Validation是(),Verification是()。
第1题:
The identification and removal of bugs in a program is called”(73)
A.checking
B.debugging
C.revision
D.verification
第2题:
第3题:
()是CMVP(Cryptographic Module Validation Program)必要的先决条件
第4题:
CMVP(Cryptographic Module Validation Program)评估需要为模块改进提供帮助
第5题:
Which statement describes the below output from an MDS switch?() Flow ID. 44 Initiator VSAN: 200 Initiator WWN: 50:06:04:8a:cc:19:12:db Target VSAN: 200 Target WWN: 50:06:04:8c:de:ad:be:ef T arget LUN: ALL LUNs Flow Verification Status: ------------------------- Initiator Verification Status: success Target Verification Status: WWN was not found in name server Initiator Linecard Status: success Target Linecard Status: Status not yet checked Feature Status: --------------- Write-Acceleration enabled Write-Acceleration Buffers: 1024 Configuration Status: flow verification failed
第6题:
An administrator will be performing a PowerHA upgrade on a cluster from version 5.3 to version 5.5. Which ofthe following tasks will verify a successful migration?()
第7题:
A cluster administrator has decided to add a cluster verification to the weekly maintenance scripts That are run from corn. When a cluster verification is performed,which of the following will require a custom verification method?()
第8题:
You execute the following RMAN command in the order shown below: BACKUP VALIDATE DATABASE; BLOCKRECOVER CORRUPTION LIST; What will these commands do?()
第9题:
HACMP ODM object classes
HACMP Error Notification
HACMP Topology & Resources
HACMP Application Server Start/Stop scripts
第10题:
对
错
第11题:
update
finish
outdated
expire
第12题:
The zone containing both the initiator and target does not exist
The zone set has not been activated
The target is not logged into the fabric
The pWWN used for the target is invalid
第13题:
第14题:
密码算法正确性检测(CAVP)是CMVP(Cryptographic Module Validation Program)必要的先决条件
第15题:
密码算法验证是CMVP(Cryptographic Module Validation Program)的先决条件。
第16题:
密码算法验证不是CMVP(Cryptographic Module Validation Program)的先决条件。
第17题:
An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
第18题:
An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
第19题:
You execute the following RMAN commands in the order shown below: BACKUP VALIDATE DATABASE; BLOCKRECOVER CORRUPTION LIST; What will these commands do?()
第20题:
You create a Web Form that contains a button named btnCancel that enables users to exit the page. When users click this button, validation must not occur. During testing you learn that clicking the Cancel button does not enable users to exit the page. You need to ensure that users can always exit the page. What should you do?()
第21题:
A pre-event
Error notification
Application monitoring
Custom verification methods
第22题:
对
错
第23题:
软件测试是使用人工操作或者软件自动运行的方式来检验它是否满足规定的需求或弄清预期结果与实际结果之间的差别的过程
软件测试的测试目标是发现一些可以通过测试避免的开发风险
软件测试的原则之一是测试应该尽早进行,最好在需求阶段就开始介入
软件测试主要工作内容是验证(verification)和确认(validation)