A pSeries technical specialist is designing a p5-550 LPAR solution which will contain four logical partitions. Which tool should be used to ensure adherence to all partition rules?()
第1题:
Which IBM resource should be used to validate the results from a Disk Magic study PRIOR topresenting the final storage solution and pricing to a customer?()
第2题:
A customer has defined their server needs as a four-LPAR 16-way p570 with 64GB of memory, four 10/100/1000 TX LAN adapters, and six fibre channel adapters to external storage in an IBM ESS (Shark). They like the idea of being able to do SAN maintenance while not incurring downtime. If all LPARs are production related and similar, which question is most appropriate for the pSeries technical specialist to ask?()
第3题:
A customer is interested in obtaining an AIX solution from IBM. They have two primary global requirements: ? Availability (although HACMP is not required) ? Low cost Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()
第4题:
A customer is having problems after an AIX version upgrade from 5.2 to 5.3. Which of the following should the pSeries technical specialist recommend that the customer call?()
第5题:
Which of the following explains the relationship between a physical and logical partition?()
第6题:
The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors. The system is a test system to run AIX 5.2. The customer has stated a preference for internal disks for the boot devices. The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()
第7题:
A pSeries technical specialist has completed a server consolidation study of a customer’s environment. An LPAR worksheet was produced, which details the resource (CPU, memory, disk, adapters) requirements for each OS image (partition) based on workload. What is the most appropriate next step?()
第8题:
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
第9题:
2104
ESS800
FAStT600
SSA 7133
第10题:
A physical partition is hosted on one or more logical partitions. A logical partition is used when describing storage.
A logical partition is hosted on one or more physical partitions. A physical partition is used when describing storage.
A physical partition is used when describing only a SCSI or SAS disk. A logical partition is used when describing a SAN LUN.
A logical partition is used when describing only a SATA or SAS disk. A physical partition is used when describing RAID or mirrored arrays.
第11题:
0
1
255
256
第12题:
It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.
It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.
It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.
It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.
第13题:
A customer needs a solution that provides a total of eight processors (four active and four inactive), 16GB of memory, Advanced POWER Virtualization, and the ability to grow. Which of the followingsystems should the pSeries technical specialist propose?()
第14题:
A customer wants to upgrade an existing pSeries system. In addition to retrieving the IBM configuration records, what else should be done to ensure an accurate upgrade quote is provided?()
第15题:
A customer has requested the most cost-effective p5 solution allowing for growth. Which of the following should the pSeries technical specialist consider doing when configuring each p5 system using eConfig?()
第16题:
An administrator is creating a new logical partition (LPAR) with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()
第17题:
A customer requires a deskside solution that they will rack-mount in the future. Space is at a premium. The solution must support two AIX 5.2 applications that require two processors each. Which of the following deskside configurations should the pSeries Technical Specialist recommend?()
第18题:
A pSeries technical specialist has been asked to provide a server consolidation solution to replace several AIX servers running typical commercial database workloads. Benchmarks for SPECint, SPECfp, SPECjbb as well as estimates of ROLTP and rPerf are available for all the current systems. Which of the following could be used as a first approximation of total performance required for one large server?()
第19题:
The sales team has brought in the pSeries technical specialist to recommend the best solution to win the business. The customer wants the lowest purchase cost four-disk solution using an external I/O solution. Which of the following offerings provides the required base function at the lowest cost?()
第20题:
The pSeries technical specialist of a Premier Tier 1 Business Partner has been working on a design for a four LPAR p5-570 Express solution. The specialist has received conflicting information regarding sharing the IDE DVD-RAM drive between different LPARs. Who should the technical specialist contact to gain a definitive answer?()
第21题:
A
B
C
D
第22题:
LVT
eSAR
eConfig
PCRS6000
第23题:
p650
p5-570
Two p630s
p5-570 Express