Is there a need for direct attached SCSI?
Do any of the legacy servers require access to a parallel port or other I/O device not supported by ESX?
Will Flashcopy be required to duplicate VMs?
How much do they expect their storage to grow within the next two years?
第1题:
A company has several legacy servers that upper management would like to move into a virtual environment. Which of the following is the FIRST step an administrator should take to evaluating whether the servers can be moved into the virtual environment?()
第2题:
A customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life of this asset. The customer will want to use the advanced features of VMware like VMotion.The customer is concerned about cost. Which of the following meets the customers needs? ()
第3题:
A customer wants to deploy VMWare ESX on four-way Intel systems. They are considering IBM and Dell.Which of the following is an advantage IBM has over the competition?()
第4题:
A System x sales specialist is creating a proposal for a Unix-installed account. The customer is looking to migrate several business-critical applications onto Linux running on Intel. Which of the following should help IBM meet the customer’s requirements?()
第5题:
A customer has four 2-way 2U front-end web servers that are currently running at 15% CPU utilization. These servers provide points of access for users worldwide, and volume is expected to triple in the next six months and aggressively grow thereafter. They want to upgrade these systems to newer technology and stay within the 8U of rack space that they are replacing. Which solution would fit the customer’s requirements?()
第6题:
The customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life of this asset. The customer will want to use the advanced features of VMware like VMotion. The customer is concerned about cost. Which of the following meets the customers needs?()
第7题:
Purchase a second HMC and use this to manage the new servers.
Connect all of the new servers to the existing private HMC network.
Configure a second private network on their existing HMC for the new servers.
Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
第8题:
DS3500 with SAS Host Connection
DS3500 withiSCSI Host Connection
DS3500 with FC Connection
DS5020
第9题:
Propose VMware with Linux on Intel as a solution.
Provide a special bid on the System x servers.
Include migration services within the proposal.
Provide a warranty offering with guaranteed fix levels.
第10题:
x3650 M3 servers and racks
x3550 M3 servers, VMware and racks
BladeCenter, blades and VMware
x3620 M3 servers and VMware
第11题:
Compare the costs of maintenance between the physical and virtual servers.
Run SYSPREP on each legacy server.
Check the HCL on each legacy server.
Verify that all the latest OS service packs are installed on each server.
第12题:
Ten x306’s with internal SATA drives
Five x346’s with internal SATA drives and VMWare ESX Server
Five x366’s partitioned into two VMs each with VMWare ESX Server
Ten x336’s with internal SATA drives
第13题:
A community hospital has expressed interest in consolidating their legacy Intel servers onto virtual machines with VMWare ESX. They will migrate most of their 2-way processor servers to two x366’s and have confirmed they would like to use a SAN. The IBM specialist visited their datacenter to verify their environment and met with the Systems Admin. Which of the following questions is most critical to verify the solution can be implemented?()
第14题:
A customer needs to deploy ten dual processor Xeon servers. Six servers will be running Linux and Apache, and the other four will be Citrix presentation servers. The customer’s main concerns are the rack space and the option to have SATA drives. The maximum memory required is 8GB. Which of the following options will provide the best price and performance?()
第15题:
Best practices would have no single point of failure between mirrored resources. In setting up virtual, internal boot disks for two client LPARs, how would this be accomplished?()
第16题:
A customer is concerned about rising power costs, and the limited space they have left in the computer room. They have been doing some research into virtualization and would like to know if they should pursue this solution.Which of the following architectural features should be discussed with them?()
第17题:
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()
第18题:
A large customer is consolidating their pSeries systems onto a p5 590. They will have a requirement for a single device (disk, lun) to have multiple paths through different adapters in a single LPAR. The primary applications were written for AIX 5.2. Which of the following would be the recommended solution to satisfy this requirement?()
第19题:
Three x366 4-ways running VMWare ESX Server.
An x445 8-way Xeon MP attached to a DS4300 and running VMWare ESX Server.
An x445 16-way Xeon MP attached to an EXP400 and running VMWare ESX Server.
Four x346 2-ways running VMWare ESX Server.
第20题:
DS4000 storage does not support HP-UX, so the HP-UX server cannot be integrated.All other new servers can be used.
An Exchange cluster needs local disks, so the DS4000 cannot be used for this.All other new servers can be used.
When equipped with proper HBA’s and subsystem device drivers, all new servers can operate with the DS4000 storage device.
VMWare ESX can use the DS4000 storage; however, the virtual machines running in it will not have access to this storage other than via a virtual disk.All other new servers can be used.
第21题:
DS3500 with SAS Host Connection
DS3500 with iSCSI Host Connection
DS3500 with FC Host Connection
DS5020
第22题:
Do the web servers require SMP capability?
Is the web content static or dynamic information?
What is the average CPU utilization of the existing web servers?
Will the servers need a SCSI or Fibre Channel storage solution?
What are the expected growth rates for the web servers?
第23题:
x3650 M3 servers and racks
x3550 M3 servers, VMware and racks
BladeCenter, blades and VMware
x3620 M3 servers and VMware