Make the changes in HACMP and synchronize the cluster.
It cannot, because changes like this cannot be made while the cluster is running.
Make the changes in HACMP and wait until the next failure for the changes to take affect.
Use the forced option to stop the cluster,make the changes,and restart cluster services.
第1题:
An administrator uses C-SPOC to change the user password for all nodes that belong to a Resource group. The administrator must perform this operation on a node that is:()
第2题:
In a cluster using /etc/hosts for name resolution, which of the following describes the minimum requirementsfor the /etc/hosts file?()
第3题:
During initial cluster planning session, a requirement is mandated that application monitoring will Be used to monitor the production database and three application servers. Since all the application servers rely on the database being active, only one resource group has been planned to manage the starting/stopping of the cluster resources. How ill the initial design impact the use of application monitoring?()
第4题:
Company.com is implementing an HACMP solution. The application ahs a license key based on The hostname. The hostname is also the name used for one of the TCP/IP interfaces. The application vendor has worked with HACMP systems before and is aware of the issue. The preferred method for resolving this issue is to:()
第5题:
Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?()
第6题:
include the hostname in the resource group definition.
include the license key in the resource group definition.
obtain a second license key for a standby system from the application vendor.
Set the hostname to be one of the TCP/IP interface included in a resource group.
第7题:
IPAT using IP Replacement without MAC address takeover.
IPAT using IP Aliasing and hardware MAC address takeover.
None because continuous telnet connectivity cannot be provided with HACMP.
Shared service IP address assigned to multiple network interface cards on each node.
第8题:
Make the changes in HACMP and synchronize the cluster.
It cannot, because changes like this cannot be made while the cluster is running.
Make the changes in HACMP and wait until the next failure for the changes to take affect.
Use the forced option to stop the cluster,make the changes,and restart cluster services.
第9题:
Change the cluster to a rotating design.
Change the Cascading without Fallback flag to true.
Change the Inactive Takeover field to false in the cluster configuration.
Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
第10题:
included in the resource group.
currently managing the resource group.
not part of an application resource group.
included in a cluster_admin resource group.
第11题:
Only one application server per resource group can be monitored.
Process monitoring is part of RSCT and requires no special scripts.
Any application can be monitored as long as it has an application server.
Having all application servers in one resource group improves recovery time.
第12题:
Increase the size of the JFS log logical volume so more transacations can be written to this log.
Create a second, additional JFS log and have the /mydatabase logical volume point to both JFS logs.
Migrate the JFS log device to another physical disk in the same volume group.
Only one JFS log device for each volume group can be used. Use the migratepv command to move the JFS log device to an empty disk in another volume group.
第13题:
The IP subsystem fallover behavior of a two-node cluster is being testing in a large client organization. One of the tests is to simulate a network_down event and verify that HACMP movesthe single resource group to the standby node. What is the best way to simulate a network down condition?()
第14题:
An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()
第15题:
Company.com has a resource group that contains a database that is accessed by a web client based on another system. The communication to the database is TCP/IP. Occasionally after a failure, the end users get unusual error messages that indicate the database server is not available. It has been determined that the web server is trying to access the database server’s information before it has completed file system recovery after a failure. How can HACMP affect this problem?()
第16题:
One service IP label and one volume group are assigned to a resource group in a cluster. An Additional service IP label and volume group need to be added to the resource group. How can this be done with the minimum disruption of the cluster?()
第17题:
A loss of quorum has occurred on one of the disks in the failed volume group.
Selective fallover caused by an application moves a resource group to a takeover node.
A check is made to ensure at least one complete copy of all data is available in the volume group.
The MISSING_PV=TRUE environment variable has been set causing the volume group to be forced online.
第18题:
Create a custom resource group with a custom fallback timer to cause the system shutdown at he appropriate time.
Set the system to stop with shutdown command at the appropriate time and allow HACMP to relocate the resources.
Use a script that calls the cIRGmove command and place it in the cron or a queue to execute at the appropriate time.
Change the existing resource groups to a custom type and add a timer to perform a shutdown -h command at the appropriate time.
第19题:
IP address and IP label of each service and boot interface in the cluster
IP address and IP label of each service and boot interface in the cluster, loopback interface, and the hostname of the node
IP address and IP label of each service and boot interface in the cluster, the loopbackinterface, and the cluster gateway
IP address and IP label of each service and boot interface in the cluster, the loopbackinterface, the cluster gateway, and the subnet network addresses
第20题:
The concurrent application must control the web interface through application monitoring.
A second resource group will be required to move the web application and IP label to a new node during a node failure.
The concurrent resource group can support multiple IP labels through IP aliasing so all IP labels are defined in the concurrent resource group.
The dynamic node priority facility in HACMP will relocate the web application and the IP label,if it is correctly defined in the application start and stop script.
第21题:
The administrator will need to perform an rg_move operation
The administrator will need to un-manage and re-manage the resource group
The administrator will need to execute the new start script from the command line
The new start script will be executed as part of the DARE operation to synchronize the cluster
第22题:
Change the quorum required to false.
Change the Volume Group auto vary on to yes, and then vary off the Volume Group.
Change the auto vary on value of the Volume Group to no, and then vary off the volume group.
Set the Volume Group major number to the same value that the Volume Group had on the system on which it was created.
第23题:
Turn off the IP core switch connecting the two nodes.
Issue the command stopsrc -g inetd on the node that has the resource group.
Issue the command sh /etc/rc.tcpclean on the node that has the resource group.
Simultaneously unplug all network cables from the node that has the resource group.
第24题:
HACMP can resequence the order to the starting of the various resource group elements by utilizing Dynamic Node Priority.
The order of dependency can be controlled though the HACMP resource group configuration if the web server was made to be part of the HACMP cluster.
HACMP can delay making the network label available until after the filesystem checks have completed with the filesystem mounted before IP is configured.
The IP service label can be in a second resource group allowing the sequential processing of resource groups to control when the IP service label is made available.