What are the two objectives in presenting a new structural item?
第1题:
第2题:
What are the two objectives in presenting a new structural item?
When presenting a new structural item we should be primarily trying to achieve two things:
a) to enable the students to recognize the new structure well enough to be able to produce it themselves (ie. establish the form);
b) to make absolutely clear the usage of the pattern, so that when the students produce them, prompted by the teacher, they know what they are saying (ie. establish the meaning).
略
第3题:
public class ItemTest { private final mt id; public ItemTest(int id) { this.id = id; } public void updateId(int newId) { id = newId; } public static void main(String[] args) { ItemTest fa = new ItemTest(42); fa.updateId(69); System.out.println(fa.id); } } What is the result?()
第4题:
public class Item { private String desc; public String getDescription() { return desc; } public void setDescription(String d) { desc = d; } public static void modifyDesc(Item item, String desc) { item = new Item(); item.setDescription(desc); } public static void main(String[] args) { Item it = new Item(); it.setDescription(”Gobstopper”); Item it2 = new Item(); it2.setDescription(”Fizzylifting”); modifyDesc(it, “Scrumdiddlyumptious”); System.out.println(it.getDescription()); System.out.println(it2.getDescription()); } } What is the outcome of the code? ()
第5题:
Given that Thing is a class, how many objects and reference variables are created by the following code?() Thing item, stuff; item = new Thing(); Thing entity = new Thing();
第6题:
A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()
第7题:
Which two statements are true about a Work Item with "Open" Notification? ()(Choose two.)
第8题:
The nomination for a new department head
Permission to begin a print advertising plan
An agreement on the content of a TV commercial
Funding approval for the production of a new item
第9题:
The Work Item is not eligible for Purge.
The Work Item is eligible for a Permanent purge.
The Work Item is eligible for a Temporary purge.
The Work Item is not complete because it still has Open Notification.
The Work Item is eligible for both Temporary and Permanent purge.
第10题:
defining
using real objects
writing a passage by using new words
giving explanations
第11题:
Asset
Location
Storeroom
Rotating Asset
第12题:
第13题:
第14题:
What are two objectives of a pre-site survey walkthrough? ()
第15题:
An Active Directory database is installed on the C volume of a domain controller. You need to move the Active Directory database to a new volume What should you do()
第16题:
What are the six principles to remember when presenting new vocabulary in class?
第17题:
In order to use the item records at the site level, to what must the item be added? ()
第18题:
What must be created before populating the Tools application? ()
第19题:
Tool to collect syslog messages from multiple sources
User Tracking to track IP telephones
Diagnostic trace tools to analyze connectivity
Monitoring of Cisco voice elements
Problem alerts for operations personnel
第20题:
He had to deal with harmful gases.
He criticized two West Virginia’s officials.
He prayed for the families of the miners.
He already knew the cause of the event.
第21题:
A new Item object is created with the preferred value in the id attribute.
The attribute id in the Item object is modified to the new value.
Compilation fails.
An exception is thrown at runtime.
The attribute id in the Item object remains unchanged.
第22题:
第23题:
Identify potential problem areas
Define intended coverage areas
Access compliance with local building codes
Determine the final location of APs and antennas
Identify sources of RF signal attenuation and RF interference
第24题:
Item Sets
Item Master Owner
Vendors for the Items
Storeroom assignment