Which action(s)are included in crane operations ________.
A.Pre-operation of the anchor windlass
B.Preparing steam on deck
C.Luff,slew,and hoist operations
D.All of the above
第1题:
Which of the following statements is TRUE regarding crane operations ________.
A.Radio communications allow the crane operator to disregard the use of hand signals
B.The crane operators and signalman must be familiar with the correct hand signals
C.The forward cranes can be operated from the bridge
D.The aft cranes can be operated from the aft steering station
第2题:
During which condition should be operator of a pedestal crane shutdown operations?
A.Bunkering
B.High winds
C.Potable water spill on deck
D.More than 3°list
第3题:
Which two statements are true about firewall filter configurations?()
第4题:
clean anchor chain as it's hauled in
recover anchors which have lost their buoys
run and retrieve anchors
prepare anchor chain for inspection
第5题:
Normal boom stowage and shutdown operations
Emergency shutdown operation
Removing booms from stowage
All of the above
第6题:
The cranes may be operated independently
The cranes may be interconnected for twin operation
When twinned,the crane rotation on the foundation assembly is unlimited
All of the above
第7题:
Radio communications allow the crane operator to disregard the use of hand signals
The crane operators and signalman must be familiar with the correct hand signals
The forward cranes can be operated from the bridge
The aft cranes can be operated from the aft steering station
第8题:
Bunkering
High winds
Potable water spill on deck
第9题:
Bunkering barge alongside
Potable water spill on deck
Crane hydraulic hose bursts
Trim greater than 4 feet
第10题:
brake compressor wheel
devil's claw
wildcat
winchhead
第11题:
Multiple action modifiers can be included in the same term.
Only a single action modifier can be included in the same term.
If an action modifier exists without a terminating action, matching packets will be accepted.
If an action modifier exists without a terminating action, matching packets will be discarded.
第12题:
See that the anchor is clear of obstructions
See that the chain is all clear
See that the wildcat is disengaged
All of the above
第13题:
During which condition should the operator of a pedestal crane shutdown operations ________.
A.Bunkering barge alongside
B.Potable water spill on deck
C.Crane hydraulic hose bursts
D.Trim greater than 4 feet
第14题:
Which of the following three service requirements are included in the Cisco UnifiedCommunications optimize phase()
第15题:
Multiple action modifiers can be included in the same term.
Only a single action modifier can be included in the same term.
The default term within a firewall filter uses the discard action.
The default term within a firewall filter uses the reject action.
第16题:
Lightning in the vicinity
An approaching squall line
A fire on the pier
All of the above
第17题:
Veer chain to the riding anchor
Heave to a shorter scope of chain on the riding anchor
Drop the second anchor at the extreme end of the yaw and veer the riding anchor
Drop the second anchor at the extreme end of the yaw,then adjust the cables until the scope is equal
第18题:
Bill
Devil's claw
Palm
Crown
第19题:
Lightning
High winds
Fire aboard
All of the above
第20题:
Let go of both control levers and return to neutral position
Press the emergency stop
Notify the mate on watch
All of the above
第21题:
Do not exceed rated load capacity of crane and container spreader or slings
During any cargo handling operation,the safety of personnel is paramount
Cargo handlers must be outfitted with adequate protection from personal injury
All the above
第22题:
A vessel engaged in underwater operations
A vessel engaged in mine clearance
A vessel engaged on pilotage duty
A vessel engaged in survey operations
第23题:
Drop the starboard anchor short with about one shot of chain
Sheer out to starboard using the rudder,then drop the starboard anchor with about four shots of chain
Put the engines slow ahead to help the anchor
Veer out more chain on the port anchor