lssysres -r cpu -m 9117-MMA*6512345 -r sys
lssyscfg -r proc -m 9117-MMA*6512345 -r sys
lshwres -r proc -m 9117-MMA*6512345 --level sys
lshwcfg -r proc -m 9117-MMA*6512345 --level sys
第1题:
A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy. Which of the following statements correctlydescribes the dual HMC environment? ()
第2题:
An administrator wants to query the CPU resources of the managed system 9117-MMA*6512345 from the Hardware Management Console (HMC) command line. Which of the following HMC commands could achieve this?()
第3题:
Prior to implementing an LPAR system, which of the following needs to be done?()
第4题:
Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()
第5题:
Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()
第6题:
Company.com would like to have the processor resources on their system efficiently shared between logical partitions, but does not require management of memory or I/O resources. Which of the following would accomplish this requirement?()
第7题:
Run /usr/sbin/rsct/bin/rmcctrl z as hscroot.
Reboot the HMC, either through the GUI or via the command line.
Disable and re-enable RMC in the Firewall settings in the HMC GUI.
Select the Partition Communication checkbox in the LAN Adapter dialogue box.
第8题:
Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line.
The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed.
If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run.
The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot.
第9题:
Workload Partitions Manager for AIX
Hardware Management Console (HMC) GUI
Integrated Virtualization Manager (IVM)
Advanced System Management Interface (ASMI)
第10题:
It has a GUI interface for upgrading system firmware.
It creates and manages AIX/Linux and VIOS type LPARs.
It can be managed by the Hardware Management Console (HMC).
It supports Live Partition Mobility on POWER6 systems and above.
第11题:
2
3
4
8
第12题:
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
第13题:
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
第14题:
Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()
第15题:
On a Hardware Management Console (HMC) at version 7, an administrator has an LPAR defined with a minimum of 0.1 processors and a maximum of 4 processors. The administrator wants to go from 1 processing unit to 3 processing units for this partition. In order to make the change, what value should the administrator enter into the add processor resources window? ()
第16题:
Which of the following interfaces is required to implement Workload Partition Mobility? ()
第17题:
A system administrator wants to control the HMC from their workstation. Microsoft Windows 2000 is running and the HMC graphical user interface is being used remotely. Which of the following actions will accomplish this task?()
第18题:
A graphics monitor must be attached to the server
Cluster System Management (CSM) software must be installed
The LPAR system must have an Hardware Management Console (HMC) connected
Each LPAR must be configured with a CDROM for operating system installation
第19题:
The Hardware Management Console (HMC) and Integrated Virtualization Manager (IVM).
The Hardware Management Console (HMC) and Advanced System Manager Interface (ASMI).
Integrated Virtualization Manager (IVM) and Advanced System Manager Interface (ASMI).
Integrated Virtualization Manager (IVM) and BladeCenter Advanced Management Module (AMM).
第20题:
To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.
Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.
Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on the
Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from
第21题:
mksysb -t vio /mountpoint
backupios -file /mountpoint
mksysb -i /mountpoint/vio.mksysb
backupios -mksysb -file /mountpoint/vio.mksysb
第22题:
lssysres -r cpu -m 9117-MMA*6512345 -r sys
lssyscfg -r proc -m 9117-MMA*6512345 -r sys
lshwres -r proc -m 9117-MMA*6512345 --level sys
lshwcfg -r proc -m 9117-MMA*6512345 --level sys
第23题:
2
3
1.0
2.9
第24题:
Use any Windows 2000 to graphically access the HMC
Load, install, and configure WebSM on the workstation
Telnet to the HMC using Exceed or a GUI emulator product from the workstation
Load, install, and configure OpenSSH or SSH on the workstation and access the HMC through the GUI interface