During the TDA, it is determined that Global Mirror will be implemented. The IBM team wants to ensure that they have enough DS8800 fiber links to handle the mirroring workload. Which tool should be used to determine the number of fiber links needed()
第1题:
A.TheDeliveryLeader
B.TheOpportunityOwner
C.TheSolutionDesigner
D.TheSubjectMatterExpert
第2题:
A. Q.931
B. IPCP
C. multilink
D. CHAP
E. callback
第3题:
Which of the following can LCP successfully negotiate during the establishment of a PPP connection?()
第4题:
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()
第5题:
A customer has two DS8000 systems in their environment. One DS8000 has FlashCopy licensed while the other does not. The customer wishes to license FlashCopy on the second DS8000. Which of the following describes the TDA requirement in this situation()
第6题:
When performing an expert level pre-install Technical & Delivery Assessment (TDA), which team member has the responsibility for assigning, tracking and updating the completion of action items during the TDA process?()
第7题:
An opportunity has been successfully won by a Business Partner in collaboration with IBM. Whohas responsibility for conducting the TDA process?()
第8题:
In which phase should a TDA be performed of the following?()
第9题:
The Delivery Leader
The Opportunity Owner
The Solution Designer
The Subject Matter Expert
第10题:
stronger than during the summer months
weaker than during the summer months
drier than during the summer months
wetter than during the summer months
第11题:
when installing SSD drives
when adding a new workload
when installing SATA drives
when adding more Linux hosts
第12题:
在EV/EB/TDA方法中,要最终得到对股票市值的估计,还必须减去债权的价值
P/E和EV/EB/TDA反映的都是市场价值和收益指标之间的比例关系
P/E是从全体投资人的角度出发,而EV/EB/TDA是从股东的角度出发
EV/EB/TDA更适用于单一业务或子公司较少的公司估值
第13题:
A.Beforethefirstsolutiondesignmeetingwiththecustomer
B.Afterthesolutiondesignproposalissubmittedtomanufacturingforreview
C.Oncethecustomerhassuppliedthesolutiondesignspecificationstothesalesteam
D.Afterthesolutiondesigniscompletedandbeforetheproposalissubmittedtothecustomer
第14题:
A.74LS164
B.TDA2003
C.LM368
第15题:
A customer is planning a combined solution of a 2 node SVC and DS8700 with 128x300 GB FC disks. During the TDA the reviewer compares the machine configuration with the customer’s expectations. Which of the following customer requirements must be considered()
第16题:
In which phase should a TDA be performed?()
第17题:
After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()
第18题:
Which document is the final determination of whether or not a TDA is required for a certainproduct?()
第19题:
An IBM technician specialist has a prospective customer who is excited about eX5 and is working on configuration for a very large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. The customers recently selected a Business Partner who has been involved in the last few design changes. What steps should the IBM technician specialist take to make sure the customer is satisfied with the solution?()
第20题:
The EMC storage specialist has not participated in the TDA meeting
The FC HBAs are 4 Gbps technology
The Technical and Delivery Assessment review actions were not executed
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
第21题:
DS8000 model conversions are generally non-disruptive
a model conversion from DS8100 to DS8700 is disruptive
the DS8100 base frame needs to be sent back to the factory for upgrade
during model conversion the logical configuration can be kept, but the system must be rebooted
第22题:
t=b:b=a:a=t
a=a+b:b=a-b:a=a-b
t=a:a=b:b=t
a=b:b=a
第23题:
A=U·I·t
A=U·I-t
A=U+I·t
A=U·I·V