第1题:
The purpose of systems analysis phase is to build a logical model of the new system. The first step is( ), where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the( ). You use the fact-finding results to build business models, data and process models, and object models. The deliverable for the systems analysis phase is the( ), which describes management and user requirements, costs and benefits, and outlines alternative development strategies. The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase, you need to determine the( ), which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the( ), which is presented to management and users for review and approval.
A.System logical modelingB.use case modelingC.requirements modelingD.application modeling A.systems planning phaseB.systems modeling phaseC.systems analysis phaseD.systems design phase A.system charterB.system scope definitionC.system blueprintD.system requirement document A.application architectureB.system data modelC.system process modelD.implement environment A.system architecture descriptionB.system design specificationC.system technique architectureD.physical deployment architecture
第2题:
Accelerated analysis approaches emphasize the construction of (71) to more rapidly identify business and user requirements for a new system. As an accelerated analysis technology,(72) reads the program code and automatically generates the equivalent system model, and the code can be obtained from (73) All system analysis approaches require some form. of (74) which includes those techniques to be used to identify or extract system problems and solution requirements from user community.(75) is a classical set of techniques used to collect information about system problems, opportunities, solution requirements, and priorities.
A.object models
B.prototypes
C.use cases
D.components
第3题:
●In general,atypical (71) model is composed of several phases, such as requirements analysis phase, generaUdetailed design phase, implementation phase, system acceptance testing phase.
(71)
A. waterfall
B.incremental
C.spiral
D.prototyping
第4题:
第5题:
第6题:
第7题:
第8题:
第9题:
第10题:
In Hammer’s five-step model, the purpose of “elicitation” is to provide the teacher with feed back as to what to do next.()
第11题:
You need to design a domain model that meets the company business and security requirements for controlling access to the new Web-based ordering application. What should you do?()
第12题:
To make preparations for a new publication.
To learn how couples spend their weekends.
To investigate what people do at the weekends.
第13题:
A address
B location
C program
D application
第14题:
试题(71)~(75)
The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, the project team investigates ny current system,identifies (71) , and develops a concept for the new system. This phase as three steps: first, (72) is developed to guide the project team's efforts. It usually ncludes an analysis of the current system and its problems, and the ways to design a new ystem. The next step is (73) The analysis ofthis information - in conjunction withinput rom the project sponsor and many other people - leads to the development of a concept for a ew system. The system concept is then used as a basis to develop a set ofbusiness analysis odels that describes how the business will operate if the new system were developed. The set of models typically includes models that represent the (74) necessary to support the nderlying business process. Last, the analyses, system concepts, and models are combined nto a document called the (75), which is presented to the project sponsor and other key ecision makers that decide whether the project should continue to move forward.
(71) A. improvementopportunities
B. logicalmodel
C. systemrequirements
D. systemarchitecture
(72) A. a user manual
B. an analysis strategy
C. an analysis use case
D. a design user case
(73) A. project scope definition
B. prob,lems analysis
C. decisionanalysis
D. requirementsgathering
(74) A. dataandprocesses
B. systeminfrastructures
C. externalagents
D. systemsoftware
(75) A. requirementsstatement
B. designspecification
C. systemproposal
D. project charter
参考译文
分析阶段回答谁将使用该系统、系统能做什么及系统在何时何地使用的问题。在该阶段,项目组调研当前系统、识别改进机会并开发出一个新系统的概念。这个阶段分为三个步骤:首先,开发一个分析策略来指导项目组工作。这些分析策略通常包括了当前系统及其问题的分析和设计新系统的方法。下一步是需求收集。对这些信息(汇同系统发起人和很多其他人员的输入)的分析会导致开发出一个新系统的概念。系统概念作为开发一组业务分析模型的基础,这些模型描述了新系统开发完成后企业如何运作。这组模型通常包含那些表示数据和过程的模型,这些数据和过程是支持底层业务过程所必需的。最后,这些分析、系统概念和模型合并到一个称为系统建议书的文档中,将被提交给项目组发起人和其他决定项目是否继续执行的主要决策人员。
参考答案
(71)A
(72)B
(73)D
(74)A
(75)C
第15题:
第16题:
第17题:
第18题:
第19题:
第20题:
第21题:
第22题:
In the event of a catastrophic disaster, after which you need to replace the entire UCS blade system (that is, new fabric interconnects, new IOMs, new chassis, and new blades), what type of backup would provide the most complete set of information?()
第23题:
logical configuration
all configuration
full state
system configuration