A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server.Which limitation must be considered when planning the system configuration?()A.A

题目

A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server.Which limitation must be considered when planning the system configuration?()

A.A VIO server requires a dedicated LHEA port.

B.There is a limit of 32 LPARs per virtual LAN.

C.Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.

D.Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.


相似考题
更多“A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requir ”相关问题
  • 第1题:

    Companycomisplanningap5595runningAIX5L&ens

    Companycomisplanningap5595runningAIX5L5.3LPARs.Theywouldliketodesignthesystemusingphysicalresourceswithmaximumresourceefficiency.OneLPARrequiresapeakloadof30processorsduringtheweekwithalowof1processorrequiredontheweekend.TheotherLPARrequiresonlyasingleprocessormostofthetime,butneedsatleast24processorsatthebeginningoftheweekendtofinishitsweeklyprocessinginthewindowallocated.

    WhichofthefollowingsolutionsismostappropriatetocontinuouslymaximizeresourceuseforthesetwoLPARs?()


    参考答案:C

  • 第2题:

    Companycomhasap5595running12LPARs.Theyareinterestedinhighbandwidth,securecommunicationbetweentwooftheLPARswithinthep5595server.TheydonothaveanyunusedEthernetadapters.Whichofthefollowingrecommendationswillbestmeetthisrequirement?()

    A.Utilizetheintegrated10/100/1000networkinterface

    B.ImplementVirtualEthernettoenableinter-partitioncommunication

    C.ImplementsharedEthernetwiththeEthernetadaptersutilizedintheotherLPARs

    D.ImplementaPointtoPointprotocolserialcommunicationbetweenthep5595serialports


    参考答案:B

  • 第3题:

    YournetworkcontainsanActiveDirectorydomainnamedcontoso.com.ThedomaincontainsaservernamedServer1.Server1runsWindowsServer2012R2.Youneedtocreate3-TBvirtualharddisk(VHD)onServer1.Whichtoolshouldyouuse?()

    A.FileServerResourceManager(FSRM)

    B.New-StoragePool

    C.Diskpart

    D.ShareandStorageManagement


    参考答案:C

  • 第4题:

    A customer has just received three enterprise systems that support a total of 48 LPARs. Which installation method expedite the process?()

    A.Network installation manager

    B.Boot from installation media

    C.A migration install

    D.Copy the system using the HMC


    参考答案:A

  • 第5题:

    Company.comhasorderedan8-wayp5-570andplanstodeployfourAIX5Lv5.3LPARs.Thepre-installationsystemdesignhasalleightprocessorsbeingplacedinthesharedprocessorpool,andfourMicro-Partitionsbeingassignedresourcesfromthepool.Priortotheimplementationofthesystem,thecustomerinformsthetechnicalspecialistthatoneoftheapplicationsisonlysupportedonAIX5L5.2.Whichofthefollowingchangestothesystemdesignshouldthetechnicalspecialistmaketoaccommodatethischange?()

    A.CreateallthepartitionsasAIX5.2,eachhavingtwodedicatedprocessors.

    B.PurchaseasystemwithtwoadditionalprocessorsthatcanbeassignedtotheAIX5.2 Partition.

    C.SpecifyanAIX5.2partitionusingdedicatedprocessors,reducingthenumberofprocessors inthesharedpool.

    D.UsethevirtualI/Oservertomanagethedisksandnetworkconnectionsremovingtheneed fordifferentlevelsofdevicedrivers.


    参考答案:C

  • 第6题:

    当需要删除某个序列seq_customer_id,可以使用如下()方式。

    A.DROP SEQ_CUSTOMER_ID

    B.DELETE SEQUENCE SEQ_CUSTOMER_ID

    C.DROP SEQUENCE SEQ_CUSTOMER_ID

    D.DELETE SEQ_CUSTOMER_ID


    参考答案:C