Use any Windows 2000 to graphically access the HMC

    B

    Load, install, and configure WebSM on the workstation

    C

    Telnet to the HMC using Exceed or a GUI emulator product from the workstation

    D

    Load, install, and configure OpenSSH or SSH on the workstation and access the HMC through the GUI interface


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    Companycom purchased a p5 570 with no plans to partition. The customer plans to use the ASMI interface to power on and off the machine. How can ASMI be accessed without a HMC?()
    A

    By typing diags and then going to the ASMI menus

    B

    Through SSH from a TCP/IP connection on the server

    C

    Through WebSM which is connected to a system Ethernet port

    D

    By connecting through a web browser to an HMC Ethernet port


    正确答案: D
    解析: 暂无解析

  • 第13题:

    What does the "allow performance information collection" button do in the Hardware Management Console (HMC) GUI? ()

    • A、 It allows you to get inter partition reports, or cross partition performance activity.
    • B、 It will allow IBM remote technical support to get performance information from the machine.
    • C、 It is effective only on POWER6 and when Live Partition Mobility operations are planned.
    • D、 It will start standard performance monitoring tools when an LPAR boots up, the output will be saved to the /etc/perf directory by default.

    正确答案:A

  • 第14题:

    Which of the following interfaces is required to implement Workload Partition Mobility? ()

    • A、 Workload Partitions Manager for AIX
    • B、 Hardware Management Console (HMC) GUI
    • C、 Integrated Virtualization Manager (IVM)
    • D、 Advanced System Management Interface (ASMI)

    正确答案:A

  • 第15题:

    Companycom purchased a p5 570 with no plans to partition. The customer plans to use the ASMI interface to power on and off the machine. How can ASMI be accessed without a HMC?()

    • A、By typing diags and then going to the ASMI menus
    • B、Through SSH from a TCP/IP connection on the server
    • C、Through WebSM which is connected to a system Ethernet port
    • D、By connecting through a web browser to an HMC Ethernet port

    正确答案:D

  • 第16题:

    A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()

    • A、An HMC is required for dual VIO servers.
    • B、Dual VIO servers require a split backplane.
    • C、A dual VIO enablement code must be entered from the ASMI interface.
    • D、The second VIO server must be created using the IVM command line interface.

    正确答案:A

  • 第17题:

    In Solaris 10, this tool provides an automated and proactive approach to patch management. It provides a graphical user interface as well as a command line interface.  Which tool is it? ()

    • A、 smpatch
    • B、 Patchtool
    • C、 Update manager
    • D、 Patch manager

    正确答案:C

  • 第18题:

    单选题
    Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()
    A

     The Hardware Management Console (HMC) and Integrated Virtualization Manager (IVM).

    B

     The Hardware Management Console (HMC) and Advanced System Manager Interface (ASMI).

    C

     Integrated Virtualization Manager (IVM) and Advanced System Manager Interface (ASMI).

    D

     Integrated Virtualization Manager (IVM) and BladeCenter Advanced Management Module (AMM).


    正确答案: D
    解析: 暂无解析

  • 第19题:

    单选题
    Which of the following interfaces is required to implement Workload Partition Mobility? ()
    A

     Workload Partitions Manager for AIX

    B

     Hardware Management Console (HMC) GUI

    C

     Integrated Virtualization Manager (IVM)

    D

     Advanced System Management Interface (ASMI)


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    A customer is configuring Live Partition Mobility on two POWER6-based servers,  Which of the following is required on both the source and the destination VIO servers for the mobile partition to participate in an active partition migration?()
    A

     IBM Director connection

    B

     Dynamic LPAR Resource Manager (DLRM)

    C

     Barrier Synchronization Register Device (BSR)

    D

     Virtual Asynchronous Services Interface (VASI)


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
    A

     Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.

    B

     Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.

    C

     Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.

    D

     Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    After making changes to the profile for an LPAR, the administrator asks the operator to bring the LPAR back up into a running state with the new changes. Which of the following is the correct way to do this?()
    A

    Shutdown and activate the partition profile

    B

    Reboot the partition using the reboot command

    C

    Reboot the partition using the 'shutdown -r' command

    D

    Right click on the partition profile and select the 'apply changes' option


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A Power 720 customer using IVM wants to implement dual VIO servers, but is unable to create the second server. What is the most likely reason for this?()
    A

    An HMC is required for dual VIO servers.

    B

    Dual VIO servers require a split backplane.

    C

    A dual VIO enablement code must be entered from the ASMI interface.

    D

    The second VIO server must be created using the IVM command line interface.


    正确答案: D
    解析: 暂无解析