No upgrades are needed.
Add another 16-port RAN.
Add an 8-port async adapter.
Add an additional 128-port adapter.
第1题:
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
第2题:
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()
第3题:
A customer’s new rack contains 12 x p655 servers. The customer currently has an HMC with one 128-port async adapter with a rack mounted 16-port RAN. The HMC is already attached to two pSeries p630s. What upgrades, if any, are needed to the HMC to support the new p655 servers?()
第4题:
A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()
第5题:
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()
第6题:
An additional switch for the new HMC
Asynchronous adapters on the new HMC
The two 570 servers are directly connected to the new HMC
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
第7题:
Implement a proxy server to provide multiple sources to one destination
Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two
Purchase a network hub or switch so both p5 570s can connect to the single HMC
Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used
第8题:
Are there at least ten RS-232 ports available on the HMC?
Are there at least ten RS-422 ports available on the HMC?
Are there at least ten RS-232 and two RS-422 ports available on the HMC?
Are there at least two RS-232 and ten RS-422 ports available on the HMC?
第9题:
Have the PDU requirements been met?
Are there sufficient KVM connections?
Is there sufficient service clearance?
Is there sufficient space in the existing rack?
第10题:
No upgrades are needed.
Add another 16-port RAN.
Add an 8-port async adapter.
Add an additional 128-port adapter.
第11题:
Free up one HMC and update the software for use with the p5 570
Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC
Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570
Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
第12题:
An additional switch for the new HMc
Asynchronous adapters on the new HMc
The two 570 servers are directly connected to the new HMc
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc
第13题:
The customer intends to install a 7315-CR2 into a p690 frame. What should the pSeries technical specialist tell the customer?()
第14题:
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()
第15题:
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()
第16题:
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
第17题:
A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()
第18题:
Service Processor
Service Director
Inventory Scout Services
Service Focal Point
第19题:
Purchase a second HMC and use this to manage the new servers.
Connect all of the new servers to the existing private HMC network.
Configure a second private network on their existing HMC for the new servers.
Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
第20题:
Explain to the customer that they need an additional HMC for the POWER5 system.
Obtain a PO from the customer to purchase additional serial connections to the HMC.
Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
第21题:
Order a new HMC to support the p5 system.
Attach the new p5 system to the existing HMC.
Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
Do nothing. This system does not require an HMC.
第22题:
Because additional systems would require more power receptacles
Because the customer may need to do additional facilities planning
Because the customer needs additional funding to cover the services
Because postponing the eventual discussion will likely lead to customer dissatisfaction
第23题:
The HMC is a 19 form factor.
The HMC is a 24 form factor.
The HMC requires a 100-120 volt power connection.
The HMC requires a 200-240 volt power connection.
第24题:
A desk, as it not rack mountable
Ethernet connections to the POWER5 systems
Serial connections to the POWER5 systems
USB connections for the keyboard and mouse