单选题For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()A The Bulk Power Controllers are dependent upon the HMC to provide them with DHCP addresses.B A fir

题目
单选题
For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()
A

The Bulk Power Controllers are dependent upon the HMC to provide them with DHCP  addresses.

B

A firewall is required to isolate the private network from any of the open networks to which the HMC is attached.

C

Network communications can be implemented through an open network. No private network  is required but it is recommended.

D

All p5 590 and 595 servers are shipped with one service processor card. A private network is  required to manage DHCP addresses.


相似考题
更多“单选题For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()A The Bulk Power Controllers are dependent upon the HMC to provide them with DHCP addresses.B A fire”相关问题
  • 第1题:

    Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()

    • A、An 8-port adapter to the HMC
    • B、A hub for the private network
    • C、An additional Ethernet card to the HMC
    • D、An additional Ethernet card for each partition

    正确答案:B

  • 第2题:

    Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()

    • A、Free up one HMC and update the software for use with the p5 570
    • B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC
    • C、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570
    • D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

    正确答案:A

  • 第3题:

    Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()

    • A、Include a new HMC in the order to connect to the p5 595
    • B、Include a pair of new HMCs in the order to connect to the p5 595
    • C、Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
    • D、Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to  POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities

    正确答案:B

  • 第4题:

    A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()

    • A、Implement a proxy server to provide multiple sources to one destination 
    • B、Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two 
    • C、Purchase a network hub or switch so both p5 570s can connect to the single HMC 
    • D、Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used

    正确答案:C

  • 第5题:

    A client tried to upgrade the system firmware on a p5 590, but it failed. What is the minimum requirement to update the system firmware from the HMC if inventory scout is already installed?()

    • A、A public internet connection
    • B、All of the Logical Partitions need to be active
    • C、One partition must be configured with Service Authority
    • D、A local Repository must be configured prior to the update

    正确答案:C

  • 第6题:

    单选题
    Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()
    A

    Include a new HMC in the order to connect to the p5 595

    B

    Include a pair of new HMCs in the order to connect to the p5 595

    C

    Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities

    D

    Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to  POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities


    正确答案: B
    解析: 暂无解析

  • 第7题:

    单选题
    A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()
    A

    Implement a proxy server to provide multiple sources to one destination 

    B

    Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two 

    C

    Purchase a network hub or switch so both p5 570s can connect to the single HMC 

    D

    Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used


    正确答案: B
    解析: 暂无解析

  • 第8题:

    单选题
    For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()
    A

    The Bulk Power Controllers are dependent upon the HMC to provide them with DHCP  addresses.

    B

    A firewall is required to isolate the private network from any of the open networks to which the HMC is attached.

    C

    Network communications can be implemented through an open network. No private network  is required but it is recommended.

    D

    All p5 590 and 595 servers are shipped with one service processor card. A private network is  required to manage DHCP addresses.


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
    A

    Order a new HMC to support the p5 system.

    B

    Attach the new p5 system to the existing HMC.

    C

    Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.

    D

    Do nothing.  This system does not require an HMC.


    正确答案: C
    解析: 暂无解析

  • 第10题:

    单选题
    A client tried to upgrade the system firmware on a p5 590, but it failed. What is the minimum requirement to update the system firmware from the HMC if inventory scout is already installed?()
    A

    A public internet connection

    B

    All of the Logical Partitions need to be active

    C

    One partition must be configured with Service Authority

    D

    A local Repository must be configured prior to the update


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    Companycom is considering a partitioned solution which will require cumulative rPerf total of 150. The original sizing came back recommending a 32-way p5 590. However, they have a requirement for future scalability and availability is important. Which of the following would be the best reason to recommend a p5 595?()
    A

    The p5 595 would allow for COD

    B

    The p5 595 includes the Advanced Power Virtualization hardware and software

    C

    The p5 595 is priced the same as the p5 590 given the same number/type of CPUs

    D

    The p5 595 performance would be equivalent to the p5 590 given the same number/type of CPUs


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()
    A

    The routes on the HMC

    B

    The firewall setting of the LAN adapter

    C

    The name resolution protocol on the p5 590 server

    D

    The subnet mask settings on the Ethernet adapters


    正确答案: B
    解析: 暂无解析

  • 第13题:

    Companycom is considering a partitioned solution which will require cumulative rPerf total of 150. The original sizing came back recommending a 32-way p5 590. However, they have a requirement for future scalability and availability is important. Which of the following would be the best reason to recommend a p5 595?()

    • A、The p5 595 would allow for COD
    • B、The p5 595 includes the Advanced Power Virtualization hardware and software
    • C、The p5 595 is priced the same as the p5 590 given the same number/type of CPUs
    • D、The p5 595 performance would be equivalent to the p5 590 given the same number/type of CPUs

    正确答案:A

  • 第14题:

    A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()

    • A、The routes on the HMC
    • B、The firewall setting of the LAN adapter
    • C、The name resolution protocol on the p5 590 server
    • D、The subnet mask settings on the Ethernet adapters

    正确答案:B

  • 第15题:

    A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()

    • A、Purchase a second HMC and use this to manage the new servers.
    • B、Connect all of the new servers to the existing private HMC network.
    • C、Configure a second private network on their existing HMC for the new servers.
    • D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

    正确答案:B

  • 第16题:

    A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()

    • A、Order a new HMC to support the p5 system.
    • B、Attach the new p5 system to the existing HMC.
    • C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
    • D、Do nothing.  This system does not require an HMC.

    正确答案:A

  • 第17题:

    Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()

    • A、Enable DHCP server on the HMC
    • B、Configure host name and IP address on DNS server
    • C、Manually set the IP address of the service processor
    • D、Connect a RS-232 cable from the HMC to the service processor

    正确答案:A

  • 第18题:

    单选题
    Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()
    A

    An 8-port adapter to the HMC

    B

    A hub for the private network

    C

    An additional Ethernet card to the HMC

    D

    An additional Ethernet card for each partition


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()
    A

    Purchase a second HMC and use this to manage the new servers.

    B

    Connect all of the new servers to the existing private HMC network.

    C

    Configure a second private network on their existing HMC for the new servers.

    D

    Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()
    A

    The resources must be unallocated in an LPAR

    B

    The microcode on the pSeries must be current

    C

    All network adapters on the LPAR must be defined

    D

    Network connectivity and name resolution capability between HMC and LPARs


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()
    A

    An administrative VLAN with port 1808

    B

    Port 657 which must remain open to TCP/IP and UDP traffic

    C

    Network addresses are provided by DHCP services on the network

    D

    DHCP on the HMC is required to be on to communicate between LPAR and HMC


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()
    A

    Free up one HMC and update the software for use with the p5 570

    B

    Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC

    C

    Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570

    D

    Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()
    A

    Enable DHCP server on the HMC

    B

    Configure host name and IP address on DNS server

    C

    Manually set the IP address of the service processor

    D

    Connect a RS-232 cable from the HMC to the service processor


    正确答案: A
    解析: 暂无解析

  • 第24题:

    单选题
    An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
    A

    An additional switch for the new HMc  

    B

    Asynchronous adapters on the new HMc

    C

    The two 570 servers are directly connected to the new HMc  

    D

    One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc


    正确答案: C
    解析: 暂无解析