Maintenance savings due to warranty on new machines
Reliability savings of using one machine versus ten
Financial savings due to cash outlays now versus later
Power savings even if the current power usage is unknown
第1题:
An IBM XIV system with nine modules and 2 TB disks is being proposed to a customer who needs to increase disk capacity in the data center. The customer is concerned about data growth andcost after the initial purchase. Which of the following factors of the solution should be stressed to the customer to address data growth?()
第2题:
A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()
第3题:
A customer is evaluating the purchase of a new p570 8-way Express to replace their current set of ten 2-way database and application servers that are more than five years old. In addition to savings potential in the areas of operating system and database charges, what other significant savings component should be highlighted?()
第4题:
A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path. From the following options, which is the preferred migration path?()
第5题:
The current time zone for one of the user sessions is set to the database local time zone. For one application, the user session requires the time zone to be set to the local operating system time zone without affecting other user sessions. Which two solutions could the user implement to achieve this objective? ()
第6题:
A customer RFP requires installation of an open system SAN and migration of 40 TB currently residing on ten UNIX servers (on internal server disk). The Service Level Agreement (SLA) requires no more than five minutes per week of planned downtime for backup. Which IBM System Storage solution is the most cost effective()
第7题:
Purchase a 4-way p630 to compensate for not using SMT.
Purchase the p5-550 server and install AIX 5.2, which can be upgraded to AIX 5.3 later.
Purchase the p5-550 server and install AIX 5.2 and enable SMT.
Suspend the purchase of a new machine at this time and upgrade the current server to a 4-way server.
第8题:
HACMP/XD and a 4-way p570 in a second location
HACMP/XD and a 8-way p570 in a second location
HACMP/XD and an 8-way p570 in the same location
HACMP and a 4-way p570 in the same location for the critical applications only
第9题:
Disk usage will increase in proportion to memory.
The new database will demand much more memory.
Memory demand will increase 10% for the next year.
Processor demand will increase about 10% for the next year.
第10题:
use the ALTER SYSTEM command to change the time zone
use the ALTER SESSION command to change the time zone
use the ALTER DATABASE command to change the time zone
set the value for the operating system variable ORA_SDTZ on the client machine
set the value for the operating system variable ORA_SDTZ on the database server machine
第11题:
Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.
Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.
Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.
Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.
第12题:
WPARs give more controls for resource management than the traditional AIX operating system tools.
WPARs support Live Application Mobility which can be used to balance user processes acrosssystems.
WPARs each have a copy of the AIX kernel, offering better availability than a system without WPARs.
WPARs provide the ability to apply fixes specific for each environment, enabling the customer to create specialized application servers.
第13题:
A customer has budget sign-off to purchase a new p5-550 2-way server to replace their aging 2-way 7025-6F0. They like the advantages of the Simultaneous Multi Processing (SMT) ability of this server. Their application is certified at AIX 5.2 and is scheduled for AIX 5.3 certification in six months. The Chief Information Officer is concerned that they will lose the budget if they do not purchase the server this fiscal year. What is the most relevant and cost-effective advice the pSeries technical specialist can offer?()
第14题:
A customer needs three 2-way application servers and is evaluating the purchase of three p5-520s versus one partitioned 6-way p5-570. They like the benefits provided with dynamic processor sparing. What information should the pSeries technical specialist emphasize to the customer?()
第15题:
A state agency has recently deployed a new critical application on an 8-way p570. The state government has just mandated that all agencies have disaster recovery plans to recover critical applications in acceptable periods of time with no loss of performance. Which of the following will best address this new requirement()
第16题:
A customer asked a consultant to create the infrastructure for an application. The application is designed to charge customers for conferencing services based on usage. To determine if a Storage Area Network (SAN) is the best storage solution, which of the following questions is most appropriate?()
第17题:
You issued the following command at the UNIX environment: % setenv ORA_SDTZ ’OZ_TZ’ What will be the impact of issuing the above command?()
第18题:
the XIV system can be scaled by the addition of modules
XIV offers thin provisioning for all available host operating systems
reduced operating costs will pay for another XIV system in less than two years
the management GUI allows the administrator tovirtualize the entire storage system quickly
第19题:
Since their capacities and usage models vary, ask the customer to turn off some of the servers during off-peak and low demand time.
Investigate their expansion plans and suggest to the customer the removal of some of their servers to another location and retirement of the older servers.
Contact the CFO to find out the targeted energy savings of the company and propose to the customer the purchase of a more efficient cooling system.
Contact the CIO for a list of servers and type/model numbers. Complete a proposal outlining the savings on energy cost by deploying an IBM BladeCenter solution and total cost of ownership and return on investment.
第20题:
The operating system local time zone will be set for a user session using the operating system environment variable.
The database local time zone will be set for a user session using the operating system environment variable.
The operating system local time zone will be set for the database using the operating system environment
The database local time zone will be set for the database using the operating system environment variable.
第21题:
The p5-570 offers CoD processors.
The p5-570 requires more rack space than the three p5-520s.
Redundant power is standard on the p5-570 and is optional on the p5-520.
Operating system charges will be less expensive with the p5-520 solution.
第22题:
an IBM System Storage DS8700 with LTO tape drive
an IBM System Storage DS8700 with FlashCopy Manager
an IBM XIV Storage System
an IBM XIV Storage System with SAN Volume Controller
第23题:
Will the application require a database?
Which operating system does the application require?
Will the data need to be backed up in real time?
Does the application share data among the servers?
第24题:
Maintenance savings due to warranty on new machines
Reliability savings of using one machine versus ten
Financial savings due to cash outlays now versus later
Power savings even if the current power usage is unknown