单选题What will happen to associated preventive maintenance (PM) records when an asset is decommissioned?()A There is no automatic method to change the PM(s) status to INACTIVEB The PM(s) will become in INACTIVE if 'Change the Status of All Associated PM(s) 

题目
单选题
What will happen to associated preventive maintenance (PM) records when an asset is decommissioned?()
A

There is no automatic method to change the PM(s) status to INACTIVE

B

The PM(s) will become in INACTIVE if 'Change the Status of All Associated PM(s) to Inactive?' is checked while decommissioning the asset

C

The only way to change the status of the PM(s) to INACTIVE is to remove the assets from the PM(s) and then change the status of the PM(s) to INACTIVE

D

If the 'Change the Status of All Associated PM(s) to Inactive?' is not selected during decommissioning, the PM(s) status will remain ACTIVE; however, work order cannot be generated from the PM having a decommissioned asset


相似考题
更多“单选题What will happen to associated preventive maintenance (PM) records when an asset is decommissioned?()A There is no automatic method to change the PM(s) status to INACTIVEB The PM(s) will become in INACTIVE if 'Change the Status of All Associated PM(s) ”相关问题
  • 第1题:

    Whatwillhappentoassociatedpreventivemaintenance(PM)recordswhenanassetisdecommissioned?()

    A.ThereisnoautomaticmethodtochangethePM(s)statustoINACTIVE

    B.ThePM(s)willbecomeinINACTIVEif‘ChangetheStatusofAllAssociatedPM(s)toInactive?‘ischeckedwhiledecommissioningtheasset

    C.TheonlywaytochangethestatusofthePM(s)toINACTIVEistoremovetheassetsfromthePM(s)andthenchangethestatusofthePM(s)toINACTIVE

    D.Ifthe‘ChangetheStatusofAllAssociatedPM(s)toInactive?‘isnotselectedduringdecommissioning,thePM(s)statuswillremainACTIVE;however,workordercannotbegeneratedfromthePMhavingadecommissionedasset


    参考答案:B

  • 第2题:

    (2019年)某建设项目排放SO 2、NO X、VOC S分别为120、430、1700吨/年,则预测因子为( )。

    A.SO 2、NO 2、PM 10、O 3
    B.NO 2、PM 10、PM 2.5、O 3
    C.SO 2、NO 2、PM 10、PM 2.5
    D.SO 2、NO 2、PM 2.5、O 3

    答案:C
    解析:
    《环境影响评价技术导则大气环境(HJ2.2-2018)》5.1.3表1。该题题干为建设项目,且SO 2+NOx≥500吨/年,故二次预测因子为PM 2.5。,无O 3。

  • 第3题:

    飘尘是指()

    • A、PM10
    • B、PM2.5
    • C、PM0.1
    • D、总悬浮颗粒
    • E、PM100

    正确答案:A

  • 第4题:

    Hello! Can I get a seat on the 8 pm flight Detroit?()

    • A、Hello! International Airline.
    • B、You‘d better look up the schedule first.
    • C、I‘m sorry, but it‘s completely booked.
    • D、I‘m afraid you have to change.

    正确答案:C

  • 第5题:

    You execute the following command to change the status of the SALES tablespace:  SQL> ALTER TABLESPACE sales OFFLINE;  Which statements describe the effect of the command()

    • A、The tablespace would require recovery to go back online.
    • B、A checkpoint is taken on all data files that are associated with the SALES tablespace.
    • C、The sessions that subsequently try to access the objects in the SALES tablespace receive an error.
    • D、The new status of the SALES tablespace is recorded in the control file when the database instance is closed.

    正确答案:B,C

  • 第6题:

    以下哪种颗粒是到达肺泡的临界值()

    • A、PM5
    • B、PM10
    • C、PM50
    • D、PM100

    正确答案:A

  • 第7题:

    启动井口控制盘气动液压泵时()

    • A、先启动PM1-1、PM3-1、PM2-1,当压力升高后,再关停PM3-1、PM2-1
    • B、先启动PM1-1,当压力升高后,再启动PM3-1、PM2-1进一步提高系统压力
    • C、PM3-1、PM2-1和PM1-1一起启动
    • D、先启动PM3-1、PM2-1,当压力升高后,再启动PM1-1进一步提高系统压力

    正确答案:D

  • 第8题:

    What will happen to associated preventive maintenance (PM) records when an asset is decommissioned?()

    • A、There is no automatic method to change the PM(s) status to INACTIVE
    • B、The PM(s) will become in INACTIVE if 'Change the Status of All Associated PM(s) to Inactive?' is checked while decommissioning the asset
    • C、The only way to change the status of the PM(s) to INACTIVE is to remove the assets from the PM(s) and then change the status of the PM(s) to INACTIVE
    • D、If the 'Change the Status of All Associated PM(s) to Inactive?' is not selected during decommissioning, the PM(s) status will remain ACTIVE; however, work order cannot be generated from the PM having a decommissioned asset

    正确答案:B

  • 第9题:

    Your database instance is functional for the past one month. The Automatic Workload Repository(AWR) snapshot retention is set to 7 and the STATISTICS_LEVEL initialization parameter is set to TYPICAL.  You receive a complaint about the poor performance of the database between 7 PM and 9 PM of theprevious day.  Choose two actions any of which can be referred to first to diagnose the problem. ()

    • A、Use the Active Session History report.
    • B、Use the AWR Compare Periods report.
    • C、Use an ADDM analysis between 7 PM and 9 PM of the previous day.
    • D、Use the AWR Compare Period report between 7 PM and 9 PM of the previous day.

    正确答案:B,C

  • 第10题:

    单选题
    Based on the configuration shown in the exhibit, what will happen to the traffic matching the security policy?()
    A

    The traffic is permitted through the myTunnel IPSec tunnel only on Tuesdays.

    B

    The traffic is permitted through the myTunnel IPSec tunnel daily, with the exception of Mondays.

    C

    The traffic is permitted through the myTunnel IPSec tunnel all day on Mondays, Wednesdays between 7:00 am and 6:00 pm, and Thursdays between 7:00 am and 6:00 pm.

    D

    The traffic is permitted through the myTunnel IPSec tunnel all day on Mondays, Wednesdays between 6:01 pm and 6:59 am, and Thursdays between 6:01 pm and 6:59 am.


    正确答案: D
    解析: 暂无解析

  • 第11题:

    单选题
    When discussing plant maintenance with plant maintenance managers, frequently the topic of using preventive maintenance (PM) comes up. If this is used extensively and the PM work orders are regularly completed, what is told by this about the operation?()
    A

    It is likely that equipment will break down frequently.

    B

    It is likely that equipment will break down infrequently.

    C

    It shows that maintenance is performed on an as needed basis.

    D

    It shows that there are frequent crises when it comes to maintaining equipment.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    Hello! Can I get a seat on the 8 pm flight Detroit?()
    A

    Hello! International Airline.

    B

    You‘d better look up the schedule first.

    C

    I‘m sorry, but it‘s completely booked.

    D

    I‘m afraid you have to change.


    正确答案: B
    解析: 暂无解析

  • 第13题:

    某建设项目排放S0210t、NOx 350t、V0Cs1700t,问本项目需要预测的污染物有:

    A:SO,、NOx、PM.s、03
    B:S0、NOx.PM1、03
    C:S0、NOx、PM.s、PM。
    D:S02、NOx、03

    答案:C
    解析:
    本题可利用排除法,带O。的都不选,只能选C中PM。oS0.氧化后
    生成三氧化硫,三氧化硫吸水后会有硫酸雾滴,用PM。表征根据大气导则中的表格需要记忆。

  • 第14题:

    现用C mol/L的EDTA滴定同浓度的钙,Ca2+无副反应。已知此时滴定的突跃范围为ΔpM。若EDTA和钙的浓度均增加10倍,则此时滴定的突跃范围大小为()

    • A、ΔpM`=ΔpM-2
    • B、ΔpM`=ΔpM+1
    • C、ΔpM`=ΔpM-1
    • D、ΔpM`=ΔpM+2

    正确答案:B

  • 第15题:

    PM800&PM700如何替换PM500?


    正确答案: PM800&PM700系列为新型电力参数测量仪,除具有PM500的全部功能外,还具有:
    通讯接口为标准配置,1DI、1DO为标准配置,更多的IO模块,最多可配置18个IO,DI输入不需要外部24VDC供电,报警设定等优点.
    PM500>PM700:无通讯功能的PM表
    功能相同,但PM700的价格低于PM500)
    PM500+RS485>PM710:带通讯功能的PM表
    功能相同,但PM710的价格低于PM500+RS485
    或>PM810:带通讯功能的PM表PM810的价格与PM500+RS485相同,但功能更强
    PM500+RS485+IO22>PM810+PM8M22:带通讯和IO功能的PM表PM810+PM8M22的价格与PM500+RS485+IO22相同,但功能更强.

  • 第16题:

    Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()

    • A、 elapsed time since the target start date or completion date of previous work generated by PM  
    • B、 difference between completion date of previous work and system date is equal to Lead Time  
    • C、 elapsed time since the target start date or completion date of the latest work orders for the asset
    • D、 metered equipment usage since the target start date or completion date of previous work generated by PM
    • E、 metered equipment usage since the target start date or completion date of the latest work order for the asset

    正确答案:A,D

  • 第17题:

    已知下列离子半径:Tl+(140pm)、Ag+(126pm)、Zn2+(74pm)、Cl-(181pm)、S2-(184pm),则在下列物质中属于CsCl型离子晶体的是()。

    • A、AgCl
    • B、Ag2S
    • C、TlCl
    • D、ZnCl2

    正确答案:C

  • 第18题:

    雾霾天在什么情况下要带口罩()

    • A、PM2.5>100
    • B、PM2.5>200
    • C、PM2.5>300
    • D、PM2.5>400

    正确答案:A

  • 第19题:

    下列PM计数命令()是错误的。

    • A、#ONT/traffic/voip>show pm rtp
    • B、#ONT/traffic/voip>show pm callcontrol
    • C、#ONT/traffic/pon>show pm gem all
    • D、#ONT/traffic/eth>show pm igmp

    正确答案:D

  • 第20题:

    When discussing plant maintenance with plant maintenance managers, frequently the topic of using preventive maintenance (PM) comes up. If this is used extensively and the PM work orders are regularly completed, what is told by this about the operation?()

    • A、It is likely that equipment will break down frequently.
    • B、It is likely that equipment will break down infrequently.
    • C、It shows that maintenance is performed on an as needed basis.
    • D、It shows that there are frequent crises when it comes to maintaining equipment.

    正确答案:B

  • 第21题:

    You execute the following command to change the status of the SALES tablespace:SQL> ALTER TABLESPACE sales OFFLINE; Which statements describe the effect of the command()

    • A、The tablespace would require recovery to go back online.
    • B、A checkpoint is taken on all data files that are associated with the SALES tablespace.
    • C、The sessions that subsequently try to access the objects in the SALES tablespace receive an error
    • D、The new status of the SALES tablespace is recorded in the control file when the database instance isclosed

    正确答案:B,C

  • 第22题:

    单选题
    What will happen to associated preventive maintenance (PM) records when an asset is decommissioned?()
    A

    There is no automatic method to change the PM(s) status to INACTIVE

    B

    The PM(s) will become in INACTIVE if 'Change the Status of All Associated PM(s) to Inactive?' is checked while decommissioning the asset

    C

    The only way to change the status of the PM(s) to INACTIVE is to remove the assets from the PM(s) and then change the status of the PM(s) to INACTIVE

    D

    If the 'Change the Status of All Associated PM(s) to Inactive?' is not selected during decommissioning, the PM(s) status will remain ACTIVE; however, work order cannot be generated from the PM having a decommissioned asset


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    现用C mol/L的EDTA滴定同浓度的钙,Ca2+无副反应。已知此时滴定的突跃范围为ΔpM。若EDTA和钙的浓度均增加10倍,则此时滴定的突跃范围大小为()
    A

    ΔpM`=ΔpM-2

    B

    ΔpM`=ΔpM+1

    C

    ΔpM`=ΔpM-1

    D

    ΔpM`=ΔpM+2


    正确答案: B
    解析: 暂无解析

  • 第24题:

    多选题
    You execute the following command to change the status of the SALES tablespace:  SQL> ALTER TABLESPACE sales OFFLINE;  Which statements describe the effect of the command()
    A

    The tablespace would require recovery to go back online.

    B

    A checkpoint is taken on all data files that are associated with the SALES tablespace.

    C

    The sessions that subsequently try to access the objects in the SALES tablespace receive an error.

    D

    The new status of the SALES tablespace is recorded in the control file when the database instance is closed.


    正确答案: B,D
    解析: 暂无解析