Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
第1题:
Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()
第2题:
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
第3题:
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()
第4题:
Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()
第5题:
A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()
第6题:
Change passwords in ASMI
Add the managed system to the HMC
Connect the p5-520 to a power source
Connect the HMC and the p5-520 server’s HMC1 port to the same network
第7题:
The Hardware Management Console (HMC) and Integrated Virtualization Manager (IVM).
The Hardware Management Console (HMC) and Advanced System Manager Interface (ASMI).
Integrated Virtualization Manager (IVM) and Advanced System Manager Interface (ASMI).
Integrated Virtualization Manager (IVM) and BladeCenter Advanced Management Module (AMM).
第8题:
Purchase a second HMC and use this to manage the new servers.
Connect all of the new servers to the existing private HMC network.
Configure a second private network on their existing HMC for the new servers.
Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
第9题:
To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.
Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.
Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the
Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from
第10题:
Explain to the customer that they need an additional HMC for the POWER5 system.
Obtain a PO from the customer to purchase additional serial connections to the HMC.
Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
第11题:
It has a GUI interface for upgrading system firmware.
It creates and manages AIX/Linux and VIOS type LPARs.
It can be managed by the Hardware Management Console (HMC).
It supports Live Partition Mobility on POWER6 systems and above.
第12题:
ITSO Redbooks
Facts and Features
System Planning Tool
Fix Level Recommendation Tool
第13题:
Prior to implementing an LPAR system, which of the following needs to be done?()
第14题:
Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()
第15题:
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()
第16题:
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()
第17题:
Which of the following should be done FIRST when setting up a new p5-520 to be managed by a new HMC via a private network?()
第18题:
A graphics monitor must be attached to the server
Cluster System Management (CSM) software must be installed
The LPAR system must have an Hardware Management Console (HMC) connected
Each LPAR must be configured with a CDROM for operating system installation
第19题:
Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line.
The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed.
If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run.
The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot.
第20题:
All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or later
The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMC
They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing one
The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM
第21题:
vmstat and iostat data from the older machines
The number of CPUs that were installed in the original machines
Data from Workload Estimator (WLE) and IBM Performance Management (PM)
Performance data that is collected from the new system after it has been put into production
第22题:
Order a new HMC to support the p5 system.
Attach the new p5 system to the existing HMC.
Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
Do nothing. This system does not require an HMC.
第23题:
lssysres -r cpu -m 9117-MMA*6512345 -r sys
lssyscfg -r proc -m 9117-MMA*6512345 -r sys
lshwres -r proc -m 9117-MMA*6512345 --level sys
lshwcfg -r proc -m 9117-MMA*6512345 --level sys
第24题:
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.