IBM Grid Toolbox
IBM Capacity on Demand
IBM Cluster Systems Management
IBM Global Solutions Directory
第1题:
A customer needs a solution that provides a total of eight processors (four active and four inactive), 16GB of memory, Advanced POWER Virtualization, and the ability to grow. Which of the followingsystems should the pSeries technical specialist propose?()
第2题:
A bank is interested in technology that will enhance competitiveness and flexibility in the financial trading market by harnessing the typically unused power of idle machines. The pSeries technical specialist should make the customer aware of which IBM offering?()
第3题:
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
第4题:
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()
第5题:
The account executive is asking about post-sales support for a new p5 HMC. They need the pSeries technical specialist to configure an HMC with software support for the customer. Which of the following should the specialist include in the configuration?()
第6题:
Archive the materials in the team’s library.
Act as the sole technical resource for the team.
Summarize the information and make it available to the team.
Evaluate the class and recommend attendance to other team members.
第7题:
Implementing CoD
Using Express Configurations with processor upgrades
Meeting the minimum Value Pak rules
Engaging the pSeries representative to identify appropriate discounts
第8题:
Supportline
ServiceSuite
Software Maintenance Agreement (SWMA)
Machine Control Program Remote Support Agreement (MCPRSA)
第9题:
A DCE domain
A Kerberos domain
A PPP tunnel between the servers
An IPSEC tunnel between the servers
第10题:
IBM Grid Toolbox
IBM Capacity on Demand
IBM Cluster Systems Management
IBM Global Solutions Directory
第11题:
rPerf
ROLTP
SPECfp
SPECint
第12题:
p650
p5-570
Two p630s
p5-570 Express
第13题:
A customer is interested in obtaining an AIX solution from IBM. They have two primary global requirements: ? Availability (although HACMP is not required) ? Low cost Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()
第14题:
A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications. The pSeries technical specialist should recommend purchasing which of the following?()
第15题:
The pSeries technical specialist has been invited to a briefing on the latest POWER technology as a representative of their team. What should the specialist offer to do upon return from class in order to best prepare the rest of the team for the introduction of the new technology?()
第16题:
A customer has two locations that host their pSeries servers. Traffic is being routed through the public Internet. The customer needs to exchange confidential financial data between the servers. Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()
第17题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第18题:
IBM Techline
IBM Supportline
IBM Software Distribution
IBM Hardware Support
第19题:
The technical support specialist has completed a UNIX course at college.
The technical specialist has supported several similar projects and has earned an IBM AIX certification.
The technical support specialist’s company sells $3M of UNIX computer systems every year.
The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
第20题:
Some Express Configurations limit the amount of maximum memory at order time.
The customer must meet minimum system requirements to obtain Express Configuration pricing.
The Express Configurations offer less than the maximum number of processors.
The Express Configurations are only offered through the QuickShip Program.
第21题:
Use eConfig to configure and validate each pSeries and p5 system.
Engage Advanced Technical Support to review any outstanding technical issues.
Confirm with the customer that the solution design meets their requirements.
Perform a Pre-Install Solution Assurance Review to validate required power requirements.
第22题:
p5 hardware, AIX 5.2, Virtual I/O Server
POWER4 hardware, AIX 5.3, Virtual I/O Server,
p5 hardware, AIX 5.3, Advanced POWER Virtualization feature
POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature
第23题:
Design the least-cost solution to prevent the competition from winning the business.
Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.
Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.
Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.
第24题:
The HMC is a 19 form factor.
The HMC is a 24 form factor.
The HMC requires a 100-120 volt power connection.
The HMC requires a 200-240 volt power connection.