Since their capacities and usage models vary, ask the customer to turn off some of the servers during off-peak and low demand time.
Investigate their expansion plans and suggest to the customer the removal of some of their servers to another location and retirement of the older servers.
Contact the CFO to find out the targeted energy savings of the company and propose to the customer the purchase of a more efficient cooling system.
Contact the CIO for a list of servers and type/model numbers. Complete a proposal outlining the savings on energy cost by deploying an IBM BladeCenter solution and total cost of ownership and return on investment.
第1题:
Kelly: _________
Tony: I'm OK.
A、How have you been?
B、How do you do?
C、Nice to meet you.
D、Fancy meeting you here.
第2题:
A security analysis at The Potomac Canal Company recommends installing an IDS appliance anda firewall appliance. These appliances should connect directly into a Layer 3 switch. A loadbalancer and SSL termination have also been recommended.Potomac’s management haveexpressed concern over the cost. You suggest using integrated blades. What is one advantage and one disadvantage of yourdesign proposal? ()
第3题:
You have successfully sold and installed your customer’s System x solution. Sometimes, the overall succeed of a sale depends on how well you have trained your customer to support their new hardware. Please consider the following tools. Which one would be the best for protectively determining a server outage, and contacting the system administrator about the outage?()
第4题:
The customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life of this asset. The customer will want to use the advanced features of VMware like VMotion. The customer is concerned about cost. Which of the following meets the customers needs?()
第5题:
A customer is concerned about the high energy cost associated with their data center. Specifically, their concern focuses on the cooling cost of many hundreds of servers. You have a meeting with the CIO and CFO to propose a solution. How would you prepare yourself for the meeting? ()
第6题:
You have created a Host Checker policy that contains multiple rules. You want to inform end users which rule specifically has failed.In the admin GUI, which configuration setting would you enable?()
第7题:
DS3500 with SAS Host Connection
DS3500 withiSCSI Host Connection
DS3500 with FC Connection
DS5020
第8题:
Create a data source view named DsvContoso that is associated with the two data sources and add the tables to the data source view.
Create a data source view named DsvContoso that is associated with the two data sources and create a named query in the data source view to merge the tables.
Create a data source view named DsvCustomer that is associated with the Contoso data source and add the CustomerDetails table to the data source view.Create a data source view named DsvCustomerContact that is associated with the ContosoCRM data source and add the CustomerContact table to the data source view.
Create a data source view named DsvCustomer that is associated with the Contoso data source and create a named query in the data source view to select data from the CustomerDetails table.Create a data source view named DsvCustomerContact that is associated with the ContosoCRM data source and create a named query in the data source view to select data from the CustomerContact table.
第9题:
Higher rack density that reduces data center footprints
Internal upgrades that only IBM can offer
Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches
The Rear Door Heat eXchanger that only IBM can offer
第10题:
The customer is looking for a fibre SAN solution to increase reliability and performance.
The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.
The customer is cost-conscious and is looking for a centralized storage solution.
The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
第11题:
DS8700 with Easy Tier
XIV Storage System with SVC
XIV Storage System with CoD
DS5020 with Enhanced Remote Mirroring
第12题:
learn how much you can charge for each dish.
decide on what kind of food to offer them.
know the cost of running the restaurant.
predict how many customers will arrive.
第13题:
A. Enable Custom Instructions
B. Pre-auth notification
C. Remediation message
D. Send reason strings
第14题:
As a Cisco Network Engineer, you have to master the knowledge of the Cisco Storage Area Network solution for the data center. Which three of the following are features of it? ()(Choose three.)
第15题:
A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers. Which of the following should the Sales Specialist emphasize to address the pricing difference?()
第16题:
A local manufacturing customer is looking for a highly scalable, easy to use disk storage system tosupport a new application they are bringing into the data center. The customer has an initialrequirement for 40 TB of high performance storage but they expect to more than double thecapacity needed once the application goes into full production. What IBM solution would be themost cost effective while meeting their initial requirements?()
第17题:
Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()
第18题:
第19题:
It provides multiprotocol support.
It allows you to create separate networks on the VSAN.
It allows you to migrate to new technologies without a complete equipment upgrade.
It reduces cost and complexity by providing an easy transition to evolving technologies.
第20题:
see anything you like
ask how much his house is
ask the cost of any of the items in it
only see the downstairs that you are invited into
第21题:
CDAT
Configuration and Options Guide (COG)
Physical Alarm Sounding in Data Center
IBM Systems Director
第22题:
第23题: