p655 4-way nodes
p655 8-way nodes
p5-570 4-way nodes
p5-570 8-way nodes
第1题:
A customer needs a new Microsoft Windows 2003 Server. They are running an application that requires substantial memory. They would like a rack mountable system, which will support four Xeon processors with 2MB of L3 cache. Which of the following is the minimum configuration to satisfy the customer’s requirements?()
第2题:
A customer is putting together a high-performance computing cluster of p655 nodes. They need a total of 48 processors and want to get the best performance possible out of those systems. They are evaluating four options and have asked the pSeries technical specialist to recommend which one would provide the best performance based on total rPerf. Their workload may grow over time. Which of the following should the pSeries technical specialist recommend?()
第3题:
A customer has an HMC-managed Power Systems server with 6 partitions. Four production partitions are subject to varying workloads throughout the day, and two are used for development and testing. The production applications have different licensing limitations on the number of physical cores that may be used. The development partitions can use no more than 1 core. The customer would like to dynamically optimize processor utilization within the licensing limits, with minimal operator intervention. Which of the following meets the customer requirement?()
第4题:
A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds. Which solution satisfies the customer’s recovery time objective()
第5题:
Your company has a Microsoft Hyper-V Server 2008 R2 environment. You manage the environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You plan to install 3 host servers and 15 child partitions in the virtual environment. You will perform child partition placements by using SAN migration. You need to place the appropriate number of child partitions on each logical unit number (LUN) to support SAN migrations. How many child partitions should you place on each LUN?()
第6题:
Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partition maximums to one core. Configure each partition to be capped.
Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partition maximums to one core. Configure each partition to be uncapped.
Define the production partitions' maximum CPU to the licensing limitations. Define the development/test partitions to use no more than one core. Configure the HMC scheduler to dynamically assign processors among the pools over a day.
Create a shared processor pool for each production partition, with the maximum processor limit set to the licensing limit for the application in the pool. Assign the development and testing partitions to a processor pool with a maximum of 1 core. Configure each partition to use uncapped processing.
第7题:
DS8700 systems at each site running Metro Mirror
DS5300 systems at each site running Metro Mirror
DS5100 systems at each site running Global Mirror
XIV systems at each site running synchronous mirroring
第8题:
x445 with four Xeon DP processors and 16GB of memory in a single SMP module
x445 with four Xeon MP processors and 16GB of memory in a single SMP module
x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory
x445 with two SMP modules each containing two Xeon MP processors and 8GB of memory
第9题:
Create a 32-core shared processor pool for the DB2 partitions.
Limit the number of virtual processors on each DB2 partition to 32.
Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.
Set the ‘Desired Processing Units’ in each DB2 partition profile so that the sum of all partitions equals 32.
第10题:
Resources cannot be shared with an i5 partition when it is put on a pSeries. The i5 partition needs its own 9411-100 tower because of IOP. V5R3 OS or later is required. There is a maximum of two partitions in a 590.
Resources cannot be shared between partitions when i5/OS is put on a pSeries. The i5 partition needs its own 9411-100 tower because of IOP. i5/OS can be at V5R2 or a V5R3. Currently only one i5 partition is allowed.
V5R3 is required for the i5 partitions. Virtual IO Server is not supported for the i5/OS partitions to share storage. Up to 10 i5 partitions per processor are allowed (a maximum of two processors for up to 20 partitions).
Processor and memory resources can be shared between AIX 5L, Linux and i5/os partitions. i5/OS needs to be at V5R3, and Virtual IO Server is not supported for the i5/OS partition to share storage. On a 1.65 GHz POWER5 p5 590 there is a maximum of one partition.
第11题:
1
3
5
15
第12题:
x445 with four Xeon MP processors and 8GB of memory
x445 with four Xeon MP processors and 16GB of memory in a single SMP module
x445 with four Xeon DP processors and 16GB of memory in a single SMP module
x445 with two SMP modules each containing two Xeon DP processors and 8GB of memory
第13题:
A system administrator for a business recovery service center needs to test disaster recovery strategies for their clients running Linux. Each client has a different system configuration. Each time a client comes in, the system configuration of the managed system must change. What is the best way to handle this using LPAR?()
第14题:
A customer needs a new database server. The database application has a high memory overhead but does not benefit from 8-way processing. They would like a rack mountable system, which will support four Xeon processors with 512KB of L2 cache and 16GB of main system memory. Which of the following will satisfy the customer’s requirements?()
第15题:
A customer is looking for a reliable well-performing, cost-effective solution to a growing commercial workload. Initially, they want to run 12 UDB partitions, each of which would need two processors and 8GB of memory. They are looking at the p655 and want to start with three LPARS on each p655 node using a total of four nodes. Each LPAR would need at least 4 x 6239 fibre cards and 2 x 5706 2-port 10/100/1000 Ethernet cards. At a later date, they want to add an additional LPAR to each node to expand to a total of 16 UDB partitions. Which of the following major limitations of this solution should be mentioned to the customer?()
第16题:
A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()
第17题:
A shared pool with four capped LPARs
A shared pool with four uncapped LPARs
Four dedicated LPARs and use DLPAR to manage resources effectively
The server in SMP mode and use WLM to manage resources effectively
第18题:
one server having at least two processors
two servers having one processor and one logical database partition
one server having four processors and two logical database partitions
two servers each having four processors and two logical database partitions
第19题:
Twelve 4-way p655 nodes and add more as needed
Six 8-way p655 nodes and add more as needed
Six 4-way p655 nodes with four processors CoD on each node in case of growth
Three 8-way p655 nodes with eight processors CoD on each node in case of growth
第20题:
p655 4-way nodes
p655 8-way nodes
p5-570 4-way nodes
p5-570 8-way nodes
第21题:
Use Windows PE to create the partitions. Install Windows 7 on the first partition.
Use Windows System Image Manager (Windows SIM) to specify the partition configuration.
Use Disk Management to create the two partitions on the hard disk.
Use SysPrep to create the two partitions during Windows Setup.
第22题:
The p655 supports only two LPARs.
The p655 supports only four LPARs.
There are not enough available slots for three LPARs.
There are not enough available slots for four LPARs.
第23题:
Create a system profile. Reconfigure the managed system by activating and deactivating the system profiles.
Create one partition profile for each client. Reconfigure the managed system by activating the partition profiles for that client.
Dynamically move processors and memory as needed into each logical partition. Reconfigure the managed system by activating and deactivating partition profiles.
Dynamically move processors and memory into each logical partition on the server if additional resources are needed. Reconfigure the managed system by activating and deactivating the system profiles.
第24题:
DS8700 systems at each site running Metro Mirror
DS8700 systems at each site running Global Mirror
DS5300 systems at each site running Global Mirror
XIV systems at each site running Remote Mirroring