单选题An administrator has configured a two node cluster, Node1 and Node2 with two resource groups, RG1 andRG2. The resource groups are configured as follows: RG1: Participating Nodes: Node1, Node2 Startup Policy: Online On Home Node Only Fallover Policy: Fa

题目
单选题
An administrator has configured a two node cluster, Node1 and Node2 with two resource groups, RG1 andRG2. The resource groups are configured as follows: RG1: Participating Nodes: Node1, Node2 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy Never Fallback RG2: Participating Nodes: Node2, Node1 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy: Fallback To Higher Priority NodeIn The List An Online on Different Nodes Dependency has been configured as:High Priority Resource Groups: RG2 Intermediate Priority Resource Group: RG1 The cluster has been running without any problems with both resource groups on their home nodes whenNode1 suffers a critical operating system problem causing the node to halt.What is the status of the resource groups?()()
A

RG1 is Online RG2 is Online

B

RG1 is Online RG2 is Offline

C

RG1 is Offline RG2 is Online

D

RG1 is Offline RG2 is Offline


相似考题
更多“单选题An administrator has configured a two node cluster, Node1 and Node2 with two resource groups, RG1 andRG2. The resource groups are configured as follows: RG1: Participating Nodes: Node1, Node2 Startup Policy: Online On Home Node Only Fallover Policy: Fa”相关问题
  • 第1题:

    A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’.  What type of configuration would cause this type of behavior?()  

    • A、 The resource group DNP has been configured.
    • B、 The resource group option CWOF has been enabled.
    • C、 The resource group option Inactive Takeover is set.
    • D、 A resource group fallback timer has been configured.

    正确答案:B

  • 第2题:

    An enterprise has three nodes: -Node ’A’ is a production database, -Node ’B’ is a production  Application server, and -Node ’C’ is a test and development node. Node ’C’ is used by six programmers to develop and the production application as business critical and would like to make it highly available with HACMP. Application development and testing is not business critical.  Which of the following describes the best solution?()  

    • A、 There is not an adequate solution because HACMP should not be configured in this environment without a dedicated standby node.
    • B、 Nodes ’A’ and ’B’ should be configured in a cluster with mutual fallover of two cascading resource groups to provide both nodes will deliver acceptable response time with both resource groups.
    • C、 Nodes ’A’ and ’C’ should be configured in one cluster, and Nodes ’B’ and ’C’ in another cluster to prevent both the database and application server from falling over to Node ’C’ at the same time.
    • D、 Nodes ’A’, ’B’, and ’C’ should be configured in a cluster with Node ’C’ the hot standby for both the database and application server resource groups. Workload Manager (WLM) must be configured on database and application developers from over utilizing the CPU resources.

    正确答案:B

  • 第3题:

    An administrator is configuring a PowerHA cluster consisting of two nodes across two physical Power systems,570-1 and 570-2. Node1 is an LPAR on 570-1Node2 is an LPAR on 570-2. Dev1 is an LPAR on 570-2 (this LPAR is not part of the cluster). The cluster will manage a single resource group, RG1, with a single application server, APP1. The resourcegroup will have a home node of Node1. Node1 is configured with 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processorsNode2 isconfigured with 0.4 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors Dev1 is configuredwith 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors When the resource group RG1 is acquired by Node2 the administrator would like to dynamically move 3.6processor entitlement units from Dev1 to Node2. How could the administrator achieve this in the PowerHAcluster?()

    • A、Create a custom event script to perform the change to CPU entitlement
    • B、Modify the extended performance tuning parameters for the cluster to modify CPU entitlement uponresource group acquisition
    • C、Customize the resource group attributes of RG1 so that the CPU entitlement is modified for Node2 uponresource group acquisition
    • D、Customize the application server attributes of APP1 so that the CPU entitlement is modified for Node2upon resource group acquisition

    正确答案:A

  • 第4题:

    You have a server that runs Windows Server 2008 Enterprise Edition. The server has the Failover Clustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3.  The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster has a dedicated cluster group named Group1 that includes the MSDTC resource.  You discover that Group1 is unable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functions without errors.   You need to configure Group1 to support the failover between all cluster nodes. What should you do?()

    • A、Remove the MSDTC resource from Group1.
    • B、Select NODE3 as a preferred owner for Group1.
    • C、Remove NODE3 as a possible owner from all cluster resources in Group1.
    • D、Configure NODE3 as a possible owner for all cluster resources in Group1.

    正确答案:D

  • 第5题:

    单选题
    An administrator was notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 had been powered off. Upon restarting Node1 the administrator checked the AIXerror log and the cluster.log Which of the following is most likely the cause of the failover?()
    A

    AIX was shut down

    B

    A fatal corruption occurred in the gsclvmd daemon

    C

    The topsvcs daemon was stopped by the system resource controller

    D

    The grpsvcs process was stopped by the system resource controller


    正确答案: D
    解析: 暂无解析

  • 第6题:

    单选题
    An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?()
    A

    Configure the resource group with a fallback policy of Fallback to Higher Priority Node Restart Node1 at20:00

    B

    Configure the resource group with a fallback policy of Never Fallback Manually move the resource groupfrom Node2 to Node1 at 20:00

    C

    Configure the resource group with a fallback policy of Fallback To Higher Priority Node Create aDelayed Fallback Timer policy to meet the requirements Allocate this delayed timer policy to theresource group RG1

    D

    Configure the resource group with a fallback policy of Never Fallback Create a Delayed Fallback Timerpolicy to meet the requirement Specify this delayed timer policy as a Fallback Override to the resourcegroup RG1


    正确答案: C
    解析: 暂无解析

  • 第7题:

    单选题
    An administrator is planning a cluster running applications in 3 separate resource groups. RGA - Database 1 RGB - Web Server RGC - Database 2 Database 1 and Database 2 must be online before the Web Server. All resource groups have a Startup Policyof Online on Home Node Only. Which of the following will ensure that the resource groups are processed in the correct order?()
    A

    Set the Serial Acquisition Order

    B

    Set the Parallel Acquisition Order

    C

    Configure Online on the Same Node Dependency

    D

    Configure Online on Different Nodes Dependency


    正确答案: A
    解析: 暂无解析

  • 第8题:

    单选题
    An administrator is configuring a PowerHA cluster consisting of two nodes across two physical Power systems,570-1 and 570-2. Node1 is an LPAR on 570-1Node2 is an LPAR on 570-2. Dev1 is an LPAR on 570-2 (this LPAR is not part of the cluster). The cluster will manage a single resource group, RG1, with a single application server, APP1. The resourcegroup will have a home node of Node1. Node1 is configured with 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processorsNode2 isconfigured with 0.4 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors Dev1 is configuredwith 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors When the resource group RG1 is acquired by Node2 the administrator would like to dynamically move 3.6processor entitlement units from Dev1 to Node2. How could the administrator achieve this in the PowerHAcluster?()
    A

    Create a custom event script to perform the change to CPU entitlement

    B

    Modify the extended performance tuning parameters for the cluster to modify CPU entitlement uponresource group acquisition

    C

    Customize the resource group attributes of RG1 so that the CPU entitlement is modified for Node2 uponresource group acquisition

    D

    Customize the application server attributes of APP1 so that the CPU entitlement is modified for Node2upon resource group acquisition


    正确答案: A
    解析: 暂无解析

  • 第9题:

    单选题
    A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’.  What type of configuration would cause this type of behavior?()
    A

     The resource group DNP has been configured.

    B

     The resource group option CWOF has been enabled.

    C

     The resource group option Inactive Takeover is set.

    D

     A resource group fallback timer has been configured.


    正确答案: A
    解析: 暂无解析

  • 第10题:

    单选题
    You have a server that runs Windows Server 2008 Enterprise Edition. The server has the Failover Clustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3.  The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster has a dedicated cluster group named Group1 that includes the MSDTC resource.  You discover that Group1 is unable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functions without errors.   You need to configure Group1 to support the failover between all cluster nodes. What should you do?()
    A

    Remove the MSDTC resource from Group1.

    B

    Select NODE3 as a preferred owner for Group1.

    C

    Remove NODE3 as a possible owner from all cluster resources in Group1.

    D

    Configure NODE3 as a possible owner for all cluster resources in Group1.


    正确答案: B
    解析: 暂无解析

  • 第11题:

    单选题
    An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?()
    A

    Configure the resource group with a fallback policy of Fallback to Higher Priority Node Restart Node1 at20:00

    B

    Configure the resource group with a fallback policy of Never Fallback Manually move the resource groupfrom Node2 to Node1 at 20:00

    C

    Configure the resource group with a fallback policy of Fallback To Higher Priority Node Create aDelayed Fallback Timer policy to meet the requirements Allocate this delayed timer policy to theresource group RG1

    D

    Configure the resource group with a fallback policy of Never Fallback Create a Delayed Fallback Timerpolicy to meet the requirement Specify this delayed timer policy as a Fallback Override to the resourcegroup RG1


    正确答案: D
    解析: 暂无解析

  • 第12题:

    单选题
    Company.com has a three-node cluster (Node ’A’, Node ’B’, and Node ’C’) with three resource  Groups (rg1, rg2, and rg3). Node ’A’ has twice as many CPUs and twice as much memory as the two test add development Nodes ’B’ and ’C’. During normal production processing, all resource groups are active on Node ’A’.  What is most efficient way to configure the cluster to manage the workload?()
    A

     Use thee cascading resource groups where ’rg1’ and ’rg2’ fallover to Node ’B’ and ’rg3’ falls over to Node ’C’

    B

     Use Dynamic Node Priority resource groups with a priority chain consisting of Node ’A’ then Node ’B’ then Node ’C’

    C

     Use three rotating resource groups with ’rg1’ and ’rg2’ falling over to node ’B’ and ’rg3’ falling over to Node ’C’

    D

     Upgrade Nodes ’B’ and ’C’ to be equal to Node ’A in CPU and memory resources to enable the cluster to synchronize three resource groups


    正确答案: A
    解析: 暂无解析

  • 第13题:

    An administrator is notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 has been powered off. Upon restarting Node1 the administrator checks the AIXerror log and the cluster.log Which of the following is the most likely cause of the failure of Node1?()

    • A、The operating system crashed
    • B、A disk failure forced a volume group off line
    • C、The System Resource Controller executed a system halt
    • D、The topology services daemon has crashed due to an ODM mismatch

    正确答案:C

  • 第14题:

    An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()

    • A、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2
    • B、Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’
    • C、Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.
    • D、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2

    正确答案:D

  • 第15题:

    An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?()

    • A、Configure the resource group with a fallback policy of "Fallback to Higher Priority Node" Restart Node1 at20:00
    • B、Configure the resource group with a fallback policy of "Never Fallback" Manually move the resource groupfrom Node2 to Node1 at 20:00
    • C、Configure the resource group with a fallback policy of "Fallback To Higher Priority Node" Create a"Delayed Fallback Timer" policy to meet the requirements Allocate this delayed timer policy to theresource group RG1
    • D、Configure the resource group with a fallback policy of "Never Fallback" Create a "Delayed Fallback Timer"policy to meet the requirement Specify this delayed timer policy as a "Fallback Override" to the resourcegroup RG1

    正确答案:C

  • 第16题:

    An administrator was notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 had been powered off. Upon restarting Node1 the administrator checked the AIXerror log and the cluster.log Which of the following is most likely the cause of the failover?()

    • A、AIX was shut down
    • B、A fatal corruption occurred in the gsclvmd daemon
    • C、The topsvcs daemon was stopped by the system resource controller
    • D、The grpsvcs process was stopped by the system resource controller

    正确答案:C

  • 第17题:

    单选题
    A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()
    A

    rg1 is configured with a delayed fallback timer

    B

    Settling time policy has not been configured for rg1

    C

    Node1 does not have sufficient resources to support rg1

    D

    Node2 is the first in the ’Default Node Priority’ list for resource group rg1


    正确答案: B
    解析: 暂无解析

  • 第18题:

    单选题
    An administrator has configured a two node cluster, Node1 and Node2 with two resource groups, RG1 andRG2. The resource groups are configured as follows: RG1: Participating Nodes: Node1, Node2 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy Never Fallback RG2: Participating Nodes: Node2, Node1 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy: Fallback To Higher Priority NodeIn The List An Online on Different Nodes Dependency has been configured as:High Priority Resource Groups: RG2 Intermediate Priority Resource Group: RG1 The cluster has been running without any problems with both resource groups on their home nodes whenNode1 suffers a critical operating system problem causing the node to halt.What is the status of the resource groups?()()
    A

    RG1 is Online RG2 is Online

    B

    RG1 is Online RG2 is Offline

    C

    RG1 is Offline RG2 is Online

    D

    RG1 is Offline RG2 is Offline


    正确答案: C
    解析: 暂无解析

  • 第19题:

    单选题
    An administrator is configuring a PowerHA cluster consisting of two nodes across two physical Power systems,570-1 and 570-2. Node1 is an LPAR on 570-1Node2 is an LPAR on 570-2. Dev1 is an LPAR on 570-2 (this LPAR is not part of the cluster). The cluster will manage a single resource group, RG1, with a single application server, APP1. The resourcegroup will have a home node of Node1. Node1 is configured with 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processorsNode2 isconfigured with 0.4 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors Dev1 is configuredwith 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors When the resource group RG1 is acquired by Node2 the administrator would like to dynamically move 3.6processor entitlement units from Dev1 to Node2. How could the administrator achieve this in the PowerHAcluster?()
    A

    Create a custom event script to perform the change to CPU entitlement

    B

    Modify the extended performance tuning parameters for the cluster to modify CPU entitlement uponresource group acquisition

    C

    Customize the resource group attributes of RG1 so that the CPU entitlement is modified for Node2 uponresource group acquisition

    D

    Customize the application server attributes of APP1 so that the CPU entitlement is modified for Node2upon resource group acquisition


    正确答案: B
    解析: 暂无解析

  • 第20题:

    单选题
    An administrator is notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 has been powered off. Upon restarting Node1 the administrator checks the AIXerror log and the cluster.log Which of the following is the most likely cause of the failure of Node1?()
    A

    The operating system crashed

    B

    A disk failure forced a volume group off line

    C

    The System Resource Controller executed a system halt

    D

    The topology services daemon has crashed due to an ODM mismatch


    正确答案: D
    解析: 暂无解析

  • 第21题:

    单选题
    An enterprise has three nodes: -Node ’A’ is a production database, -Node ’B’ is a production  Application server, and -Node ’C’ is a test and development node. Node ’C’ is used by six programmers to develop and the production application as business critical and would like to make it highly available with HACMP. Application development and testing is not business critical.  Which of the following describes the best solution?()
    A

     There is not an adequate solution because HACMP should not be configured in this environment without a dedicated standby node.

    B

     Nodes ’A’ and ’B’ should be configured in a cluster with mutual fallover of two cascading resource groups to provide both nodes will deliver acceptable response time with both resource groups.

    C

     Nodes ’A’ and ’C’ should be configured in one cluster, and Nodes ’B’ and ’C’ in another cluster to prevent both the database and application server from falling over to Node ’C’ at the same time.

    D

     Nodes ’A’, ’B’, and ’C’ should be configured in a cluster with Node ’C’ the hot standby for both the database and application server resource groups. Workload Manager (WLM) must be configured on database and application developers from over utilizing the CPU resources.


    正确答案: D
    解析: 暂无解析

  • 第22题:

    单选题
    An administrator has configured a two node cluster, Node1 and Node2 with two resource groups, RG1 andRG2. The resource groups are configured as follows: RG1: Participating Nodes: Node1, Node2 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy Never Fallback RG2: Participating Nodes: Node2, Node1 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy: Fallback To Higher Priority NodeIn The List An Online on Different Nodes Dependency has been configured as:High Priority Resource Groups: RG2 Intermediate Priority Resource Group: RG1 The cluster has been running without any problems with both resource groups on their home nodes whenNode1 suffers a critical operating system problem causing the node to halt.What is the status of the resource groups?()()
    A

    RG1 is Online RG2 is Online

    B

    RG1 is Online RG2 is Offline

    C

    RG1 is Offline RG2 is Online

    D

    RG1 is Offline RG2 is Offline


    正确答案: C
    解析: 暂无解析

  • 第23题:

    单选题
    An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()
    A

    Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2

    B

    Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’

    C

    Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.

    D

    Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2


    正确答案: B
    解析: 暂无解析

  • 第24题:

    单选题
    A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()
    A

    rg1 is configured with a delayed fallback timer

    B

    Settling time policy has not been configured for rg1

    C

    Node1 does not have sufficient resources to support rg1

    D

    Node2 is the first in the ’Default Node Priority’ list for resource group rg1


    正确答案: A