单选题A customer with two x445 servers wants to have two NetXtreme Dual Port Gigabit Ethernet adapters installed in each server.  What is the minimally supported configuration that will allow maximum throughput?()A Install the two cards in slots 5 and 6 in t

题目
单选题
A customer with two x445 servers wants to have two NetXtreme Dual Port Gigabit Ethernet adapters installed in each server.  What is the minimally supported configuration that will allow maximum throughput?()
A

Install the two cards in slots 5 and 6 in the x445.

B

Install the two cards in slots 3 and 5 in the x445 make sure slots 4 and 6 are not occupied.

C

Install an RXE-100 on each x445 and install one card in the x445 and one card in an RXE-100 on each system.

D

Connect an RXE-100 between the two x445s and install one card in each x445 and one card in each side of the RXE-100.


相似考题
更多“单选题A customer with two x445 servers wants to have two NetXtreme Dual Port Gigabit Ethernet adapters installed in each server.  What is the minimally supported configuration that will allow maximum throughput?()A Install the two cards in slots 5 and 6 in t”相关问题
  • 第1题:

    A customer with two x445 servers wants to have two NetXtreme Dual Port Gigabit Ethernet adapters installed in each server.  What is the minimally supported configuration that will allow maximum throughput?()

    • A、Install the two cards in slots 5 and 6 in the x445.
    • B、Install the two cards in slots 3 and 5 in the x445 make sure slots 4 and 6 are not occupied.
    • C、Install an RXE-100 on each x445 and install one card in the x445 and one card in an RXE-100 on each system.
    • D、Connect an RXE-100 between the two x445s and install one card in each x445 and one card in each side of the RXE-100.

    正确答案:A

  • 第2题:

    Companycom is implementing a pair of Virtual IO Servers to service four LPARs. If each operating system image requires 15GB of disk space, what is the minimum amount of SCSI resource necessary?()

    • A、Two SCSI paths and two 73GB SCSI disks
    • B、Two SCSI paths and two 36GB SCSI disks
    • C、Four SCSI paths and four 73GB SCSI disks
    • D、Two dual port SCSI RAID adapters with two 73GB SCSI disks

    正确答案:A

  • 第3题:

    A customer plans to install ten Microsoft Windows servers, three Linux servers, and five AIX servers, with two Fibre Channel host bus adapters each as part of an IBM DS8700 implementation. What multipathing driver is required to build a redundant solution?()

    • A、RDAC
    • B、MPIO
    • C、SSPC
    • D、SDDPCM

    正确答案:B

  • 第4题:

    A company wants to buy memory efficiently on their p5 590 to allow for the best performance. What is the best practice for adding memory for performance?()

    • A、Install more cards of smaller capacity and same size across MCMs. Use DDR2(dual data rate) memory if using HPC (High Performance Computing). 
    • B、Install fewer cards of larger capacity of the same size across MCMs. Servers with one processor book must have a minimum of four memory cards installed. 
    • C、Intermix DDR1 and DDR2 memory so that partitions requiring the higher performance can take advantage of them. Half of the available memory slots in the system should contain memory. 
    • D、Use fewer higher density memory cards so that a few memory slots are left open for future growth. Each processor book provides sixteen memory card slots. The p5 590 supports a maximum of 64 memory cards.

    正确答案:A

  • 第5题:

    A customer has just purchased an 8-core POWER 570 which has two dual port 1 Gbps  Integrated Virtual Ethernet (IVE) adapters. The customer wants to implement queue pairs (QPs) to take advantage of parallel processing of network traffic to its client logical partitions. Assuming that the system is to utilize the IVEs in both CECs,  which configuration will allow a logical partition to utilize the entire eight cores for network traffic processing?()

    • A、 Set Multiple Core Scaling (MCS) value of the port group to 8 and set multiple core parameter of the client Ethernet adapters to yes.
    • B、 Set Multiple Core Scaling (MCS) value of the port group to 4 and set multiple core parameter of the client Ethernet adapters to yes.
    • C、 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 4 and set multiple core parameter of the client Ethernet adapters to yes.
    • D、 Set Multiple Core Scaling (MCS) value of one of the physical port groups to 8 and set the multiple core parameter of the client Ethernet adapters to yes.

    正确答案:A

  • 第6题:

    A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()

    • A、Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
    • B、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.
    • C、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.
    • D、One switch port will be needed on one switch, a splitter will be needed to split the connection, two ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.

    正确答案:B

  • 第7题:

    A customer is purchasing a 12-way p5-570 to run light development workloads on eight AIX 5.3 partitions with two network adapters each.  When the current network configuration was reviewed, it was discovered that they only have four Ethernet ports available on their network switch.  Which of the following solutions would prevent them from having to buy another network switch or hub?()

    • A、Add two HMCs with two Ethernet adapters each and run EtherChannel for the original eight partitions.
    • B、Add two HMCs with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.
    • C、Add two hosting partitions with two Ethernet adapters each and run EtherChannel for the original eight partitions.
    • D、Add two hosting partitions with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.

    正确答案:D

  • 第8题:

    单选题
    A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()
    A

    Two dual-port PCIe adapters

    B

    A four-port PCIe Ethernet adapter

    C

    Four separate PCIe Ethernet adapters

    D

    Two embedded Integrated Virtual Ethernet adapters (IVE)


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    A customer is purchasing a 12-way p5-570 to run light development workloads on eight AIX 5.3 partitions with two network adapters each.  When the current network configuration was reviewed, it was discovered that they only have four Ethernet ports available on their network switch.  Which of the following solutions would prevent them from having to buy another network switch or hub?()
    A

    Add two HMCs with two Ethernet adapters each and run EtherChannel for the original eight partitions.

    B

    Add two HMCs with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.

    C

    Add two hosting partitions with two Ethernet adapters each and run EtherChannel for the original eight partitions.

    D

    Add two hosting partitions with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()
    A

    Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.

    B

    Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.

    C

    Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.

    D

    One switch port will be needed on one switch, a splitter will be needed to split the connection, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()
    A

    operator training

    B

    cache size of the two clusters

    C

    fibre bandwidth capability between the sites

    D

    number of stacked tape drives attached to each cluster


    正确答案: C
    解析: 暂无解析

  • 第12题:

    单选题
    A customer has just purchased an 8-core POWER 570 which has two dual port 1 Gbps  Integrated Virtual Ethernet (IVE) adapters. The customer wants to implement queue pairs (QPs) to take advantage of parallel processing of network traffic to its client logical partitions. Assuming that the system is to utilize the IVEs in both CECs,  which configuration will allow a logical partition to utilize the entire eight cores for network traffic processing?()
    A

     Set Multiple Core Scaling (MCS) value of the port group to 8 and set multiple core parameter of the client Ethernet adapters to yes.

    B

     Set Multiple Core Scaling (MCS) value of the port group to 4 and set multiple core parameter of the client Ethernet adapters to yes.

    C

     Set Multiple Core Scaling (MCS) value of one of the physical port groups to 4 and set multiple core parameter of the client Ethernet adapters to yes.

    D

     Set Multiple Core Scaling (MCS) value of one of the physical port groups to 8 and set the multiple core parameter of the client Ethernet adapters to yes.


    正确答案: D
    解析: 暂无解析

  • 第13题:

    Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()

    • A、One single port Ethernet adapter
    • B、Four dual port Ethernet adapters
    • C、Two single port Ethernet adapters
    • D、Eight single port Ethernet adapters

    正确答案:A

  • 第14题:

    A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()

    • A、Two switch ports will be needed on a switch,two Ethernet cables will be needed for theserver each connecting to two different Ethernet cards,and one IP address will be needed
    • B、Two switch ports will be needed on two different switches two Ethernet cables will beneeded for the server each connecting to two different Ethernet cards,and one IP address will be needed
    • C、Two switch ports will be needed on two different switches,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,two different IP addresses will be needed
    • D、One switch port will be needed on one switch,a splitter will be needed to split the connection,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,and two different IP addresses will be needed

    正确答案:B

  • 第15题:

    A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem.  They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24.  The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement.  Which two are likely reasons why implementing network adapter teaming has not improved performance?()

    • A、 Adapter teaming is designed to work with switches.
    • B、 Adapter teaming only functions with gigabit network cards.
    • C、 Adapter teaming only provides fault tolerance, not additional bandwidth.
    • D、 Adapter teaming only works with IPX when using switches and network cards with special features that support teaming.

    正确答案:A,D

  • 第16题:

    A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()

    • A、Two dual-port PCIe adapters
    • B、A four-port PCIe Ethernet adapter
    • C、Four separate PCIe Ethernet adapters
    • D、Two embedded Integrated Virtual Ethernet adapters (IVE)

    正确答案:C

  • 第17题:

    A customer has a requirement for a single AIX LPAR to be highly available. The customer only has enough funding to purchase a single system. Which would be the most critical option to mitigate AIX availability?()

    • A、Dual power supplies.
    • B、Twice the amount of disk.
    • C、Two dual-port LHEA adapters.
    • D、Two dual-port fibre channel adapters.

    正确答案:A

  • 第18题:

    A manufacturing customer has a requirement to add 12 additional dual-attached servers to theirexisting two Brocade 16 port SAN switches that have no more ports available. Which of thefollowing should be recommended to accommodate the current capacity requirements, allow forfuture growth and provide 8 and 4 Gb support?()

    • A、two SAN16B 
    • B、two SAN80B-4 
    • C、two SAN24B-4 
    • D、two SAN04B-R

    正确答案:B

  • 第19题:

    单选题
    A customer plans to install ten Microsoft Windows servers, three Linux servers, and five AIX servers, with two Fibre Channel host bus adapters each as part of an IBM DS8700 implementation. What multipathing driver is required to build a redundant solution?()
    A

    RDAC

    B

    MPIO

    C

    SSPC

    D

    SDDPCM


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()
    A

    Two switch ports will be needed on a switch,two Ethernet cables will be needed for theserver each connecting to two different Ethernet cards,and one IP address will be needed

    B

    Two switch ports will be needed on two different switches two Ethernet cables will beneeded for the server each connecting to two different Ethernet cards,and one IP address will be needed

    C

    Two switch ports will be needed on two different switches,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,two different IP addresses will be needed

    D

    One switch port will be needed on one switch,a splitter will be needed to split the connection,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,and two different IP addresses will be needed


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()
    A

    One single port Ethernet adapter

    B

    Four dual port Ethernet adapters

    C

    Two single port Ethernet adapters

    D

    Eight single port Ethernet adapters


    正确答案: B
    解析: 暂无解析

  • 第22题:

    单选题
    A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()
    A

    4

    B

    3

    C

    2

    D

    8


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    Company.com has two POWER5 servers. They want the two servers’ virtual Ethernets to appear on the same IP subnet. Which of the following will connect the client virtual Ethernet adapters to the physical Ethernet switch connecting the two servers?()
    A

    Configure a Shared Ethernet Adapter on the Virtual I/O Server.

    B

    Use the same virtual LAN ID on each LPAR.

    C

    Set up IP routing through an LPAR on each system.

    D

    Set up an IP firewall through an LPAR on each system.


    正确答案: B
    解析: 暂无解析