A customer has a p650 on order and plans to put it in a current OEM rack. They are concerned that the p650 power supply may demand more current than the OEM PDU can provide. Which planning guide specification would provide the necessary requirements?()
第1题:
A customer has ordered a rack, a p650, two p630s, and two p615s. During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit. However, the specialist knows that the p650 will be racked, but the other systems will arrive separately. In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()
第2题:
A customer has an 8-way p650 running an application for about 200 users. In the past, the requiredamount of memory and processors has increased proportionally to the number of new users. The customer plans to increase users by 10% each year for the next three years. Next year, a database will be added to the workload to support the users directly rather than being on a separate machine. What is the most likely result of this projected growth?()
第3题:
Which of the following would be the BEST location to research current physical layout?()
第4题:
A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()
第5题:
A customer requires an 8-way 16GB AIX system. They are evaluating the following three systems: ? p5-570 ? p5-570 Express ? p650 The pSeries technical specialist has been asked to explain the pros and cons of the three solutions. What information will help the customer decide on the best solution for their environment?()
第6题:
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()
第7题:
A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the power cord plug to show to their electrician. Where would the pSeries technical specialist find the required information?()
第8题:
Companycom is moving their application to a p5 590 and at the same time moving to a new version of the application. The customer knows only about the resource requirements of the old version. Which of the following is the best method to migrate their application to POWER5?()
第9题:
Sales Manual
Announcement Letter
POWER4+ p650 Specification Sheet
Site and Hardware Planning Information Manual
第10题:
OEM website
Software logs
Baseline documentation
Pre-installation plans
第11题:
Have the PDU requirements been met?
Are there sufficient KVM connections?
Is there sufficient service clearance?
Is there sufficient space in the existing rack?
第12题:
What are the plans for Disaster Recovery?
What are the plans for data migration?
Would iSCSI meet your needs?
How much space is available in the current storage systems?
第13题:
Why would you use WebLogic Diagnostics Framework (WLDF) instead of Oracle Enterprise Manager (OEM) ()
第14题:
A customer wants to install a pSeries system into an OEM rack. What critical information is provided in the Site and Hardware Planning Information manual?()
第15题:
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()
第16题:
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()
第17题:
A customer has requested five rack mounted servers, and a rack. They want redundant power connections. Which of the following is required to meet these requirements?()
第18题:
A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers. They have four identical new applications each requiring a minimum of seven processors and 96GB of memory. Which solution would best meet the customer’s requirements?()
第19题:
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()
第20题:
A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()
第21题:
Voltage
Frequency
Power Source Loading (max)
Power Source Loading (typical)
第22题:
WLDF has better performance than OEM
my organization already has a solution for unified management and monitoring; we need to supplement that with some specific WLS-related capabilities
OEM is not certified with latest version of WLS
OEM is really focused on the database tier, is not meant to address JEE management and monitoring
第23题:
Disk usage will increase in proportion to memory.
The new database will demand much more memory.
Memory demand will increase 10% for the next year.
Processor demand will increase about 10% for the next year.