单选题When booting the p5 590 server in full system partition mode, which location is preferred for the fastest boot?()A A SAN deviceB First I/O drawerC Any I/O drawer within the main frameD First I/O drawer within the expansion frame

题目
单选题
When booting the p5 590 server in full system partition mode, which location is preferred for the fastest boot?()
A

A SAN device

B

First I/O drawer

C

Any I/O drawer within the main frame

D

First I/O drawer within the expansion frame


相似考题

1. Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()A、When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. B、V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. C、When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions.  D、V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.

参考答案和解析
正确答案: A
解析: 暂无解析
更多“单选题When booting the p5 590 server in full system partition mode, which location is preferred for the fastest boot?()A A SAN deviceB First I/O drawerC Any I/O drawer within the main frameD First I/O drawer within the expansion frame”相关问题
  • 第1题:

    A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()

    • A、Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs
    • B、Move the existing physical network and storage adapters to the new system and virtualize the I/O using a  single VIO Server.
    • C、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC  connectors and dual HBAs.
    • D、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC  connectors and the other with dual HBAs.

    正确答案:C

  • 第2题:

    Which of the following phrases is TRUE regarding monitoring disk I/O with iostat?()

    • A、 The iostat can only be run as the root user
    • B、 There could be zero percent I/O wait and still be an I/O bottleneck
    • C、 Any I/O wait time displayed in output of "iostat" is an indication of severe I/O bottlenecks 
    • D、 Running "iostat" without any arguments/parameters is sufficient for resolving I/O bottlenecks

    正确答案:B

  • 第3题:

    A specialist is monitoring performance on a server. The data is on another partition within the same array as the OS. The following information is available:       (1)The average record written to disk is 16KB       (2)The I/O block size is 2KB   (3)The stripe size on the RAID array is 16KB  Which of the following will improve performance without rebuilding the operating system?()

    • A、Change the I/O block size to match the RAID Stripe size.
    • B、Change the RAID stripe size to match the I/O block size.
    • C、Change the record size of the database to match the RAID stripe size.
    • D、Change the record size of the database to match the I/O transfer rate.

    正确答案:A

  • 第4题:

    A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()

    • A、Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.
    • B、Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.
    • C、Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.
    • D、Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer  loops.

    正确答案:D

  • 第5题:

    Which of the following steps should be done FIRST when deploying a Virtual I/O server on a p5-550, which will host three logical partitions: a NIM server and two application servers?()

    • A、Create and install the NIM server
    • B、Create and install the Virtual I/O Server
    • C、Create and install the application servers
    • D、Activate Advanced POWER Virtualization

    正确答案:D

  • 第6题:

    单选题
    Company.com is adding a new I/O drawer to an existing p5-570 with four LPARs and wants to re-balance the network cards in the I/O drawers. What is the best way to accomplish this?()
    A

    Add the devices as virtual adapters to a VIO server first,then add the I/O drawer and create the shared ethernet adapters

    B

    Power down the partitions,run the diag a command when the system is brought back up and reconfigure the network cards

    C

    Use the rmdev command to remove the devices,shut down the partitions and move the cads,then run the cfgmgr command after reboot

    D

    Detach the network cards,run rmdev on the devices and then dynamically reassign theadapters to the partitions and reconfigure


    正确答案: B
    解析: 暂无解析

  • 第7题:

    单选题
    Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()
    A

    When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. 

    B

    V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. 

    C

    When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions.  

    D

    V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition. They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()
    A

    A second IVE adapter

    B

    A second processor card

    C

    PowerVM Enterprise Edition

    D

    An additional cable-management arm


    正确答案: B
    解析: 暂无解析

  • 第9题:

    单选题
    A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()
    A

    Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.

    B

    Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.

    C

    Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.

    D

    Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    Which of the following phrases is TRUE regarding monitoring disk I/O with iostat?()
    A

     The iostat can only be run as the root user

    B

     There could be zero percent I/O wait and still be an I/O bottleneck

    C

     Any I/O wait time displayed in output of iostat is an indication of severe I/O bottlenecks 

    D

     Running iostat without any arguments/parameters is sufficient for resolving I/O bottlenecks


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()
    A

    Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAs

    B

    Move the existing physical network and storage adapters to the new system and virtualize the I/O using a  single VIO Server.

    C

    Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC  connectors and dual HBAs.

    D

    Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC  connectors and the other with dual HBAs.


    正确答案: A
    解析: 暂无解析

  • 第12题:

    单选题
    A specialist is monitoring performance on a server. The data is on another partition within the same array as the OS. The following information is available:       (1)The average record written to disk is 16KB       (2)The I/O block size is 2KB   (3)The stripe size on the RAID array is 16KB  Which of the following will improve performance without rebuilding the operating system?()
    A

    Change the I/O block size to match the RAID Stripe size.

    B

    Change the RAID stripe size to match the I/O block size.

    C

    Change the record size of the database to match the RAID stripe size.

    D

    Change the record size of the database to match the I/O transfer rate.


    正确答案: A
    解析: 暂无解析

  • 第13题:

    When booting the p5 590 server in full system partition mode, which location is preferred for the fastest boot?()

    • A、A SAN device
    • B、First I/O drawer
    • C、Any I/O drawer within the main frame
    • D、First I/O drawer within the expansion frame

    正确答案:B

  • 第14题:

    A customer wants to purchase an IBM System Storage DS8700 to support a high-performance database environment.  Which technical solution gives the customer the best relationship between I/O performance at the machine’s backend vs. capacity installed in the machine()

    • A、additional installation of the first and second expansion frame will increase the backend performance capability
    • B、the usage of 300 GB/15k FC disks will give the server a high-performance backend capability
    • C、performance Accelerator restricts the number of disks connected to one device adapter pair to 32 disks
    • D、the second RIO-G loop between the base frame and the first expansion increases the backend performance

    正确答案:C

  • 第15题:

    A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached; One 4-port 1Gbps IVE adapterPowerVM Standard Edition; They need to add a GX++ adapter and cable it to an I/O drawer. Which of the following must also be ordered?()

    • A、A second IVE adapter
    • B、A second processor card
    • C、PowerVM Enterprise Edition
    • D、An additional cable-management arm

    正确答案:B

  • 第16题:

    A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()

    • A、I/O Planning Guide
    • B、Power Systems data sheet
    • C、Power Systems Facts and Features
    • D、Run FLRT to recommend I/O features

    正确答案:C

  • 第17题:

    Company.com is adding a new I/O drawer to an existing p5-570 with four LPARs and wants to re-balance the network cards in the I/O drawers. What is the best way to accomplish this?()

    • A、Add the devices as virtual adapters to a VIO server first,then add the I/O drawer and create the shared ethernet adapters
    • B、Power down the partitions,run the diag a command when the system is brought back up and reconfigure the network cards
    • C、Use the rmdev command to remove the devices,shut down the partitions and move the cads,then run the cfgmgr command after reboot
    • D、Detach the network cards,run rmdev on the devices and then dynamically reassign theadapters to the partitions and reconfigure

    正确答案:D

  • 第18题:

    单选题
    A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()
    A

    I/O Planning Guide

    B

    Power Systems data sheet

    C

    Power Systems Facts and Features

    D

    Run FLRT to recommend I/O features


    正确答案: C
    解析: 暂无解析

  • 第19题:

    单选题
    An  administrator  has  a  server  experiencing  performance  problems  with  logical  volumes  within  a particular volume group.  Which command can report I/O statistics for logical partitions with each logicalvolume within the volume group()
    A

    Islv

    B

    vmstat

    C

    iostat

    D

    Ivmstat


    正确答案: A
    解析: 暂无解析

  • 第20题:

    单选题
    Which of the following would be the FIRST step to configure a Virtual I/O Server(VIOS)?()
    A

    Boot the HMC with the VIOS media.

    B

    Assign SAN-attached disks to the database partitions.

    C

    Create logical volumes for the VIOS on rootvg disks.

    D

    Identify the location of the internal SCSI disks for the VIOS.


    正确答案: A
    解析: 暂无解析

  • 第21题:

    单选题
    A system administrator has a server experiencing performance problems with logical volumes within a particular volume group. Which command can report I/O statistics for logical partitions with each logical volume within the volume group?()
    A

    lslv

    B

    lsvg

    C

    iostat

    D

    lvmstat


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    Which of the following steps should be done FIRST when deploying a Virtual I/O server on a p5-550, which will host three logical partitions: a NIM server and two application servers?()
    A

    Create and install the NIM server

    B

    Create and install the Virtual I/O Server

    C

    Create and install the application servers

    D

    Activate Advanced POWER Virtualization


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A customer wants to purchase an IBM System Storage DS8700 to support a high-performance database environment.  Which technical solution gives the customer the best relationship between I/O performance at the machine’s backend vs. capacity installed in the machine()
    A

    additional installation of the first and second expansion frame will increase the backend performance capability

    B

    the usage of 300 GB/15k FC disks will give the server a high-performance backend capability

    C

    performance Accelerator restricts the number of disks connected to one device adapter pair to 32 disks

    D

    the second RIO-G loop between the base frame and the first expansion increases the backend performance


    正确答案: C
    解析: 暂无解析