System dimensions and weight, system power and cooling requirements, and list of supported OEM racks
System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racks
System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racks
System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks
第1题:
A customer wants to install a pSeries system into an OEM rack. What critical information is provided in the Site and Hardware Planning Information manual?()
第2题:
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()
第3题:
A customer asks for the thermal load (BTU/hr) to determine whether their existing cooling system will support the IBM System Storage DS8000. Where can the sales representative find this information()
第4题:
A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical specialist provide to the customer?()
第5题:
A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()
第6题:
A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the power cord plug to show to their electrician. Where would the pSeries technical specialist find the required information?()
第7题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第8题:
Configure a 2 node x3950 X5
Customer needs a System p server to support Oracle applications
Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing
Configure a system that meets the minimum requirements
第9题:
Sales Manual
Announcement Letter
Site and Hardware Planning Information
Adapter, Devices, and Cable Information for Multiple Bus Systems
第10题:
vmstat and iostat data from the older machines
The number of CPUs that were installed in the original machines
Data from Workload Estimator (WLE) and IBM Performance Management (PM)
Performance data that is collected from the new system after it has been put into production
第11题:
System dimensions and weight, system power and cooling requirements, and list of supported OEM racks
System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racks
System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racks
System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks
第12题:
vmstat and iostat data from the older machines
The number of CPUs that were installed in the original machines
Data from Workload Estimator (WLE) and IBM Performance Management (PM)
Performance data that is collected from the new system after it has been put into production
第13题:
A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()
第14题:
Where is specific information regarding height, width, depth, and weight of a Power Systems server located?()
第15题:
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
第16题:
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()
第17题:
What information, in addition to model number and serial number, is necessary to perform featureactivation for the IBM System Storage DS8000?()
第18题:
A customer is looking at an Oracle E-Business solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()
第19题:
Select the Server Proven configuration for Oracle E-Business
UseeConfig to configure a Power server with AIX to support Oracle E-Business applications
Download the Oracle E-Business sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing
Use SSCT to configure a system that meets the minimum requirements specified by Oracle E-Business
第20题:
e-Config
System Planning Tool (SPT)
IBM Workload Estimator (WLE)
IBM Performance Monitor (PM)
第21题:
Sales Manual
Announcement Letter
POWER4+ p650 Specification Sheet
Site and Hardware Planning Information Manual
第22题:
Direct the customer to the Installation Guide for each system to identify the power requirements.
Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
第23题:
Use eConfig to configure and validate each pSeries and p5 system.
Engage Advanced Technical Support to review any outstanding technical issues.
Confirm with the customer that the solution design meets their requirements.
Perform a Pre-Install Solution Assurance Review to validate required power requirements.
第24题:
IBM System Storage DS8000: Introduction and Planning Guide
IBM DS8000 Interoperability Matrix on the support page on the web
IBM System Storage DS8000: User’s Guide
IBM System Storage DS8000: Solution Assurance Guide