Which action(s)are included in crane operations ________.A.Pre-operation of the anchor windlassB.Preparing steam on deckC.Luff,slew,and hoist operationsD.All of the above

题目

Which action(s)are included in crane operations ________.

A.Pre-operation of the anchor windlass

B.Preparing steam on deck

C.Luff,slew,and hoist operations

D.All of the above


相似考题
更多“Which action(s)are included in crane operations ________.A.Pre-operation of the anchor win ”相关问题
  • 第1题:

    Which of the following statements is TRUE regarding crane operations ________.

    A.Radio communications allow the crane operator to disregard the use of hand signals

    B.The crane operators and signalman must be familiar with the correct hand signals

    C.The forward cranes can be operated from the bridge

    D.The aft cranes can be operated from the aft steering station


    正确答案:B

  • 第2题:

    During which condition should be operator of a pedestal crane shutdown operations?

    A.Bunkering

    B.High winds

    C.Potable water spill on deck

    D.More than 3°list


    正确答案:B
    在那种情况下,应该关闭克令吊作业?大风。

  • 第3题:

    Which two statements are true about firewall filter configurations?()

    • A、Multiple action modifiers can be included in the same term.
    • B、Only a single action modifier can be included in the same term.
    • C、The default term within a firewall filter uses the discard action.
    • D、The default term within a firewall filter uses the reject action.

    正确答案:A,C

  • 第4题:

    单选题
    A permanent chain chasing system is used to().
    A

    clean anchor chain as it's hauled in

    B

    recover anchors which have lost their buoys

    C

    run and retrieve anchors

    D

    prepare anchor chain for inspection


    正确答案: D
    解析: 暂无解析

  • 第5题:

    单选题
    Which action(s) is/are included in crane operations?()
    A

    Normal boom stowage and shutdown operations

    B

    Emergency shutdown operation

    C

    Removing booms from stowage

    D

    All of the above


    正确答案: B
    解析: 暂无解析

  • 第6题:

    单选题
    Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().
    A

    The cranes may be operated independently

    B

    The cranes may be interconnected for twin operation

    C

    When twinned,the crane rotation on the foundation assembly is unlimited

    D

    All of the above


    正确答案: A
    解析: 暂无解析

  • 第7题:

    单选题
    Which of the following statements is TRUE regarding crane operations().
    A

    Radio communications allow the crane operator to disregard the use of hand signals

    B

    The crane operators and signalman must be familiar with the correct hand signals

    C

    The forward cranes can be operated from the bridge

    D

    The aft cranes can be operated from the aft steering station


    正确答案: C
    解析: 暂无解析

  • 第8题:

    单选题
    During which condition should the operator of a pedestal crane shutdown operations?()
    A

    Bunkering

    B

    High winds

    C

    Potable water spill on deck


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    During which condition should the operator of a pedestal crane shutdown operations?()
    A

    Bunkering barge alongside

    B

    Potable water spill on deck

    C

    Crane hydraulic hose bursts

    D

    Trim greater than 4 feet


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    On an anchor windlass,the wheel over which the anchor chain passes is called a().
    A

    brake compressor wheel

    B

    devil's claw

    C

    wildcat

    D

    winchhead


    正确答案: C
    解析: 暂无解析

  • 第11题:

    多选题
    Which two statements are true about firewall filter configurations?()
    A

    Multiple action modifiers can be included in the same term.

    B

    Only a single action modifier can be included in the same term.

    C

    If an action modifier exists without a terminating action, matching packets will be accepted.

    D

    If an action modifier exists without a terminating action, matching packets will be discarded.


    正确答案: A,D
    解析: 暂无解析

  • 第12题:

    单选题
    Which safety check(s)should be made before letting go the anchor().
    A

    See that the anchor is clear of obstructions

    B

    See that the chain is all clear

    C

    See that the wildcat is disengaged

    D

    All of the above


    正确答案: A
    解析: 暂无解析

  • 第13题:

    During which condition should the operator of a pedestal crane shutdown operations ________.

    A.Bunkering barge alongside

    B.Potable water spill on deck

    C.Crane hydraulic hose bursts

    D.Trim greater than 4 feet


    正确答案:C

  • 第14题:

    Which of the following three service requirements are included in the Cisco UnifiedCommunications optimize phase()

    • A、Business Case Alignment
    • B、Security Assessment
    • C、Incident management
    • D、Operations Readiness Assessment
    • E、Technology Assessment

    正确答案:A,B,E

  • 第15题:

    多选题
    Which two statements are true about firewall filter configurations?()
    A

    Multiple action modifiers can be included in the same term.

    B

    Only a single action modifier can be included in the same term.

    C

    The default term within a firewall filter uses the discard action.

    D

    The default term within a firewall filter uses the reject action.


    正确答案: D,B
    解析: 暂无解析

  • 第16题:

    单选题
    During which condition should the operator of a pedestal crane shutdown operations?()
    A

    Lightning in the vicinity

    B

    An approaching squall line

    C

    A fire on the pier

    D

    All of the above


    正确答案: A
    解析: 暂无解析

  • 第17题:

    单选题
    You are riding to a single anchor.The vessel is yawing excessively.Which action should be taken to reduce the yawing().
    A

    Veer chain to the riding anchor

    B

    Heave to a shorter scope of chain on the riding anchor

    C

    Drop the second anchor at the extreme end of the yaw and veer the riding anchor

    D

    Drop the second anchor at the extreme end of the yaw,then adjust the cables until the scope is equal


    正确答案: D
    解析: 暂无解析

  • 第18题:

    单选题
    Which is NOT a part of an anchor().
    A

    Bill

    B

    Devil's claw

    C

    Palm

    D

    Crown


    正确答案: C
    解析: 暂无解析

  • 第19题:

    单选题
    During which condition should the operator of a pedestal crane shutdown operations?()
    A

    Lightning

    B

    High winds

    C

    Fire aboard

    D

    All of the above


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    Which action(s) should the operator of a pedestal crane take if crane control is lost?()
    A

    Let go of both control levers and return to neutral position

    B

    Press the emergency stop

    C

    Notify the mate on watch

    D

    All of the above


    正确答案: C
    解析: 暂无解析

  • 第21题:

    单选题
    Which statement(s) is/are TRUE concerning crane cargo operations? ()
    A

    Do not exceed rated load capacity of crane and container spreader or slings

    B

    During any cargo handling operation,the safety of personnel is paramount

    C

    Cargo handlers must be outfitted with adequate protection from personal injury

    D

    All the above


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    Which vessel when anchored at night,would not be required to show anchor lights? ()
    A

    A vessel engaged in underwater operations

    B

    A vessel engaged in mine clearance

    C

    A vessel engaged on pilotage duty

    D

    A vessel engaged in survey operations


    正确答案: D
    解析: 暂无解析

  • 第23题:

    单选题
    Your vessel is anchored in an open roadstead with three shots of chain out on the port anchor.The wind freshens considerably and the anchor begins to drag.Which action should you take FIRST().
    A

    Drop the starboard anchor short with about one shot of chain

    B

    Sheer out to starboard using the rudder,then drop the starboard anchor with about four shots of chain

    C

    Put the engines slow ahead to help the anchor

    D

    Veer out more chain on the port anchor


    正确答案: B
    解析: 暂无解析