第1题:
22 In a matrix organizational form, which factor(s) make it difficult for a project manager to provide a valid input into the employee's performance review?
A. Not working directly with the assigned functional employees
B. Employees spend only a short amount of time assigned to the project
C. Not being knowledgeable enough to evaluate employees on technical judgment
D. All of the above
E. A and B only
第2题:
123 The scope of a project can be expected to change if:
A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occurs
C. The project manager is assigned after the project is defined, and the cost and schedule are approved D. A clear objective is not provided
E. All of the above are possible based upon the situation
第3题:
● A Gantt chart is useful in determining:
A the level of effort for a task
B when a task starts and stops
C how tasks are related to each other
D who is assigned to do a task
E All of the above.
第4题:
Translation is interesting _____ challenging.
A、as
B、as well
C、also
D、as well as
第5题:
Was there a course you found particularly challenging?
第6题:
第7题:
Having been familiar with his ability, ().
Athe manager was assigned a challenging task
Bthe manager assign a challenging task
Cthe board assigned him a challenging task
Da challenging task was assigned to the manager
第8题:
You are assigned the task of building a panel containing a TextArea at the top, a label directly below it,and a button directly below the label. If the three components are added directly to the panel. Which layout manager can the panel use to ensure that the TextArea absorbs all of the free vertical space when the panel is resized?()
第9题:
There is no popularity that really counts.
Many parents think that their children are challenging their authority.
It is not necessarily bad for a teenager to disagree with his or her classmates.
Most teenagers are actually doing the same.
第10题:
the manager was assigned a challenging task
the manager assign a challenging task
the board assigned him a challenging task
a challenging task was assigned to the manager
第11题:
cryptic, comprehending
bizarre, patronizing
cohesive, emphasizing
assertive, discerning
fabricated, challenging
第12题:
第13题:
41 The scope of a project can be expected to change if:
A. The project manager must provide cost estimates without having a design concept B. Oversimplification (underestimating) of the nature of the work occurs
C. The project manager is assigned after the project is defined, and the cost and schedule are approved
D. A clear objective is not provided
E. All of the above are possible based upon the situation
第14题:
● The scope of a project can be expected to change if:
A The project manager must provide cost estimates without having a design concept
B Oversimplification (underestimating) of the nature of the work occurs
C The project manager is assigned after the project is defined, and the cost and schedule are approved
D A clear objective is not provided
E All of the above are possible based upon the situation
第15题:
此题为判断题(对,错)。
第16题:
A.rewards
B.rewarded
C.rewarding
D.reward
第17题:
–What do you think of teaching, Bob?
–I find it fun and challenging. It is a job ___ you are doing something serious but interesting.
A. whereB. Which C. When D. that
第18题:
第19题:
Which statement is true regarding the creation of nested plans using Resource Manager?()
第20题:
Having passed
Passing
Being that she passed
If she had passed
For her passing
第21题:
encounter
acquaint
preside
confront
第22题:
GridLayout.
CardLayout.
FlowLayout.
BorderLayout.
GridBagLayout.
第23题:
Only one nested subplan is allowed.
The plans can be nested up to four levels.
Resource Manager does not support nested plans.
Nested plans control only the degree of parallelism but not the CPU.
Each nested plan gets a proportion of the CPU resources assigned to its parent group.