第1题:
● Which statement about the preliminary design stage of a software development project is true? (75) .
(75)
A.The preliminary design is an internal document used only by programmers
B.The preliminary design is the result of mapping product requirements info software and hardware functions
C.The preliminary design of the product comes from the requirement specification
D.The developers produce the preliminary design by defining the software structure in enough detail to permit coding
第2题:
Program( )describes program&39;s objectives, desired output, input data required, processing requirement, and documentation.
A.specification B.flowchart C.structure D.address
第3题:
When steering by hand,which of the following may be a functional input to the steering gear as a result of turning the wheel ________.
A.Non-follow-up
B.Rudder adjustment
C.Weather adjustment
D.All the above may be activated
第4题:
第5题:
下列选项中属于过滤流Filter Input Stream的子类的是()。
第6题:
Which design phase service component includes the development and documentation of the test case or cases used to verify that a deployed infrastructure meets operational, functional, and interface requirements? Select exactly 1 answer(s) from the following:()。
第7题:
A system administrator used the savevg command to back up the testvg each night. There is now a requirement to exclude the /test/static filesystem from the backup. How can this be accomplished?()
第8题:
a test from the alternative power supply,if installed
timing the movement of the rudder from hard over to hard over
verification that the rudder angle indicator shows the actual position of the rudder(s)
visual inspection of the steering linkage
第9题:
ADR diagnostic files
all the optimizer statistics
initialization parameter settings
PL/SQL functions,procedures,and packages
the table and index definitions and actual data
第10题:
AutomationElementIdentifier
AutomationPeer
Keyboard
UICues
第11题:
in motion, providing a null input
not in motion, thus providing a null input
in motion, providing an input to place the main pump on maximum stroke
in motion, providing an input to place the main pump at null stroke
第12题:
Attach the remote debugger to the application.
Use the Microsoft Visual Studio 2010 Test Manager tool.
Use IntelliTrace to collect only eventsfrom the application.
Use IntelliTrace to collect events and call information from the application.
第13题:
please draw the transistor level schematic of a cmos 2 input AND gate and
explain which input has faster response for output rising edge.(less delay
time)。(威盛笔试题circuit design-beijing-03.11.09)
第14题:
● Basically, a computer consists of five components: (71), memory, storage, input device and output device.
(71)
A.keyboard
B.mouse
C.monitor
D.CPU
第15题:
第16题:
第17题:
You are designing a test plan for an existing Windows Azure .NET 4 application. Method calls return incorrect results for certain input parameters. You need to recommend an approach for debugging the method calls. What should you recommend?()
第18题:
Which design phase service component consists of developing a detailed, site-specific plan for implementing a new technology system or solution? Select exactly 1 answer(s) from the following:()。
第19题:
在自动驾驶的诊断页面中有哪些方式?
第20题:
It will respond only to interrogation by 9-Ghz radar signals
A SART will normally respond to interrogation from a searching vessel's radar if the radar antenna is at least 15 meters high
A SART will normally respond to interrogation from a searching aircraft's radar if the radar's output power is at least 10,000 watts and the aircraft is at a height of 3000 feet and within 30 nautical miles
All of the above
第21题:
The input to the XSL mapping rules of a WSSM Partner is the binary security token as received on the Web Service request. The output of the mapping rules is a new security token ready for use by the Web Service application.
The input to the XSL mapping rules of a WSSM Partner is an STSUniveralUser XML document created from the security token received on the Web Service request. The output of the mapping rules is an arbitrary collection of attributes that will be made available to the Web Services application.
The input to the XSL mapping rules of a WSSM Partner is an STSUniveralUser XML document created from the security token received on the Web Service request. The output of the mapping rules is a new STSUniversalUser XML document that represents the security token required by the application.
The input to the XSL mapping rules of a WSSM Partner is an STSUniveralUser XML document created from the security token received on the Web Service request. The output of the mapping rules is an IBM Tivoli Access Manager for e-business credential that will be used to authorize the partner's access to the Web Service application.
第22题:
staging and system migration
post implementation support handoff meeting
detailed design development
staff training
migration plan development
第23题:
high input impedance, high gain and low output impedance
high input impedance, high gain and high output impedance
low input impedance, low gain and high output impedance
low input impedance, high gain and low output impedance