An xSeries specialist monitors a customer’s server that has poor performance. The customer is running an x365 with a ServeRAID 6i controller with write-back cache turned on and ten 15K rpm drives in a RAID-5 array. It is a mission-critical server and must have a redundant storage system. Performance tests indicate that the Average Disk sec/Transfer exceeds 20 ms. Which of the following is the lowest-cost method to increase the throughput?()
第1题:
An existing IBM customer has some iSeries servers in their environment. The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications. The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms. Which of the following will accomplish this?()
第2题:
A customer has a need for an xSeries server for an application requiring 12GB memory with the capacity of up to 20GB. The HDD configuration needs to be as follows: (1)Two drives RAID-1 for the operating system (2)Five drives for Data in a RAID-5 configuration with one Hot-Spare (3)All drives have to be internal. Which of the following will satisfy the requirements for the application?()
第3题:
When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why?()
第4题:
A customer is installing a new xSeries server into a Token-Ring environment. Where would the customer find the latest supported Token-Ring PCI adaptors for that server?()
第5题:
A customer purchased a new IBM xSeries x445. They already have a non-IBM industry standard rack with 14U of open space that is being considered to house the new server. The rack houses an existing UPS unit for the entire rack. Which of the following questions is most important to ensure that the power in the datacenter environment is ready for the initial install?()
第6题:
Software Rejuvenation
Capacity Manager
Capacity Workload Manager
Aurema Application Workload Manager
第7题:
An x260 with dual fault tolerant ServeRAID adapters and 12 internal drives
An x366 with dual fault tolerant NICs with a single Fibre HBA directly attached to a DS4300 with three EXP710s fully populated with 146GB Fibre Drives
An x366 with dual fault tolerant NICs and two Fibre HBAs directly attached to a DS4300 Turbo with three EXP700s fully populated with 146GB drives
An x445 server with dual fault tolerant HBAs and a DS4500 with two additional EXP710s fully populated with 146GB Drives
第8题:
Cisco MCS 78xx servers
Dell PowerEdge servers
HP DL Cisco certified servers
Acer Altos servers
IBM xSeries Cisco certified servers
Apple servers
第9题:
A Dell customer decided to use IBM Director and xSeries to manage their servers. They purchased 10 IBM x336 servers and they already have 75 various Dell servers. Which TWO steps need to be verified to be able to manage the mixed environment with IBM Director?()
第10题:
A customer is planning to implement a Linux solution and is trying to decide whether the application should go on an xSeries 365 with a IA-32 processor or a p5-520 with a POWER5 processor. Which of the following questions would best help them make that determination?()
第11题:
A retailer is considering deploying an online transaction application on xSeries to serve their buyers. The server will need no more than four processors and will run on Red Hat Linux AS. The storage requirement is for 5TB of usable storage, and the maximum memory requirement is 4GB of RAM. Which solution will provide the best price and performance while maintaining fault tolerance?()
第12题:
An online retailer is considering deploying a database application on xSeries and Windows to serve their Web-based transactions. The database will need about 4TB of usable storage. Downtime costs the customer tens of thousands of dollars per minute, so system availability will be of highest priority. The customer needs to acquire the system within a certain budget but will pay for things that provide higher system availability. Which of the following will be the most appropriate solution?()
第13题:
A customer uses an IBM xSeries x366. They experienced downtime when the NIC failed earlier this year. Their Windows 2003 server needs to be accessible all the time, at the highest speed possible. Two adapters are currently installed in the x366. Which of the following is the procedure to obtain the best performance and ensure network functionality in case of NIC failure?()
第14题:
IBM ServerProven hardware website
IEEE Proven website
IBM PartnerWorld website
3Com Support website
第15题:
pSeries and xSeries use different file systems. Consolidating Storage and backup is not achievable.
Consolidation is possible by connecting pSeries local storage to the xSeries SQL server using the IXA adapter.
Storage consolidation can be achieved by connecting the pSeries and xSeries servers to a common DS4000 storage server.
Storage consolidation is only achievable when raw file systems are used by the databases and both servers run the same Linux file system (e.g., EXT3 or Reiser).
第16题:
IBM provides optional Remote Technical Support for hardware, NOS, and VMWare.
The IBM xSeries EXA chipset has extensions to provide better efficiency for the VMFS file system.
IBM servers can address larger LUNs on SAN storage than Dell.