A company has a large data center with hundreds of AIX and Linux OS images on both stand-alone and LPARed machines.  They are likely to undergo some downsizing in the near future.  The IT Director is concerned with their ability to manage the environment 

题目

A company has a large data center with hundreds of AIX and Linux OS images on both stand-alone and LPARed machines.  They are likely to undergo some downsizing in the near future.  The IT Director is concerned with their ability to manage the environment with fewer staff members. What software should the pSeries technical specialist recommend to the customer to provide for more efficient management, quicker provisioning, and monitoring?()

  • A、TSM
  • B、CSM
  • C、NIM
  • D、PSSP

相似考题
更多“A company has a large data center with hundreds of AIX and Linux OS images on both stand-alone and LPARed machines.  They are likely to undergo some downsizing in the near future.  The IT Director is concerned with their ability to manage the environment ”相关问题
  • 第1题:

    Companycom is purchasing a p5 595 as part of a large server consolidation. They are planning on using micropartitioning and Virtual IO to consolidate small machines. They used the rPerf numbers for AIX 5.3 to size their solutions. They discovered that their application is not yet certified on AIX 5.3, so they will have to use AIX 5.2. What changes should be made to their configuration?()

    • A、Increase memory
    • B、Add more adapters
    • C、Increase both processors and adapters
    • D、Increase the number of processors by 20 - 30%

    正确答案:C

  • 第2题:

    An administrator is attempting to start a server from a bootable Linux disk but instead the serverboots into Windows. Which of the following is the MOST likely reason for this?()

    • A、 The system needs to boot to Windows first, prior to booting into Linux.
    • B、 The OS settings are not set properly for Linux support.
    • C、 The boot order is set incorrectly in the BIOS.
    • D、 The Linux disk is not supported in a Windows environment.

    正确答案:C

  • 第3题:

    A customer has a Linux server farm and wants to use IBM Director to manage all of their systems.  Which of the following is the preferred installation of IBM Director to fully manage the Linux systems?()

    • A、Install Director Server on a Windows 2000 Server and install the Director agents on the Linux systems.
    • B、Install IBM Director Agent on a Linux server and install the Director Server on the Linux systems.
    • C、Install the Director Server on a Linux server and manage the systems via Linux native SNMP support.
    • D、Install Director Server on a Linux server and install the Director Linux agent on the Linux systems.

    正确答案:D

  • 第4题:

    A customer has a mixed Dell and IBM server environment.  They want to implement a system management solution for all their Windows, Linux, and VMWare ESX Intel based servers.  Which TWO features of IBM Director will be an advantage for this customer?()

    • A、IBM Director comes with free Aurema and SteelEye software plug-ins.
    • B、IBM Director supports non-IBM industry standard Intel based servers.
    • C、IBM Director servers can be managed from within the MS Performance Monitor.
    • D、IBM Director requires no agents to be installed and run on the IBM systems.
    • E、IBM Director offers agents to manage VMWare ESX Server and runs on Linux while Dell does not.

    正确答案:B,E

  • 第5题:

    Which of the following best describes what is meant by Linux Affinity on AIX?()

    • A、The ability to install a Linux system on an AIX system
    • B、The ability to install an AIX system on a Linux system
    • C、The ability to compile and run a Linux application on AIX
    • D、The ability to compile and run an AIX application on Linux

    正确答案:C

  • 第6题:

    A customer has just obtained a second data center through the acquisition of a competitor.   The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years.   They have just deployed a high-speed point-to-point circuit between the facilities. The IT Director would like a system that could backup their AIX and Win2K servers and electronically vault the data between sites as part of their Disaster Recovery Plan.   What product should the pSeries technical specialist recommend for this requirement?()

    • A、CSM
    • B、TSM
    • C、NIM
    • D、Sysback

    正确答案:B

  • 第7题:

    What are key benefits of IBM Systems Director Standard Edition?()

    • A、Backup data Manage problems Monitor network system
    • B、Report problems Manage servers and virtual environment Monitor the network 
    • C、Monitor system health and network Install and manage AIX and IBM i Manage energy consumption 
    • D、Monitor system health and network Manage servers and virtual environment Collect performance data

    正确答案:B

  • 第8题:

    A manufacturing business is presently supporting multiple UNIX platforms and considering the advantages of consolidating environments, adding new applications and standardizing on HP-UX with IA-64. Which advantage should be communicated as the most compelling reason to consider pSeries as the platform of choice?()

    • A、The pSeries family of servers offers many choices from small entry servers to data-center class systems
    • B、pSeries systems support both AIX and Linux operating systems providing a single platform for both environments
    • C、AIX contains the tools and utilities necessary to convert all their UNIX software onto a single pSeries server
    • D、Thousands of AIX operating system-based applications, middleware, and tools are available today and already optimized

    正确答案:D

  • 第9题:

    A customer plans to consolidate to high-end enterprise level servers using multiple partitions.  They are evaluating an IBM POWER5 solution for their server consolidation environment.  Which of the following best describes the value of the IBM solution as compared with the competition?()

    • A、The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.
    • B、The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.
    • C、The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.
    • D、The POWER5 system supports more partitions and has the lowest partitioning overhead.

    正确答案:A

  • 第10题:

    单选题
    The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()
    A

     There are discolored ceiling tiles near the middle of the room.

    B

     Large amounts of dust have accumulated in the corners of the room.

    C

     The anti-static carpet has been removed resulting in a bare painted concrete floor.

    D

     A wet pipe water-based sprinkler system has been installed above the racks.


    正确答案: C
    解析: 暂无解析

  • 第11题:

    单选题
    Which of the following best describes what is meant by Linux Affinity on AIX?()
    A

    The ability to install a Linux system on an AIX system

    B

    The ability to install an AIX system on a Linux system

    C

    The ability to compile and run a Linux application on AIX

    D

    The ability to compile and run an AIX application on Linux


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    A customer plans to consolidate to high-end enterprise level servers using multiple partitions.  They are evaluating an IBM POWER5 solution for their server consolidation environment.  Which of the following best describes the value of the IBM solution as compared with the competition?()
    A

    The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.

    B

    The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.

    C

    The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.

    D

    The POWER5 system supports more partitions and has the lowest partitioning overhead.


    正确答案: D
    解析: 暂无解析

  • 第13题:

    The current data center has run out of space. A room that is located next to the existing data center is then used to house two racks containing six servers. Six months later, physical housekeeping is performed as part of a mid-year maintenance plan. Which environmental condition discovered in the room is LEAST critical?()

    • A、 There are discolored ceiling tiles near the middle of the room.
    • B、 Large amounts of dust have accumulated in the corners of the room.
    • C、 The anti-static carpet has been removed resulting in a bare painted concrete floor.
    • D、 A wet pipe water-based sprinkler system has been installed above the racks.

    正确答案:C

  • 第14题:

    An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.  Which of the following site types should be considered to meet these requirements? ()

    • A、 Hot site
    • B、 Warm site
    • C、 Cold site
    • D、 Active failover site

    正确答案:B

  • 第15题:

    Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions.  Which of the following data center servers can be used for this purpose?()

    • A、p5-520 running Virtual I/O Server
    • B、p690 running AIX 5L V5.3
    • C、p5-510 running AIX 5L V5.2
    • D、p5-520 running two dedicated processor partitions

    正确答案:A

  • 第16题:

    A large shipping company that is standardized on Fibre Channel storage has just acquired a regional shipping company that is using an IBM XIV system. The large company would like to integrate the XIV system into the environment and manage all data through a single management interface. Which product should be suggested so that all data can be managed?()

    • A、IBM DS8700
    • B、IBM XIV GUI
    • C、IBM System Storage N7600
    • D、IBM SAN Volume Controller (SVC)

    正确答案:D

  • 第17题:

    Company.com has several network adapters configured as backup paths using the Virtual IP Addressing and dynamic routing of AIX. A second node needs to be added to the environment to crate a cluster. What considerations must be addressed during the planning session?()  

    • A、 HACMP supports most types of networks,including Virtual IP Addressing by AIX.
    • B、 If HACMP IP aliasing is used,the devices may be the Virtual IP type used by AIX.
    • C、 Using the AIX Virtual IP Addressing scheme HACMP can provide near fault tolerant availability of the network.
    • D、 The AIX Virtual Addressing mechanism is not supported by HACMP,but a similar configuration can be created in HACMP.

    正确答案:D

  • 第18题:

    A data center includes a Power 750 server running AIX and Linux, and PS700 Blades running AIX. What can the customer use to update AIX and Linux, create and deploy LPARs, and set energy caps for both servers from a single console?()

    • A、PowerVM Standard Edition
    • B、VMControl Standard Edition
    • C、Hardware Management Console
    • D、IBM Systems Director Standard Edition

    正确答案:D

  • 第19题:

    A customer is moving from an HP-UX environment to an AIX environment. They will be producing a master image of the environment and will need to install it into hundreds of LPARs and WPARs.  Which AIX tool will be of most use in this case?()

    • A、NIM
    • B、smit
    • C、SUMA
    • D、netboot

    正确答案:A

  • 第20题:

    Certkiller .com has a remote data center with servers connected to a local datacenter through a high-speed network. Which of the following methods is the most convenient to use to install and upgrade the servers in the remote center using locally managed install images?()

    • A、NIM
    • B、HAGEO/HACMP
    • C、NFS
    • D、ftp, rsh and rexec

    正确答案:A

  • 第21题:

    Your company has a Microsoft Hyper-V Server 2008 R2 environment. You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You are creating a virtual test environment by installing two child partitions. The test environment must be completely isolated from all production servers. You need to ensure that the child partitions can communicate with each other. Which connection type should you configure?()

    • A、Private
    • B、Internal
    • C、External
    • D、Dedicated host

    正确答案:A

  • 第22题:

    单选题
    A large corporation is concerned about the amount of time it takes to back up their main file server. They are also concerned that their IT technician frequently forgets to change the backup tapes, thereby leaving the company open to data loss. Which backup system would solve both problems?()
    A

     RAID

    B

     tape library

    C

     optical storage

    D

     disk to disk to tape


    正确答案: B
    解析: 暂无解析

  • 第23题:

    单选题
    Company.com has several network adapters configured as backup paths using the Virtual IP Addressing and dynamic routing of AIX. A second node needs to be added to the environment to crate a cluster. What considerations must be addressed during the planning session?()
    A

     HACMP supports most types of networks,including Virtual IP Addressing by AIX.

    B

     If HACMP IP aliasing is used,the devices may be the Virtual IP type used by AIX.

    C

     Using the AIX Virtual IP Addressing scheme HACMP can provide near fault tolerant availability of the network.

    D

     The AIX Virtual Addressing mechanism is not supported by HACMP,but a similar configuration can be created in HACMP.


    正确答案: B
    解析: 暂无解析