单选题A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which 

题目
单选题
A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()
A

Copper Pass-thru Modules only support 1000Mb line speeds. 

B

Spanning Tree has been enabled on the Copper Pass-thru Module. 

C

The customer does not have the latest firmware loaded on the Copper Pass-thru Module. 

D

The customer is using LS21 Blades 


相似考题
更多“单选题A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which ”相关问题
  • 第1题:

    A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()

    • A、Two dual-port PCIe adapters
    • B、A four-port PCIe Ethernet adapter
    • C、Four separate PCIe Ethernet adapters
    • D、Two embedded Integrated Virtual Ethernet adapters (IVE)

    正确答案:C

  • 第2题:

    A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()

    • A、Copper Pass-thru Modules only support 1000Mb line speeds. 
    • B、Spanning Tree has been enabled on the Copper Pass-thru Module. 
    • C、The customer does not have the latest firmware loaded on the Copper Pass-thru Module. 
    • D、The customer is using LS21 Blades 

    正确答案:A

  • 第3题:

    When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why?()

    • A、xSeries specialist,as the customer may have some Intel-based systems.
    • B、Hardware customer engineer,as they will be installing the entire solution.
    • C、Services specialist,as they can provide education recommendations for the entire solution. 
    • D、Storage specialist,as the customer may need disk to store the data and tape to backup the data.

    正确答案:D

  • 第4题:

    A customer is looking for a scalable KVM solution that supports at least 512 servers and is manageable locally and through the IP network.  Which IBM KVM solution should a specialist propose to this customer?()

    • A、1 x 8 console switch
    • B、2 x 16 console switch
    • C、2 x 8 Local Console Manager 2
    • D、2 x 16 Global Console Manager 2

    正确答案:D

  • 第5题:

    A customer is concerned about the high energy cost associated with their data center. Specifically, their concern focuses on the cooling cost of many hundreds of servers. You have a meeting with the CIO and CFO to propose a solution.  How would you prepare yourself for the meeting? ()

    • A、Since their capacities and usage models vary, ask the customer to turn off some of the servers during off-peak and low demand time.
    • B、Investigate their expansion plans and suggest to the customer the removal of some of their servers to another location and retirement of the older servers.
    • C、Contact the CFO to find out the targeted energy savings of the company and propose to the customer the purchase of a more efficient cooling system.
    • D、Contact the CIO for a list of servers and type/model numbers. Complete a proposal outlining the savings on energy cost by deploying an IBM BladeCenter solution and total cost of ownership and return on investment.

    正确答案:D

  • 第6题:

    单选题
    When designing a single tier AIX database solution for a customer, what other technical specialist would be most instrumental in putting together a total solution and why?()
    A

    xSeries specialist,as the customer may have some Intel-based systems.

    B

    Hardware customer engineer,as they will be installing the entire solution.

    C

    Services specialist,as they can provide education recommendations for the entire solution. 

    D

    Storage specialist,as the customer may need disk to store the data and tape to backup the data.


    正确答案: D
    解析: 暂无解析

  • 第7题:

    单选题
    A customer is concerned about the high energy cost associated with their data center. Specifically, their concern focuses on the cooling cost of many hundreds of servers. You have a meeting with the CIO and CFO to propose a solution.  How would you prepare yourself for the meeting? ()
    A

    Since their capacities and usage models vary, ask the customer to turn off some of the servers during off-peak and low demand time.

    B

    Investigate their expansion plans and suggest to the customer the removal of some of their servers to another location and retirement of the older servers.

    C

    Contact the CFO to find out the targeted energy savings of the company and propose to the customer the purchase of a more efficient cooling system.

    D

    Contact the CIO for a list of servers and type/model numbers. Complete a proposal outlining the savings on energy cost by deploying an IBM BladeCenter solution and total cost of ownership and return on investment.


    正确答案: D
    解析: 暂无解析

  • 第8题:

    单选题
    A customer is considering purchasing either a Cisco Catalyst 2960 or Cisco Catalyst Express 500. Which feature can only be found on the Catalyst 2960?()
    A

     48 Ethernet 10/100 ports

    B

     Fast Ethernet and Gigabit Ethernet connectivity

    C

     dual-purpose copper or fiber uplinks

    D

     standalone fixed-configuration Layer 2 switching


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    A Sales Specialist receives an email from a customer, requesting information on IBM’s best Server Consolidation solution. How should the Sales Specialist proceed? ()
    A

    Send the customer information on VMware

    B

    Send the customer information on IBM BladeCenter 

    C

    Call the customer to ask why they are consolidating

    D

    Send the customer information on IBM System P


    正确答案: B
    解析: 暂无解析

  • 第10题:

    单选题
    A customer is running an application with large block files that contain images and video files.  They have a requirement for a low cost storage solution.  The consultant recommended considering the NAS solution.  Which of the following benefits will the NAS solution provide?()
    A

    Utilizes existing infrastructure

    B

    Provides direct host attached solution

    C

    NAS storage will use the reliable iSCSI protocol

    D

    Long distances after upgrading all host connections to fibre


    正确答案: A
    解析: 暂无解析

  • 第11题:

    单选题
    Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()
    A

    The customer is looking for a fibre SAN solution to increase reliability and performance.

    B

    The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.

    C

    The customer is cost-conscious and is looking for a centralized storage solution.

    D

    The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.


    正确答案: B
    解析: 暂无解析

  • 第12题:

    单选题
    A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM).  What TRUE statement should be mentioned to the customer regarding the OPM?()
    A

    You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.

    B

    Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.

    C

    The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.

    D

    The blade servers do not work with the Optical Pass-Thru Module.


    正确答案: B
    解析: 暂无解析

  • 第13题:

    A customer is interested in obtaining an AIX solution from IBM.  They have two primary global requirements:   ? Availability (although HACMP is not required)   ? Low cost   Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()

    • A、Design the least-cost solution to prevent the competition from winning the business.
    • B、Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.
    • C、Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.
    • D、Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.

    正确答案:D

  • 第14题:

    A customer is running an application with large block files that contain images and video files.  They have a requirement for a low cost storage solution.  The consultant recommended considering the NAS solution.  Which of the following benefits will the NAS solution provide?()

    • A、Utilizes existing infrastructure
    • B、Provides direct host attached solution
    • C、NAS storage will use the reliable iSCSI protocol
    • D、Long distances after upgrading all host connections to fibre

    正确答案:A

  • 第15题:

    A Sales Specialist receives an email from a customer, requesting information on IBM’s best Server Consolidation solution. How should the Sales Specialist proceed? ()

    • A、Send the customer information on VMware
    • B、Send the customer information on IBM BladeCenter 
    • C、Call the customer to ask why they are consolidating
    • D、Send the customer information on IBM System P

    正确答案:C

  • 第16题:

    A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM).  What TRUE statement should be mentioned to the customer regarding the OPM?()

    • A、You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.
    • B、Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.
    • C、The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.
    • D、The blade servers do not work with the Optical Pass-Thru Module.

    正确答案:B

  • 第17题:

    Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()

    • A、The customer is looking for a fibre SAN solution to increase reliability and performance.
    • B、The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.
    • C、The customer is cost-conscious and is looking for a centralized storage solution.
    • D、The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.

    正确答案:C

  • 第18题:

    单选题
    A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()
    A

    Two dual-port PCIe adapters

    B

    A four-port PCIe Ethernet adapter

    C

    Four separate PCIe Ethernet adapters

    D

    Two embedded Integrated Virtual Ethernet adapters (IVE)


    正确答案: A
    解析: 暂无解析

  • 第19题:

    单选题
    A customer wants to boot from SAN with their IBM BladeCenter infrastructure.  What is required for the customer to be able to perform this? ()
    A

    4GB Modular Flash Drive for each Blade Server and Dual 15.8GB 2.5 Solid State Drive for each Blade Server 

    B

    Cisco Intelligent Gb Ethernet Switch Module and IBM BladeCenter Copper Pass-thru Module 

    C

    Fibre Channel Expansion Card for each Blade Server and Fibre Channel SAN Switch Module 

    D

    Cisco Intelligent Gb Ethernet Switch Module and Dual 15.8GB 2.5 Solid State Drive for each Blade Server


    正确答案: C
    解析: 暂无解析

  • 第20题:

    单选题
    A customer is interested in a power efficient server solution. The Sales Specialist has recommended a BladeCenter solution. The customer debates the price is high compared to rack servers.  Which of the following should the Sales Specialist emphasize to address the pricing difference?()
    A

    Higher rack density that reduces data center footprints

    B

    Internal upgrades that only IBM can offer

    C

    Total Cost of Ownership (TCO) related to innovative components such as Integrated Switches 

    D

    The Rear Door Heat eXchanger that only IBM can offer


    正确答案: B
    解析: 暂无解析

  • 第21题:

    单选题
    A customer is interested in obtaining an AIX solution from IBM.  They have two primary global requirements:   ? Availability (although HACMP is not required)   ? Low cost   Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()
    A

    Design the least-cost solution to prevent the competition from winning the business.

    B

    Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.

    C

    Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.

    D

    Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.


    正确答案: C
    解析: 暂无解析

  • 第22题:

    单选题
    A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which of the following at is causing the problem?()
    A

    Copper Pass-thru Modules only support 1000Mb line speeds. 

    B

    Spanning Tree has been enabled on the Copper Pass-thru Module. 

    C

    The customer does not have the latest firmware loaded on the Copper Pass-thru Module. 

    D

    The customer is using LS21 Blades 


    正确答案: A
    解析: 暂无解析

  • 第23题:

    单选题
    A manufacturing customer has an existing SAN for their AIX servers and they want to add theirWindows servers with file level access to their existing storage pool. Which of the following is thelowest cost solution?()
    A

    N7900 

    B

    N6040 

    C

    DS3300 

    D

    DS3500


    正确答案: C
    解析: 暂无解析

  • 第24题:

    多选题
    A customer is planning to implement a new x445 in their datacenter.Which TWO of the following should the customer prepare prior to the implementation to ensure a trouble free installation?()
    A

    Install the exhaust fan on top of the IBM NetBAY 42 Enterprise rack for extra cooling

    B

    Ensure a 260V power source for the x445 and BladeCenter is available for fully redundant power

    C

    Ensure a 220v power source for the x445 is available for fully redundant power

    D

    Install the new 10GBit Ethernet network to take advantage of the new network switch in the x445.

    E

    Have their Network Operation Staff review and assist connecting the new server to their existing network.


    正确答案: A,C
    解析: 暂无解析