单选题Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR

题目
单选题
Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs. What is the best hardware to propose to keep the software cost low?()
A

A 24 way p5 595 with 3 LPARs

B

A 24 way p5 595 with 2 LPARs

C

One p5 570s 16 way and one p5 570 8 way

D

One p5 595 12 way active and 12 way inactive, and one p5 570 8 way


相似考题
更多“单选题Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR”相关问题
  • 第1题:

    The objective of()is to determine what parts of the application software will be assigned to what hardware. The major software components of the system being developed have to be identified and then allocated to the various hardware components on which the system will operate. All software systems can be divided into four basic functions. The first is().Most information systems require data to be stored and retrieved, whether a small file,such as a memo produced by a word processor, or a large database, such as one that stores an organization's accounting records.The second function is the(),the processing required to access data, which often means database queries in Structured Query Language. The third function is the (),which is the logic documented in the DFDs, use cases,and functional requirements.The fourth function is the presentation logic,the display of information to the user and the acceptance of the user's commands.The three primary hardware components of a system are (请作答此空 ).


    A. computers,cables and network
    B.clients,servers,and network
    C. CPUs,memories and I/O devices
    D.CPUs,hard disks and I/O devices

    答案:B
    解析:
    ()的目标是确定应用软件的哪些部分将分配到何种硬件。识别出正在开发系统的主要软件构件并分配到系统将要运行的硬件构件。所有软件系统可分为四项基本功能。第一项是()。大多数信息系统需要数据进行存储并检索,不论是一个小文件,比如一个字处理器产生的一个备忘录,还是一个大型数据库,比如存储一个企业会计记录的数据库。第二项功能是(),处理过程需要访问数据,这通常是指用SQL进行数据库查询。第三项功能是(),这些逻辑通过数据流图,用例和功能需求来记录。第四项功能是表示逻辑,给用户显示信息并接收用户命令。一个系统的三类主要硬件构件是(请作答此空 )。A.计算机、电缆和网络 B.客户机、服务器和网络 C.CPU、存储器和I/O设备 D.CPU、硬盘和I/O设备

  • 第2题:

    Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()

    • A、APV, AIX5.2ML4
    • B、AIX5.3 or i5/OS
    • C、APV, i5/OS, AIX5.3
    • D、APV, AIX5.3 or SuSE9

    正确答案:D

  • 第3题:

    Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()

    • A、One single port Ethernet adapter
    • B、Four dual port Ethernet adapters
    • C、Two single port Ethernet adapters
    • D、Eight single port Ethernet adapters

    正确答案:A

  • 第4题:

    A company wants to run multiple applications on an x445 to serve their user base.  OS and application licensing cost is a factor. Which TWO questions will help the specialist decide on the operating environment and the number of processors per server?()

    • A、What are the applications’ scaling (multi-threading) capabilities?
    • B、How does L3 cache size impact application performance?
    • C、How many servers are running the applications today?
    • D、What is the expected size of the data attached to the server in GB’s?
    • E、Will the applications disable the Hyperthreading on the Xeon processor?

    正确答案:A,C

  • 第5题:

    Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()

    • A、Loadleveler
    • B、AIX Workload Manager
    • C、Partition Load Manager
    • D、Tivoli Provisioning Manager

    正确答案:B

  • 第6题:

    A customer asked a consultant to create the infrastructure for an application.  The application is designed to charge customers for conferencing services based on usage.  To determine if a Storage Area Network (SAN) is the best storage solution, which of the following questions is most appropriate?()

    • A、Will the application require a database?
    • B、Which operating system does the application require?
    • C、Will the data need to be backed up in real time?
    • D、Does the application share data among the servers?

    正确答案:D

  • 第7题:

    All servers on your company’s network run Windows Server 2008 R2. The company is planning to virtualize a memory-intensive server application. You need to recommend CPUs for the virtualization host server. The CPUs must enable memory management enhancements in Microsoft Hyper-V Server 2008 R2. What are two possible CPU recommendations that will achieve this goal?()

    • A、CPUs with AMD Rapid Virtualization Index (AMD RVI)
    • B、CPUs with Intel Extended Page Tables (Intel EPT)
    • C、CPUs with Intel Virtualization Technology (Intel VT)
    • D、CPUs with AMD Virtualization (AMD V)

    正确答案:A,B

  • 第8题:

    单选题
    Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()
    A

    APV, AIX5.2ML4

    B

    AIX5.3 or i5/OS

    C

    APV, i5/OS, AIX5.3

    D

    APV, AIX5.3 or SuSE9


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web server to support the release of a product. The systems architect has recommended that the Web server will require a whole CPU. Which of the following should the technical specialist suggest to provide the most cost-effective deployment?()
    A

    Remove one application server partition and apply its CPU resources to the Web server.

    B

    Reassign the CPU from one of the VIO servers and create the new partition.

    C

    Add 0.6 CPU to one of the application servers and run the Web service with the application. 

    D

    Reassign a total of 0.4 CPUs from the application servers and create a new partition with awhole CPU for new deployment.


    正确答案: D
    解析: 暂无解析

  • 第10题:

    单选题
    Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()
    A

    Loadleveler

    B

    AIX Workload Manager

    C

    Partition Load Manager

    D

    Tivoli Provisioning Manager


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs. What is the best hardware to propose to keep the software cost low?()
    A

    A 24 way p5 595 with 3 LPARs

    B

    A 24 way p5 595 with 2 LPARs

    C

    One p5 570s 16 way and one p5 570 8 way

    D

    One p5 595 12 way active and 12 way inactive, and one p5 570 8 way


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    Companycom is planning to do server consolidation on POWER5. The customer has a test environment, a QA environment and a production environment for two applications. Both the test and QA environments are very small and are only utilized when new releases are being developed and tested. They require less than 1 CPU each. Both production applications require 2 CPUs for day-to-day operation and can require up to an additional 2 CPUs each during abrupt peak requirements. What is the best design for the LPARs?()
    A

    Use micropartitioning for test and QA environments, and DLPAR for the production applications  

    B

    Use micropartitioning for test and QA environment, and CPU pooling for the production applications 

    C

    Create standard LPARs for all test, QA, and production applications to keep all partitions separate and isolated. 

    D

    Create DLPAR partitions for all test, QA, and production applications to keep test from disturbing production environment. 


    正确答案: B
    解析: 暂无解析

  • 第13题:

    All servers on your companys network run Windows Server 2008 R2. The company is planning to virtualize a memory-intensive server application. You need to recommend CPUs for the virtualization host server. The CPUs must enable memory management enhancements in Microsoft Hyper-V Server 2008 R2.  What are two possible CPU recommendations that will achieve this goal?()

    • A、CPUs with AMD Virtualization (AMD V)
    • B、CPUs with AMD Rapid Virtualization Index (AMD RVI)
    • C、CPUs with Intel Extended Page Tables (Intel EPT)
    • D、CPUs with Intel Virtualization Technology (Intel VT)

    正确答案:B,C

  • 第14题:

    Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs. What is the best hardware to propose to keep the software cost low?()

    • A、A 24 way p5 595 with 3 LPARs
    • B、A 24 way p5 595 with 2 LPARs
    • C、One p5 570s 16 way and one p5 570 8 way
    • D、One p5 595 12 way active and 12 way inactive, and one p5 570 8 way

    正确答案:C

  • 第15题:

    A customer is considering replacement of twenty older 4U and 6U rack-based servers with one IBM x366 Server running VMWare ESX attached to one DS4300.  Which of the following represents a reduction in Total Cost of Ownership (TCO) for the customer?()

    • A、Reduction in operating system software licensing and application costs
    • B、Reduction in floor space and hardware cost saving
    • C、VMWare is licensed per system so no extra charge for SMP support
    • D、No single point of failure, reducing downtime

    正确答案:B

  • 第16题:

    ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web server to support the release of a product. The systems architect has recommended that the Web server will require a whole CPU. Which of the following should the technical specialist suggest to provide the most cost-effective deployment?()

    • A、Remove one application server partition and apply its CPU resources to the Web server.
    • B、Reassign the CPU from one of the VIO servers and create the new partition.
    • C、Add 0.6 CPU to one of the application servers and run the Web service with the application. 
    • D、Reassign a total of 0.4 CPUs from the application servers and create a new partition with awhole CPU for new deployment.

    正确答案:D

  • 第17题:

    A user has an application server LPAR with a physical Ethernet adapter. They want to have a database LPAR also connected to the application LPAR via virtual Ethernet. Their security policies require a firewall between the application LPAR and database LPAR. Which of the following virtual Ethernet configurations satisfies the customer’s requirements?()

    • A、The application server,firewall,and database server on the same VLAN
    • B、The application server and firewall on one VLAN,and the database server on a second VLAN
    • C、The application server on one VLAN,and the database server and firewall on a second VLAN
    • D、The application server and firewall on one VLAN,and the firewall and database server on a second VLAN

    正确答案:D

  • 第18题:

    You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). Server1hosts an ordering application that connects to a database cluster.A number of client computers are shared between employees. You need to implement a licensing solution that meets the following requirements:·Server1 must allow unlimited concurrent connections.·Client access license requirements must be minimized.Which two actions should you perform? ()(Each correct answer presents part of the solution. Choose two.)

    • A、Configure a license group for each shared computer.
    • B、Configure a local security group for each shared computer.
    • C、Configure Server1 to support Per Server licensing mode.
    • D、Configure Server1 to support either Per Device or Per User licensing mode.

    正确答案:A,D

  • 第19题:

    单选题
    An administrator analyzes a poorly performing system and suspects that the issue is related to CPU resource. Upon reviewing output of vmstat, the administrator is concerned with the values in the ‘pc’ and ‘ec’ columns. Which definition describes these two headings?()
    A

    'pc' refers to the number of physical processors consumed, while 'ec' refers to the percentage of entitled capacity consumed.

    B

    'pc' refers to the 'physical CPUs' and lists how many are left un-allocated, while ec' refers to the 'entitled CPUs' and lists what amount is currently allocated to the LPAR.

    C

    'pc' refers to the 'processor count' and reflects how many CPUs are allocated to the LPAR, while 'ec ' refers to the 'extra capacity' and lists how much above the LPAR entitlement is being consumed.

    D

    'pc' refers to 'processor cards' and reflects how many MCM modules are actually being used by this LPAR, while 'ec' refers to the 'entitled CPUs'and lists what amount is currently allocated to the LPAR.


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()
    A

    One single port Ethernet adapter

    B

    Four dual port Ethernet adapters

    C

    Two single port Ethernet adapters

    D

    Eight single port Ethernet adapters


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    A user has an application server LPAR with a physical Ethernet adapter. They want to have a database LPAR also connected to the application LPAR via virtual Ethernet. Their security policies require a firewall between the application LPAR and database LPAR. Which of the following virtual Ethernet configurations satisfies the customer’s requirements?()
    A

    The application server,firewall,and database server on the same VLAN

    B

    The application server and firewall on one VLAN,and the database server on a second VLAN

    C

    The application server on one VLAN,and the database server and firewall on a second VLAN

    D

    The application server and firewall on one VLAN,and the firewall and database server on a second VLAN


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()
    A

    Assign the adapter to an IO Hosting partition

    B

    Use AIX 5L affinity to move the application from SUSE to AIX

    C

    Use AIX 5.3 drivers to install the adapter in the Linux LPAR

    D

    Assign the adapter to an AIX 5.3 partition running Linux Affinity


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A customer is considering replacement of twenty older 4U and 6U rack-based servers with one IBM x366 Server running VMWare ESX attached to one DS4300.  Which of the following represents a reduction in Total Cost of Ownership (TCO) for the customer?()
    A

    Reduction in operating system software licensing and application costs

    B

    Reduction in floor space and hardware cost saving

    C

    VMWare is licensed per system so no extra charge for SMP support

    D

    No single point of failure, reducing downtime


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    A customer asked a consultant to create the infrastructure for an application.  The application is designed to charge customers for conferencing services based on usage.  To determine if a Storage Area Network (SAN) is the best storage solution, which of the following questions is most appropriate?()
    A

    Will the application require a database?

    B

    Which operating system does the application require?

    C

    Will the data need to be backed up in real time?

    D

    Does the application share data among the servers?


    正确答案: C
    解析: 暂无解析